WisDOT contract 20260310031 bid tabulation
9260-00-71. Let by Wisconsin DOT on March 10, 2026, Forest. 5 bids received; low bid $2,490,132 by S & N Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 143
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S & N Incorporated | $2,490,132 | Low |
| 2 | Relyco Plus, LLC | $2,553,996 | +3.0% |
| 3 | Musson Bros., Inc. | $2,772,535 | +11% |
| 4 | Integrity Grading and Excavating, Inc. | $2,980,971 | +20% |
| 5 | James Peterson Sons, Inc. | $3,121,484 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S & N Incorporated | 2. Relyco Plus, LLC | 3. Musson Bros., Inc. | 4. Integrity Grading and Excavating, Inc. | 5. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 15 | $310.00 | $385.00 | $520.45 | $385.00 | $302.80 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 7 | $1,500.00 | $557.00 | $848.66 | $1,211.00 | $350.00 |
| 3 | Removing curb & gutter (204.0150) | LF | 1,829 | $5.00 | $5.30 | $4.19 | $8.00 | $3.20 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 782 | $6.25 | $6.57 | $1.90 | $12.25 | $8.49 |
| 5 | Removing guardrail (204.0165) | LF | 1,120 | $3.50 | $3.50 | $2.50 | $2.50 | $2.50 |
| 6 | Removing catch basins (204.0215) | EACH | 1 | $500.00 | $462.00 | $567.22 | $694.00 | $400.00 |
| 7 | Removing inlets (204.0220) | EACH | 2 | $500.00 | $384.00 | $567.22 | $450.00 | $400.00 |
| 8 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 76 | $13.00 | $12.00 | $19.02 | $26.55 | $18.65 |
| 9 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 128 | $15.00 | $18.00 | $20.38 | $25.60 | $31.94 |
| 10 | Excavation common (205.0100) | CY | 14,227 | $9.80 | $12.76 | $12.07 | $17.00 | $15.32 |
| 11 | Finishing roadway (project) 01. 9260-00-71 (213.0100) | EACH | 1 | $500.00 | $2,000.00 | $100.00 | $500.00 | $5,000.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 543 | $21.16 | $29.55 | $18.62 | $30.00 | $26.33 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 12,836 | $13.25 | $12.30 | $14.64 | $19.00 | $17.76 |
| 14 | HMA cold weather paving (450.4000) | TON | 500 | $3.70 | $3.70 | $3.70 | $3.70 | $3.70 |
| 15 | Tack coat (455.0605) | GAL | 1,475 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 16 | Incentive density HMA pavement (460.2000) | DOL | 2,650 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 2,999 | $83.10 | $83.10 | $83.10 | $83.10 | $83.10 |
| 18 | HMA pavement 4 MT 58-34 H (460.6444) | TON | 1,243 | $99.30 | $99.30 | $99.30 | $99.30 | $99.30 |
| 19 | Asphaltic surface driveways and field entrances (465.0120) | TON | 75 | $220.00 | $220.00 | $220.00 | $220.00 | $220.00 |
| 20 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $363.42 | $343.00 | $251.18 | $720.00 | $218.73 |
| 21 | Culvert pipe class III-A non-metal 12-inch (520.3412) | LF | 26 | $33.43 | $49.70 | $36.06 | $59.00 | $52.81 |
| 22 | Concrete collars for pipe (520.8000) | EACH | 4 | $800.00 | $990.00 | $934.75 | $1,211.00 | $276.26 |
| 23 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,196.92 | $2,705.00 | $1,337.67 | $1,750.00 | $1,525.57 |
| 24 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,363.87 | $1,746.00 | $1,531.22 | $1,920.00 | $1,502.61 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $5,748.38 | $4,290.00 | $2,589.09 | $3,430.00 | $2,508.85 |
| 26 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 166 | $216.84 | $262.20 | $298.94 | $152.00 | $225.88 |
| 27 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $1,453.55 | $3,491.00 | $1,635.18 | $2,615.00 | $1,344.09 |
| 28 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 3,058 | $23.74 | $20.33 | $20.33 | $20.33 | $20.33 |
| 29 | Concrete curb pedestrian (601.0600) | LF | 79 | $56.04 | $77.00 | $77.00 | $77.00 | $77.00 |
| 30 | Concrete sidewalk 4-inch (602.0405) | SF | 6,688 | $7.57 | $7.25 | $7.25 | $7.25 | $7.25 |
| 31 | Curb ramp detectable warning field yellow (602.0505) | SF | 70 | $60.32 | $40.00 | $40.00 | $40.00 | $40.00 |
| 32 | Concrete driveway 6-inch (602.0810) | SY | 341 | $77.89 | $69.93 | $69.93 | $69.93 | $69.93 |
| 33 | Concrete surface drains (602.3010) | CY | 1.80 | $967.87 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 34 | Riprap heavy (606.0300) | CY | 67 | $115.00 | $128.64 | $318.22 | $150.00 | $150.00 |
| 35 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 505 | $58.89 | $73.90 | $91.14 | $77.00 | $105.35 |
| 36 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 10 | $158.46 | $146.80 | $282.84 | $127.00 | $149.73 |
| 37 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 74 | $152.99 | $165.80 | $165.76 | $135.00 | $156.85 |
| 38 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 649 | $168.15 | $172.70 | $202.68 | $193.00 | $208.57 |
| 39 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 82 | $60.19 | $74.55 | $85.24 | $77.00 | $98.54 |
| 40 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 111 | $77.65 | $76.30 | $129.27 | $83.00 | $95.37 |
| 41 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 467 | $113.42 | $103.80 | $110.87 | $127.00 | $98.72 |
| 42 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 227 | $136.87 | $142.40 | $159.36 | $150.00 | $142.85 |
| 43 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 1,014 | $208.93 | $219.80 | $255.12 | $290.00 | $244.61 |
| 44 | Storm sewer pipe reinforced concrete class V 24-inch (608.0524) | LF | 140 | $124.48 | $124.30 | $142.11 | $127.00 | $111.82 |
| 45 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (608.2329) | LF | 177 | $215.87 | $269.60 | $298.62 | $230.00 | $247.12 |
| 46 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 88 | $204.64 | $199.60 | $228.73 | $205.00 | $206.17 |
| 47 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 13 | $70.00 | $68.30 | $0.01 | $73.00 | $95.78 |
| 48 | Manhole covers type J (611.0530) | EACH | 16 | $1,242.02 | $490.00 | $1,319.62 | $1,650.00 | $1,078.97 |
| 49 | Inlet covers type C (611.0612) | EACH | 3 | $1,264.28 | $512.00 | $1,394.60 | $750.00 | $1,110.72 |
| 50 | Inlet covers type H (611.0624) | EACH | 8 | $1,478.40 | $725.00 | $1,562.03 | $970.00 | $1,442.72 |
| 51 | Inlet covers type H-S (611.0639) | EACH | 7 | $1,478.40 | $725.00 | $1,719.15 | $970.00 | $1,442.72 |
| 52 | Inlet covers type MS-A (611.0645) | EACH | 3 | $1,273.82 | $522.00 | $803.41 | $860.00 | $758.67 |
| 53 | Catch basins 5-FT diameter (611.1005) | EACH | 3 | $3,991.32 | $6,098.00 | $4,360.37 | $5,600.00 | $5,013.23 |
| 54 | Manholes 4-FT diameter (611.2004) | EACH | 4 | $2,971.39 | $4,886.00 | $2,966.31 | $4,650.00 | $3,926.58 |
| 55 | Manholes 5-FT diameter (611.2005) | EACH | 11 | $6,793.69 | $10,974 | $7,856.00 | $10,000 | $9,240.95 |
| 56 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $5,656.26 | $6,794.00 | $4,908.12 | $8,800.00 | $5,608.98 |
| 57 | Inlets 3-FT diameter (611.3003) | EACH | 3 | $1,598.26 | $3,058.00 | $1,452.63 | $3,200.00 | $2,206.44 |
| 58 | Inlets 4-FT diameter (611.3004) | EACH | 12 | $2,163.37 | $2,563.00 | $1,672.97 | $3,800.00 | $2,572.86 |
| 59 | Inlets 2X3-FT (611.3230) | EACH | 5 | $2,008.98 | $3,063.00 | $1,615.97 | $3,800.00 | $2,041.01 |
| 60 | Inlets median 3 grate (611.3903) | EACH | 1 | $3,157.84 | $3,926.00 | $2,418.54 | $3,100.00 | $3,478.22 |
| 61 | Pipe grates (size) 01. 18-inch (611.9850.S) | EACH | 1 | $1,001.00 | $415.00 | $1,053.46 | $1,180.00 | $1,189.25 |
| 62 | Pipe grates (size) 02. 24-inch (611.9850.S) | EACH | 1 | $1,921.08 | $597.00 | $2,047.99 | $2,100.00 | $2,198.39 |
| 63 | Pipe grates (size) 03. 36-inch (611.9850.S) | EACH | 1 | $3,233.36 | $1,260.00 | $3,433.25 | $3,400.00 | $3,616.38 |
| 64 | Guardrail mow strip asphalt (614.0396) | SY | 45 | $70.00 | $58.60 | $58.60 | $58.60 | $68.60 |
| 65 | MGS guardrail 3 (614.2300) | LF | 950 | $28.60 | $28.60 | $28.00 | $28.00 | $28.00 |
| 66 | MGS thrie beam transition (614.2500) | LF | 78.80 | $99.00 | $99.00 | $101.00 | $101.00 | $101.00 |
| 67 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $4,100.00 | $4,100.00 | $3,513.00 | $3,513.00 | $3,513.00 |
| 68 | Fence chain link 6-FT (616.0206) | LF | 826 | $30.00 | $30.00 | $29.90 | $29.90 | $29.90 |
| 69 | Gates chain link (width) 01. 12-FT (616.0329) | EACH | 1 | $2,090.00 | $2,090.00 | $2,320.00 | $2,320.00 | $2,320.00 |
| 70 | Maintenance and repair of haul roads (project) 01. 9260-00-71 (618.0100) | EACH | 1 | $500.00 | $0.01 | $1.00 | $500.00 | $1.00 |
| 71 | Mobilization (619.1000) | EACH | 1 | $237,629 | $295,000 | $325,000 | $182,350 | $209,086 |
| 72 | Water (624.0100) | MGAL | 227 | $15.00 | $0.01 | $0.01 | $30.00 | $40.00 |
| 73 | Topsoil (625.0100) | SY | 24,132 | $3.85 | $0.01 | $1.00 | $4.25 | $4.64 |
| 74 | Silt fence (628.1504) | LF | 4,739 | $2.20 | $2.20 | $1.75 | $1.75 | $1.75 |
| 75 | Silt fence maintenance (628.1520) | LF | 4,739 | $0.01 | $0.01 | $0.03 | $0.03 | $0.03 |
| 76 | Mobilizations erosion control (628.1905) | EACH | 5 | $500.00 | $500.00 | $323.00 | $323.00 | $323.00 |
| 77 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $300.00 | $300.00 | $213.00 | $213.00 | $213.00 |
| 78 | Erosion mat urban class I type A (628.2006) | SY | 3,879 | $2.19 | $2.19 | $1.85 | $1.85 | $1.85 |
| 79 | Erosion mat urban class I type B (628.2008) | SY | 6,893 | $2.05 | $2.05 | $1.85 | $1.85 | $1.85 |
| 80 | Erosion mat class II type B (628.2023) | SY | 13,360 | $2.10 | $2.10 | $1.95 | $1.95 | $1.95 |
| 81 | Inlet protection type A (628.7005) | EACH | 29 | $106.00 | $106.00 | $100.00 | $100.00 | $100.00 |
| 82 | Inlet protection type C (628.7015) | EACH | 24 | $72.00 | $72.00 | $55.00 | $55.00 | $55.00 |
| 83 | Culvert pipe checks (628.7555) | EACH | 12 | $16.00 | $16.00 | $25.00 | $25.00 | $25.00 |
| 84 | Fertilizer type B (629.0210) | CWT | 16.30 | $97.00 | $97.00 | $125.00 | $125.00 | $125.00 |
| 85 | Seeding mixture no. 20 (630.0120) | LB | 905 | $6.00 | $6.00 | $8.85 | $8.85 | $8.85 |
| 86 | Seeding mixture no. 40 (630.0140) | LB | 189 | $11.00 | $11.00 | $9.95 | $9.95 | $9.95 |
| 87 | Seeding temporary (630.0200) | LB | 38 | $3.55 | $3.55 | $15.00 | $15.00 | $15.00 |
| 88 | Seed water (630.0500) | MGAL | 415 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 89 | Markers culvert end (633.5200) | EACH | 2 | $71.00 | $71.00 | $75.00 | $75.00 | $75.00 |
| 90 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 25 | $89.00 | $89.00 | $100.00 | $100.00 | $100.00 |
| 91 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 3 | $100.00 | $100.00 | $120.00 | $120.00 | $120.00 |
| 92 | Signs type II reflective F (637.2230) | SF | 16.50 | $22.00 | $22.00 | $50.00 | $50.00 | $50.00 |
| 93 | Moving signs type II (638.2102) | EACH | 30 | $120.00 | $120.00 | $150.00 | $150.00 | $150.00 |
| 94 | Removing small sign supports (638.3000) | EACH | 26 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 95 | Field office type C (642.5201) | EACH | 1 | $10,000 | $10,000 | $15,000 | $12,500 | $12,000 |
| 96 | Traffic control drums (643.0300) | DAY | 8,025 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 97 | Traffic control barricades type III (643.0420) | DAY | 4,694 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 98 | Traffic control warning lights type A (643.0705) | DAY | 5,908 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 99 | Traffic control warning lights type C (643.0715) | DAY | 1,065 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 100 | Traffic control signs (643.0900) | DAY | 44,032 | $0.35 | $0.35 | $0.35 | $0.35 | $0.35 |
| 101 | Traffic control covering signs type II (643.0920) | EACH | 8 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 102 | Traffic control signs fixed message (643.1000) | SF | 36 | $10.10 | $10.10 | $10.10 | $10.10 | $10.10 |
| 103 | Temporary marking line removable tape 6-inch (643.3180) | LF | 241 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 104 | Traffic control (643.5000) | EACH | 1 | $3,450.00 | $3,450.00 | $3,450.00 | $3,450.00 | $3,450.00 |
| 105 | Temporary pedestrian surface matting (644.1440) | SF | 59 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 106 | Temporary pedestrian curb ramp (644.1601) | DAY | 20 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 107 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 108 | Temporary pedestrian barricade (644.1810) | LF | 184 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 109 | Temporary audible message devices (644.1900.S) | DAY | 130 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 110 | Geotextile type HR (645.0120) | SY | 166 | $3.75 | $4.00 | $7.06 | $1.99 | $5.32 |
| 111 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 7,302 | $1.69 | $2.60 | $2.60 | $1.69 | $2.60 |
| 112 | Marking stop line epoxy 18-inch (646.6120) | LF | 57 | $18.85 | $19.00 | $19.00 | $18.85 | $19.00 |
| 113 | Cold weather marking epoxy 6-inch (646.6466) | LF | 7,302 | $0.58 | $0.30 | $0.30 | $0.58 | $0.30 |
| 114 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 148 | $17.84 | $21.00 | $21.00 | $17.84 | $21.00 |
| 115 | Construction staking storm sewer (650.4000) | EACH | 43 | $200.00 | $200.00 | $200.00 | $200.00 | $8,600.00 |
| 116 | Construction staking subgrade (650.4500) | LF | 2,891 | $2.00 | $0.01 | $0.01 | $0.01 | $0.01 |
| 117 | Construction staking base (650.5000) | LF | 2,891 | $0.90 | $0.90 | $0.90 | $0.90 | $0.90 |
| 118 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,058 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 119 | Construction staking pipe culverts (650.6000) | EACH | 1 | $130.00 | $130.00 | $130.00 | $130.00 | $130.00 |
| 120 | Construction staking curb ramps (650.9000) | EACH | 6 | $190.00 | $190.00 | $190.00 | $190.00 | $190.00 |
| 121 | Construction staking sidewalk (project) 01. 9260-00-71 (650.9500) | EACH | 1 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 122 | Construction staking supplemental control (project) 01. 9260-00-71 (650.9911) | EACH | 1 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 123 | Construction staking slope stakes (650.9920) | LF | 3,331 | $1.10 | $1.10 | $1.10 | $1.10 | $1.10 |
| 124 | Sawing asphalt (690.0150) | LF | 1,039 | $2.70 | $1.89 | $1.89 | $1.89 | $1.70 |
| 125 | Incentive iri ride (740.0440) | DOL | 2,190 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 126 | Special 01. engineered soil (SPV.0035) | CY | 662 | $98.00 | $75.00 | $80.54 | $109.00 | $40.00 |
| 127 | Special 01. sanitary sewer connection to existing sanitary sewer pipe (SPV.0060) | EACH | 3 | $392.22 | $475.00 | $1,320.06 | $7,350.00 | $1,893.77 |
| 128 | Special 02. sanitary sewer connection to existing sanitary sewer manhole (SPV.0060) | EACH | 1 | $1,775.60 | $880.00 | $2,635.80 | $7,500.00 | $2,275.00 |
| 129 | Special 03. utility line opening (ulo) (SPV.0060) | EACH | 1 | $1,000.00 | $920.00 | $2,057.71 | $4,500.00 | $1,200.00 |
| 130 | Special 04. sanitary sewer manhole casting elevation adjustment (SPV.0060) | EACH | 7 | $1,487.00 | $525.00 | $981.54 | $2,800.00 | $672.86 |
| 131 | Special 05. water main connection to existing water main 8-inch (SPV.0060) | EACH | 4 | $961.44 | $4,287.00 | $2,441.57 | $5,150.00 | $2,293.44 |
| 132 | Special 06. water service connection to existing water main 1-inch (SPV.0060) | EACH | 6 | $769.32 | $1,467.00 | $2,503.76 | $103.00 | $1,000.00 |
| 133 | Special 07. water valve box adjustment (SPV.0060) | EACH | 12 | $208.00 | $277.00 | $1,000.29 | $753.00 | $398.21 |
| 134 | Special 08. temporary water service (SPV.0060) | EACH | 10 | $50.00 | $100.00 | $2,988.41 | $2,424.00 | $250.00 |
| 135 | Special 09. inlet covers type H-D (SPV.0060) | EACH | 5 | $1,404.90 | $752.00 | $1,752.44 | $990.00 | $1,612.77 |
| 136 | Special 10. concrete collars for manholes (SPV.0060) | EACH | 2 | $2,502.65 | $650.00 | $1,233.27 | $1,640.00 | $450.00 |
| 137 | Special 11. observation well (SPV.0060) | EACH | 1 | $1,500.00 | $3,355.00 | $1,041.33 | $1,893.00 | $2,070.74 |
| 138 | Special 12. temporary trail shift for storm sewer work (SPV.0060) | EACH | 1 | $3,250.00 | $1,500.00 | $2,089.86 | $17,455 | $3,000.00 |
| 139 | Special 01. sanitary sewer 8-inch PVC (SPV.0090) | LF | 80 | $63.84 | $76.70 | $59.50 | $110.15 | $98.92 |
| 140 | Special 02. water main 8-inch ductile iron (SPV.0090) | LF | 80 | $62.81 | $93.40 | $120.98 | $192.00 | $155.63 |
| 141 | Special 03. water service 1-inch copper (SPV.0090) | LF | 228 | $65.39 | $79.70 | $98.96 | $182.00 | $106.13 |
| 142 | Special 04. sanitary sewer lateral 6-inch PVC (SPV.0090) | LF | 168 | $66.96 | $124.00 | $113.40 | $173.00 | $68.14 |
| 143 | Special 01. rigid insulation board 4- inch thick (SPV.0165) | SF | 7,315 | $5.71 | $4.95 | $9.82 | $7.20 | $11.63 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.