WisDOT contract 20260310025 bid tabulation

1520-00-74. Let by Wisconsin DOT on March 10, 2026, Wood. 7 bids received; low bid $4,344,262 by Haas Sons, Inc..

Owner
Wisconsin DOT
Letting
10 MAR 2026
Pay items
176
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Haas Sons, Inc.$4,344,262Low
2Earth, Inc.$4,429,543+2.0%
3Mashuda Contractors, Inc.$4,452,247+2.0%
4James Peterson Sons, Inc.$4,560,664+5.0%
5McCabe Construction, Inc.$4,621,230+6.0%
6Gerke Excavating Inc$4,680,901+8.0%
7Integrity Grading and Excavating, Inc.$4,754,748+9.0%
WisDOT contract 20260310025: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Haas Sons, Inc.2. Earth, Inc.3. Mashuda Contractors, Inc.4. James Peterson Sons, Inc.5. McCabe Construction, Inc.6. Gerke Excavating Inc
1Removing small pipe culverts (203.0100)EACH5$1,063.96$1,000.00$350.00$500.00$800.00$739.40
2Removing structure (structure) 01. C-71-9002 (203.0220)EACH1$11,519$12,000$4,000.00$1,500.00$7,150.00$5,820.12
3Removing concrete pavement (204.0100)SY92$150.66$10.00$10.00$12.57$11.00$10.74
4Removing asphaltic surface (204.0110)SY2,817$6.48$6.00$3.00$10.00$4.00$3.06
5Removing asphaltic surface butt joints (204.0115)SY786$3.79$11.00$11.30$11.30$11.75$2.65
6Removing asphaltic surface milling (204.0120)SY32,340$2.46$3.15$3.43$3.43$3.57$1.70
7Removing gutter (204.0140)LF1,430$5.46$4.00$2.00$3.00$3.00$2.01
8Removing curb & gutter (204.0150)LF4,767$9.66$5.00$3.75$5.48$5.00$3.20
9Removing concrete sidewalk (204.0155)SY660$8.12$10.00$10.00$33.50$10.00$4.93
10Removing inlets (204.0220)EACH2$524.71$500.00$500.00$450.00$400.00$248.16
11Removing storm sewer (size) 01. 24-inch (204.0245)LF120$20.69$20.00$25.00$36.40$22.00$12.41
12Excavation common (205.0100)CY26,105$9.11$9.00$7.67$9.83$14.35$13.20
13Finishing roadway (project) 01. 1520-00-74 (213.0100)EACH1$725.12$5,000.00$550.00$2,500.00$1,305.00$3,545.36
14Finishing roadway (project) 02. 1620-02-77 (213.0100)EACH1$2,175.37$5,000.00$325.00$2,500.00$1,305.00$3,545.36
15Base aggregate dense 3/4-inch (305.0110)TON546$26.49$26.00$26.46$28.87$24.25$26.82
16Base aggregate dense 1 1/4-inch (305.0120)TON18,625$15.99$15.25$17.05$18.56$17.50$17.30
17Base aggregate open-graded (310.0110)TON147$24.63$25.00$40.50$21.33$35.00$63.93
18Select crushed material (312.0110)TON17,857$14.94$14.00$19.95$15.86$17.52$18.41
19QMP base aggregate dense 1 1/4- inch compaction (371.2000.S)EACH9$737.04$750.00$750.00$775.00$766.00$773.89
20Coloring concrete wisdot red (405.0100)CY352$100.00$100.00$82.95$82.95$86.27$87.10
21Concrete truck apron 12-inch (415.2010)SY1,055$107.00$107.00$93.18$93.18$96.91$97.84
22Tack coat (455.0605)GAL6,664$5.45$5.50$5.45$5.45$5.67$5.72
23Incentive density HMA pavement (460.2000)DOL7,391$1.00$1.00$1.00$1.00$1.00$1.00
24HMA pavement 4 MT 58-28 S (460.6224)TON3,247$110.20$110.50$110.20$110.20$114.62$115.71
25HMA pavement 4 MT 58-28 H (460.6424)TON3,247$115.80$116.00$115.80$115.80$120.45$121.59
26HMA pavement 3 HT 58-28 S (460.7223)TON3,609$110.40$110.54$110.40$110.40$114.83$115.92
27HMA pavement 4 HT 58-28 V (460.7624)TON1,442$119.50$119.50$119.50$119.50$124.29$125.48
28Asphaltic surface (465.0105)TON562$164.45$164.50$164.45$164.45$171.05$172.67
29Asphaltic surface patching (465.0110)TON104$214.45$214.50$214.45$214.45$223.05$225.17
30Asphaltic surface driveways and field entrances (465.0120)TON93$210.10$210.50$210.10$210.10$218.53$220.61
31Asphaltic flumes (465.0315)SY100$88.95$89.00$88.95$88.95$92.52$93.40
32Asphaltic rumble strips, centerline (465.0560)LF218$15.00$16.00$6.41$6.41$6.67$15.75
33Apron endwalls for culvert pipe 18- inch (520.1018)EACH7$882.61$275.00$710.00$269.65$521.00$996.86
34Apron endwalls for culvert pipe 21- inch (520.1021)EACH2$589.02$300.00$444.00$346.28$460.00$486.04
35Apron endwalls for culvert pipe 24- inch (520.1024)EACH3$1,063.29$400.00$740.00$175.00$460.00$1,027.76
36Culvert pipe class III-A 18-inch (520.3318)LF96$58.90$80.00$61.00$96.53$65.00$38.37
37Culvert pipe class III-A 21-inch (520.3321)LF50$58.90$83.00$66.25$101.13$76.00$41.61
38Culvert pipe class III-A 24-inch (520.3324)LF112$58.90$88.00$74.75$105.33$125.00$45.61
39Culvert pipe reinforced concrete class III 96-inch (522.0196)LF86$1,266.29$1,245.00$1,372.00$1,205.61$1,150.00$1,474.36
40Culvert pipe reinforced concrete class IV 36-inch (522.0436)LF67$302.02$245.00$261.25$257.47$350.00$380.96
41Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH2$2,301.19$5,000.00$2,168.00$2,989.81$2,600.00$2,971.70
42Concrete curb & gutter 18-inch type A (601.0405)LF195$24.80$25.00$42.65$42.65$44.36$44.78
43Concrete curb & gutter 30-inch type D (601.0411)LF3,654$21.00$21.00$35.83$35.83$37.26$37.62
44Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF636$28.00$28.00$25.25$25.25$26.26$26.51
45Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF1,543$27.20$27.50$25.25$25.25$26.26$26.51
46Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF368$28.00$28.00$39.78$39.78$41.37$41.77
47Concrete curb pedestrian (601.0600)LF326$39.00$39.00$34.87$34.87$36.26$36.61
48Concrete sidewalk 4-inch (602.0405)SF8,171$6.40$7.00$5.92$5.92$6.16$6.22
49Concrete sidewalk 5-inch (602.0410)SF14,577$7.80$8.00$9.32$9.32$10.20$9.79
50Concrete sidewalk 6-inch (602.0415)SF76$9.90$10.00$9.94$9.94$10.34$10.44
51Curb ramp detectable warning field yellow (602.0505)SF618$61.00$61.00$59.37$59.37$61.74$62.34
52Curb ramp detectable warning field radial yellow (602.0605)SF143$65.00$65.00$66.89$66.89$69.57$70.23
53Concrete driveway 6-inch (602.0810)SY86$85.00$85.00$68.62$68.62$84.15$72.05
54Riprap light (606.0100)CY31$64.49$100.00$95.00$130.00$110.00$82.97
55Riprap medium (606.0200)CY22$110.82$110.00$100.00$193.00$110.00$79.00
56Riprap heavy (606.0300)CY12$145.30$120.00$110.00$141.00$110.00$111.89
57Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF124$84.99$70.00$106.50$127.30$85.00$96.95
58Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF352$85.35$72.00$105.75$119.77$86.00$68.88
59Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF76$111.01$98.00$138.25$140.11$120.00$93.02
60Inlet covers type HM-GJ-S (611.0633)EACH1$1,262.38$1,350.00$1,240.00$1,816.17$1,085.00$1,132.68
61Inlet covers type HM-S (611.0636)EACH6$1,045.55$1,250.00$955.00$1,695.77$990.00$1,031.21
62Inlet covers type H-S (611.0639)EACH4$1,045.55$1,200.00$955.00$1,655.17$960.00$997.92
63Inlet covers type MS (611.0642)EACH1$862.57$1,100.00$620.00$974.20$600.00$760.77
64Inlet covers type T (611.0652)EACH2$5,232.18$1,750.00$1,230.00$2,016.37$1,245.00$1,296.56
65Manholes 5-FT diameter (611.2005)EACH1$4,800.72$6,600.00$6,016.00$5,816.30$5,260.00$5,397.02
66Inlets 4-FT diameter (611.3004)EACH1$2,904.17$3,600.00$3,210.00$3,059.33$2,765.00$3,206.28
67Inlets 2X2.5-FT (611.3225)EACH1$2,661.59$2,400.00$3,096.00$2,438.30$2,000.00$2,683.06
68Inlets 2X3-FT (611.3230)EACH10$2,355.59$2,500.00$3,193.00$2,517.94$2,150.00$2,909.70
69Inlets median 1 grate (611.3901)EACH1$3,804.83$4,000.00$4,413.00$3,949.92$3,380.00$3,997.16
70Adjusting manhole covers (611.8110)EACH10$542.03$1,000.00$900.00$652.64$525.00$751.22
71Adjusting inlet covers (611.8115)EACH23$433.62$750.00$1,100.00$766.17$420.00$796.16
72Pipe underdrain 6-inch (612.0106)LF2,568$8.79$12.00$12.55$10.57$12.00$17.33
73Fence safety (616.0700.S)LF456$2.65$3.00$2.65$2.65$2.76$2.78
74Maintenance and repair of haul roads (project) 01. 1520-00-74 (618.0100)EACH1$100.00$1,000.00$1.00$550.00$1.00$0.01
75Maintenance and repair of haul roads (project) 02. 1620-02-77 (618.0100)EACH1$100.00$1,000.00$1.00$550.00$1.00$0.01
76Mobilization (619.1000)EACH1$259,927$238,450$218,822$304,045$170,000$263,440
77Concrete median sloped nose (620.0300)SF386$15.00$18.00$11.01$11.01$11.45$11.56
78Water (624.0100)MGAL191.80$47.34$35.00$35.00$50.00$42.00$29.15
79Topsoil (625.0100)SY17,781$5.67$2.00$2.50$3.50$5.50$5.45
80Silt fence (628.1504)LF4,311$1.94$2.10$1.94$1.94$2.02$2.04
81Silt fence maintenance (628.1520)LF4,311$0.01$0.01$0.01$0.01$0.01$0.01
82Mobilizations erosion control (628.1905)EACH10$50.00$50.00$50.00$50.00$52.01$52.50
83Mobilizations emergency erosion control (628.1910)EACH10$50.00$50.00$50.00$50.00$52.01$52.50
84Erosion mat class I type A (628.2002)SY352$1.06$2.00$1.06$1.06$1.10$1.11
85Erosion mat class I type B (628.2004)SY13,840$1.06$2.10$1.06$1.06$1.10$1.11
86Erosion mat urban class I type A (628.2006)SY991$1.77$1.77$1.77$1.77$1.84$1.86
87Erosion mat urban class I type B (628.2008)SY2,586$1.85$1.85$1.85$1.85$1.92$1.94
88Inlet protection type A (628.7005)EACH14$100.00$100.00$100.00$100.00$104.01$105.00
89Inlet protection type B (628.7010)EACH1$62.00$65.00$62.00$62.00$64.49$65.10
90Inlet protection type C (628.7015)EACH68$65.00$65.00$65.00$65.00$67.61$68.25
91Inlet protection type D (628.7020)EACH13$142.75$143.00$142.75$142.75$148.48$149.89
92Temporary ditch checks (628.7504)LF88$7.50$7.50$7.50$7.50$7.80$7.88
93Culvert pipe checks (628.7555)EACH62$16.55$17.00$16.55$16.55$17.21$17.38
94Rock bags (628.7570)EACH50$15.80$16.00$15.80$15.80$16.43$16.59
95Fertilizer type B (629.0210)CWT13$103.00$105.00$103.00$103.00$107.13$108.15
96Seeding mixture no. 20 (630.0120)LB683$7.55$7.75$7.55$7.55$7.85$7.93
97Seeding mixture no. 40 (630.0140)LB107$18.00$18.00$18.00$18.00$18.72$18.90
98Seed water (630.0500)MGAL404.90$0.01$0.01$0.01$0.01$0.01$0.01
99Markers culvert end (633.5200)EACH10$62.00$65.00$62.00$62.00$64.49$65.10
100Posts wood 4X6-inch X 14-FT (634.0614)EACH7$88.25$90.00$88.25$88.25$91.79$92.66
101Posts wood 4X6-inch X 16-FT (634.0616)EACH31$94.25$95.00$94.25$94.25$98.03$98.96
102Posts wood 4X6-inch X 18-FT (634.0618)EACH11$108.25$110.00$108.25$108.25$112.59$113.66
103Posts wood 4X6-inch X 20-FT (634.0620)EACH6$120.75$121.00$120.75$120.75$125.59$126.79
104Posts wood 4X6-inch X 22-FT (634.0622)EACH6$128.75$129.00$128.75$128.75$133.92$135.19
105Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH19$253.00$255.00$253.00$253.00$263.15$265.65
106Signs type II reflective H (637.2210)SF734.54$18.65$19.00$18.65$18.65$19.40$19.58
107Signs type II reflective F (637.2230)SF56$22.25$22.50$22.25$22.25$23.14$23.36
108Removing signs type II (638.2602)EACH68$18.00$18.00$18.00$18.00$18.72$18.90
109Removing small sign supports (638.3000)EACH74$18.00$18.00$18.00$18.00$18.72$18.90
110Field office type C (642.5201)EACH1$15,500$12,500$8,000.00$13,125$8,000.00$13,164
111Traffic control drums (643.0300)DAY12,047$0.50$1.00$0.15$0.15$0.16$0.53
112Traffic control barricades type III (643.0420)DAY5,422$1.00$1.50$0.45$0.45$0.47$1.05
113Traffic control warning lights type A (643.0705)DAY1,438$1.00$0.10$0.10$0.10$0.10$1.05
114Traffic control signs (643.0900)DAY45,330$0.35$1.10$0.17$0.17$0.18$0.37
115Traffic control covering signs type II (643.0920)EACH41$25.00$35.00$110.00$110.00$114.41$26.25
116Traffic control signs fixed message (643.1000)SF90$25.00$11.30$14.50$14.50$15.08$26.25
117Temporary marking crosswalk removable tape 6-inch (643.3350)LF2,673$1.50$2.50$2.25$2.25$2.34$1.58
118Traffic control (643.5000)EACH1$25,000$20,000$54,500$54,500$56,687$26,250
119Temporary pedestrian surface plate (644.1430)SF148$10.00$15.00$12.10$12.10$12.59$10.50
120Temporary pedestrian surface matting (644.1440)SF2,351$5.00$15.00$2.75$2.75$2.86$5.25
121Temporary pedestrian curb ramp (644.1601)DAY1,997$7.00$10.00$7.00$7.00$7.28$7.35
122Temporary pedestrian detectable warning field (644.1605)SF830$9.00$8.00$6.00$6.00$6.24$9.45
123Temporary pedestrian barricade (644.1810)LF3,880$4.00$14.00$5.00$5.00$5.20$4.20
124Geotextile type DF schedule A (645.0111)SY1,588$0.81$2.00$2.75$0.86$1.50$1.74
125Geotextile type HR (645.0120)SY115$7.00$4.00$11.00$7.45$6.50$5.84
126Geotextile type R (645.0130)SY122$3.89$5.00$6.75$4.13$5.80$5.58
127Geotextile type sas (645.0140)SY18,315$1.27$2.10$1.15$1.95$1.52$1.34
128Marking line grooved wet ref epoxy 6-inch (646.2040)LF40,526$1.40$1.40$1.30$1.30$1.35$1.47
129Marking line grooved wet ref epoxy 10-inch (646.4040)LF260$3.00$3.00$2.76$2.76$2.87$3.15
130Marking stop line epoxy 18-inch (646.6120)LF359$20.00$20.00$15.49$15.49$16.11$21.00
131Marking dotted extension epoxy 18-inch (646.6320)LF72$20.00$20.00$15.49$15.49$16.11$21.00
132Marking diagonal epoxy 12-inch (646.7120)LF261$16.00$16.00$15.07$15.07$15.67$16.80
133Marking crosswalk epoxy transverse line 6-inch (646.7420)LF2,438$13.00$13.00$14.66$14.66$15.25$13.65
134Marking curb epoxy (646.8120)LF40$25.00$25.00$7.40$7.40$7.70$26.25
135Marking island nose epoxy (646.8220)EACH4$330.00$330.00$279.18$279.18$290.38$346.50
136Construction staking storm sewer (650.4000)EACH18$100.00$150.00$150.00$150.00$156.02$157.50
137Construction staking subgrade (650.4500)LF3,692$0.01$1.00$0.01$0.01$0.01$0.01
138Construction staking base (650.5000)LF3,692$0.75$0.66$0.66$0.66$0.69$0.69
139Construction staking curb gutter and curb & gutter (650.5500)LF6,335$0.80$0.62$0.62$0.62$0.64$0.65
140Construction staking pipe culverts (650.6000)EACH3$125.00$150.00$150.00$150.00$156.02$157.50
141Construction staking resurfacing reference (650.8000)LF7,873$0.10$0.13$0.13$0.13$0.14$0.14
142Construction staking electrical installations (project) 01. 1520-00- 74 (650.8501)EACH1$3,000.00$1,200.00$1,200.00$1,200.00$1,248.14$1,260.00
143Construction staking curb ramps (650.9000)EACH63$190.00$135.00$135.00$135.00$140.42$141.75
144Construction staking sidewalk (project) 01. 1520-00-74 (650.9500)EACH1$3,000.00$800.00$800.00$800.00$832.10$840.00
145Construction staking sidewalk (project) 02. 1620-02-77 (650.9500)EACH1$3,000.00$800.00$800.00$800.00$832.10$840.00
146Construction staking supplemental control (project) 01. 1520-00-74 (650.9911)EACH1$2,000.00$900.00$900.00$900.00$936.11$945.00
147Construction staking supplemental control (project) 02. 1620-02-77 (650.9911)EACH1$2,500.00$900.00$900.00$900.00$936.11$945.00
148Construction staking slope stakes (650.9920)LF6,210$0.80$0.77$0.77$0.77$0.80$0.81
149Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF75$7.50$8.00$7.50$7.50$7.80$7.88
150Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF969$12.00$12.00$12.00$12.00$12.48$12.60
151Pull boxes non-conductive 24X42- inch (653.0164)EACH9$1,960.00$1,960.00$1,960.00$1,960.00$2,038.64$2,058.00
152Concrete bases type 5 (654.0105)EACH15$1,000.00$1,000.00$1,000.00$1,000.00$1,040.12$1,050.00
153Concrete control cabinet bases type L24 (654.0224)EACH1$2,500.00$2,500.00$2,500.00$2,500.00$2,600.30$2,625.00
154Electrical wire lighting 12 AWG (655.0610)LF2,430$0.90$1.00$0.90$0.90$0.94$0.95
155Electrical wire lighting 10 AWG (655.0615)LF10,316$1.20$1.25$1.20$1.20$1.25$1.26
156Electrical service meter breaker pedestal (location) 01. LCC B (656.0201)EACH1$2,500.00$2,500.00$2,500.00$2,500.00$2,600.30$2,625.00
157Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH15$650.00$650.00$650.00$650.00$676.08$682.50
158Poles type 5-aluminum (657.0322)EACH15$2,800.00$2,800.00$2,800.00$2,800.00$2,912.34$2,940.00
159Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH15$650.00$650.00$650.00$650.00$676.08$682.50
160Luminaires utility LED A (659.1115)EACH15$300.00$300.00$300.00$300.00$312.04$315.00
161Lighting control cabinets 120/240 24-inch (659.2124)EACH1$10,000$10,000$10,000$10,000$10,401$10,500
162Public land reference monument verify and reset (680.0100)EACH1$2,000.00$1,000.00$950.00$950.00$988.11$997.50
163Sawing asphalt (690.0150)LF2,593$1.65$3.50$1.65$1.65$1.72$1.58
164Sawing concrete (690.0250)LF253$4.60$6.00$2.30$2.30$2.39$2.63
165Incentive iri ride (740.0440)DOL4,221$1.00$1.00$1.00$1.00$1.00$1.00
166Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF6,437$2.32$2.75$2.32$2.32$2.41$2.44
167On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00$5.00$5.00$5.00
168On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,260$5.00$5.00$5.00$5.00$5.00$5.00
169Special 01. temporary water diversion - sta 636+37 (SPV.0060)EACH1$2,250.00$5,000.00$1.00$2,500.00$1,750.00$6,527.67
170Special 02. temporary water diversion - sta 1555+67 (SPV.0060)EACH1$2,750.00$25,000$75,000$6,500.00$17,000$18,265
171Special 03. cored holes 6-inch (SPV.0060)EACH11$240.86$1,500.00$400.00$375.00$165.00$346.99
172Special 04. adjusting water valve boxes (SPV.0060)EACH1$433.62$500.00$500.00$375.00$400.00$973.45
173Special 05. apron endwalls for culvert pipe reinforced concrete 96-inch (SPV.0060)EACH2$9,665.34$12,500$9,543.00$11,879$9,000.00$10,435
174Special 06. temporary lighting system, STH 73/STH 80 roundabout (SPV.0060)EACH1$10,000$10,000$10,000$10,000$10,400$10,500
175Special 01. seeding no mow fescue (SPV.0085)LB17$53.00$55.00$53.00$53.00$55.13$55.65
176Special 01. removing distressed pavement milling (SPV.0180)SY734$3.79$10.00$11.30$11.30$11.75$2.65
WisDOT contract 20260310025: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy