WisDOT contract 20260310045 bid tabulation
T Buchanan, CTH N; CTH Kk to CTH Ce (CTH N, Outagamie County T. Buchanan, CTH N). Let by Wisconsin DOT on March 10, 2026, Outagamie. 4 bids received; low bid $4,804,549 by MCC, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 208
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | MCC, Inc. | $4,804,549 | Low |
| 2 | Musson Bros., Inc. | $4,991,075 | +4.0% |
| 3 | Vinton Construction Company | $5,134,171 | +7.0% |
| 4 | James Peterson Sons, Inc. | $5,711,147 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. MCC, Inc. | 2. Musson Bros., Inc. | 3. Vinton Construction Company | 4. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 16 | $495.00 | $1.00 | $1.00 | $1,000.00 |
| 2 | Grubbing (201.0205) | STA | 27 | $390.00 | $1,000.00 | $1,000.00 | $500.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 20 | $270.00 | $209.42 | $650.00 | $350.00 |
| 4 | Removing structure (structure) 01. V-44-0144 (203.0220) | EACH | 1 | $8,600.00 | $4,649.36 | $3,000.00 | $3,252.00 |
| 5 | Removing concrete pavement (204.0100) | SY | 1,960 | $3.30 | $8.34 | $6.45 | $5.25 |
| 6 | Removing asphaltic surface (204.0110) | SY | 1,110 | $2.50 | $5.13 | $7.00 | $6.50 |
| 7 | Removing curb & gutter (204.0150) | LF | 3,390 | $3.00 | $4.97 | $3.85 | $2.90 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 695 | $2.75 | $4.17 | $6.30 | $4.00 |
| 9 | Removing guardrail (204.0165) | LF | 1,235 | $4.00 | $2.60 | $3.00 | $4.00 |
| 10 | Removing fence (204.0170) | LF | 128 | $5.00 | $5.00 | $0.01 | $5.00 |
| 11 | Removing manholes (204.0210) | EACH | 1 | $655.00 | $669.22 | $523.00 | $750.00 |
| 12 | Removing inlets (204.0220) | EACH | 4 | $510.00 | $449.69 | $348.00 | $500.00 |
| 13 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 417 | $26.00 | $12.65 | $21.00 | $12.00 |
| 14 | Excavation common (205.0100) | CY | 33,747 | $12.00 | $15.30 | $19.66 | $12.90 |
| 15 | Excavation for structures culverts (structure) 01. V-44-0144 (206.2001) | EACH | 1 | $11,845 | $17,719 | $3,750.00 | $18,504 |
| 16 | Backfill structure type B (210.2500) | TON | 1,499 | $17.00 | $27.76 | $24.50 | $26.46 |
| 17 | Finishing roadway (project) 01. 4676-04-71 (213.0100) | EACH | 1 | $7,730.00 | $500.00 | $5,000.00 | $3,500.00 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,810 | $20.05 | $16.56 | $18.10 | $30.10 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 21,919 | $17.30 | $15.22 | $12.85 | $22.57 |
| 20 | Base aggregate dense 3-inch (305.0130) | TON | 1,140 | $15.65 | $20.12 | $18.10 | $23.20 |
| 21 | Base aggregate open-graded (310.0110) | TON | 11 | $25.00 | $18.03 | $34.00 | $36.30 |
| 22 | Breaker run (311.0110) | TON | 19,751 | $14.65 | $15.63 | $12.70 | $19.52 |
| 23 | Coloring concrete wisdot red (405.0100) | CY | 190 | $73.33 | $73.33 | $100.00 | $73.33 |
| 24 | Concrete pavement 8-inch (415.0080) | SY | 450 | $72.90 | $72.90 | $80.00 | $72.90 |
| 25 | Concrete truck apron 12-inch (415.2010) | SY | 350 | $79.70 | $79.70 | $91.25 | $79.70 |
| 26 | Tack coat (455.0605) | GAL | 2,049 | $3.72 | $4.25 | $4.25 | $4.25 |
| 27 | Incentive density HMA pavement (460.2000) | DOL | 4,970 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 5,567 | $81.04 | $78.20 | $78.20 | $78.20 |
| 29 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,770 | $80.95 | $79.90 | $79.90 | $79.90 |
| 30 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 433 | $107.25 | $117.25 | $117.25 | $117.25 |
| 31 | Asphaltic surface (465.0105) | TON | 520 | $137.00 | $112.50 | $112.50 | $112.50 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 78 | $195.00 | $195.00 | $195.00 | $195.00 |
| 33 | Asphaltic surface temporary (465.0125) | TON | 50 | $157.00 | $195.00 | $195.00 | $95.00 |
| 34 | Asphaltic flumes (465.0315) | SY | 14 | $84.00 | $65.00 | $65.00 | $65.00 |
| 35 | Concrete masonry culverts (504.0100) | CY | 36 | $1,000.00 | $1,000.00 | $1,675.00 | $1,000.00 |
| 36 | Bar steel reinforcement HS structures (505.0400) | LB | 840 | $2.39 | $2.39 | $4.00 | $2.39 |
| 37 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,670 | $2.63 | $2.63 | $4.00 | $2.63 |
| 38 | Rubberized membrane waterproofing (516.0500) | SY | 96 | $26.25 | $26.25 | $55.00 | $26.25 |
| 39 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 4 | $275.00 | $313.43 | $247.00 | $213.30 |
| 40 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 94 | $77.00 | $69.43 | $52.30 | $98.56 |
| 41 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 41 | $133.00 | $122.36 | $81.00 | $130.26 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $1,210.00 | $1,252.22 | $1,135.00 | $1,111.49 |
| 43 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,612.00 | $1,625.01 | $1,475.00 | $1,485.81 |
| 44 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434) | LF | 162 | $364.00 | $877.98 | $399.40 | $371.00 |
| 45 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 2 | $2,839.00 | $6,989.99 | $3,382.00 | $2,836.80 |
| 46 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 220 | $19.91 | $19.91 | $20.75 | $19.91 |
| 47 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 285 | $19.90 | $19.90 | $20.45 | $19.90 |
| 48 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 141 | $20.11 | $20.11 | $20.00 | $20.11 |
| 49 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 8,835 | $16.95 | $16.95 | $17.30 | $16.95 |
| 50 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 308 | $19.84 | $19.84 | $23.00 | $19.84 |
| 51 | Concrete curb pedestrian (601.0600) | LF | 153 | $54.63 | $54.63 | $45.00 | $54.63 |
| 52 | Concrete sidewalk 4-inch (602.0405) | SF | 24,090 | $6.15 | $6.15 | $6.65 | $6.15 |
| 53 | Concrete sidewalk 6-inch (602.0415) | SF | 4,265 | $6.95 | $6.95 | $7.80 | $6.95 |
| 54 | Curb ramp detectable warning field natural patina (602.0515) | SF | 370 | $30.00 | $30.00 | $34.00 | $30.00 |
| 55 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 120 | $53.00 | $53.00 | $55.00 | $53.00 |
| 56 | Concrete driveway 6-inch (602.0810) | SY | 2,104 | $71.19 | $71.19 | $69.75 | $71.19 |
| 57 | Concrete driveway 8-inch (602.0820) | SY | 192 | $72.19 | $72.19 | $74.35 | $72.19 |
| 58 | Concrete barrier type S32B (603.1332) | LF | 49 | $495.00 | $495.00 | $495.00 | $495.00 |
| 59 | Riprap medium (606.0200) | CY | 71 | $70.00 | $106.06 | $97.00 | $155.00 |
| 60 | Riprap heavy (606.0300) | CY | 57 | $70.65 | $100.47 | $97.00 | $165.00 |
| 61 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 140 | $87.00 | $82.44 | $69.70 | $87.10 |
| 62 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,107 | $87.00 | $85.59 | $73.15 | $108.15 |
| 63 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 291 | $100.00 | $115.78 | $105.20 | $127.23 |
| 64 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 1,813 | $127.00 | $117.24 | $115.10 | $134.24 |
| 65 | Storm sewer pipe class III-B 12- inch (608.3612) | LF | 344 | $74.00 | $74.25 | $70.75 | $95.27 |
| 66 | Storm sewer pipe class III-B 24- inch (608.3624) | LF | 139 | $114.00 | $141.75 | $132.70 | $172.37 |
| 67 | Reconstructing manholes (611.0420) | EACH | 3 | $3,232.00 | $687.22 | $2,040.00 | $766.17 |
| 68 | Manhole covers type J (611.0530) | EACH | 17 | $500.00 | $1,071.08 | $467.00 | $1,234.29 |
| 69 | Inlet covers type C (611.0612) | EACH | 1 | $522.00 | $1,099.07 | $488.00 | $1,265.89 |
| 70 | Inlet covers type H (611.0624) | EACH | 38 | $739.00 | $1,315.38 | $690.00 | $1,646.51 |
| 71 | Inlet covers type H-S (611.0639) | EACH | 10 | $739.00 | $1,440.39 | $690.00 | $1,646.51 |
| 72 | Inlet covers type MS (611.0642) | EACH | 7 | $510.00 | $631.40 | $477.00 | $564.32 |
| 73 | Inlet covers type T (611.0652) | EACH | 2 | $1,010.00 | $1,729.51 | $942.00 | $1,979.64 |
| 74 | Catch basins 5-FT diameter (611.1005) | EACH | 2 | $6,086.00 | $4,925.47 | $5,487.00 | $5,008.64 |
| 75 | Manholes 4-FT diameter (611.2004) | EACH | 10 | $3,910.00 | $2,391.64 | $4,038.00 | $2,758.29 |
| 76 | Manholes 5-FT diameter (611.2005) | EACH | 8 | $6,300.00 | $4,373.59 | $5,457.00 | $4,559.90 |
| 77 | Inlets 4-FT diameter (611.3004) | EACH | 12 | $3,825.00 | $2,283.79 | $3,472.00 | $2,426.24 |
| 78 | Inlets 2X3-FT (611.3230) | EACH | 36 | $2,650.00 | $1,670.55 | $2,658.00 | $1,721.71 |
| 79 | Inlets median 1 grate (611.3901) | EACH | 7 | $2,923.00 | $2,594.53 | $3,090.00 | $2,355.94 |
| 80 | Adjusting manhole covers (611.8110) | EACH | 8 | $909.00 | $610.59 | $525.00 | $685.79 |
| 81 | Pipe underdrain 6-inch (612.0106) | LF | 150 | $47.50 | $20.20 | $18.60 | $45.00 |
| 82 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 6 | $29.00 | $100.00 | $38.00 | $75.00 |
| 83 | Steel plate beam guard class A (614.0305) | LF | 75 | $40.00 | $60.00 | $32.00 | $40.00 |
| 84 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 2 | $3,750.00 | $4,500.00 | $5,000.00 | $3,750.00 |
| 85 | Fence safety (616.0700.S) | LF | 300 | $5.00 | $5.00 | $7.00 | $5.00 |
| 86 | Mobilization (619.1000) | EACH | 1 | $172,000 | $222,625 | $399,500 | $286,405 |
| 87 | Concrete median sloped nose (620.0300) | SF | 380 | $12.00 | $12.00 | $15.00 | $12.00 |
| 88 | Water (624.0100) | MGAL | 224 | $31.30 | $0.01 | $0.01 | $30.00 |
| 89 | Topsoil (625.0100) | SY | 18,560 | $3.85 | $0.01 | $5.85 | $2.86 |
| 90 | Silt fence (628.1504) | LF | 1,670 | $1.50 | $2.00 | $2.50 | $1.50 |
| 91 | Silt fence maintenance (628.1520) | LF | 1,670 | $0.01 | $0.01 | $0.01 | $0.01 |
| 92 | Erosion mat urban class I type A (628.2006) | SY | 12,130 | $0.01 | $1.68 | $2.00 | $0.01 |
| 93 | Erosion mat class II type C (628.2027) | SY | 6,430 | $0.01 | $3.40 | $2.00 | $0.01 |
| 94 | Inlet protection type A (628.7005) | EACH | 9 | $20.00 | $5.00 | $150.00 | $20.00 |
| 95 | Inlet protection type C (628.7015) | EACH | 43 | $20.00 | $68.00 | $80.00 | $20.00 |
| 96 | Inlet protection type D (628.7020) | EACH | 15 | $20.00 | $125.00 | $150.00 | $20.00 |
| 97 | Temporary ditch checks (628.7504) | LF | 90 | $4.00 | $8.00 | $10.00 | $4.00 |
| 98 | Culvert pipe checks (628.7555) | EACH | 20 | $12.00 | $14.00 | $10.00 | $12.00 |
| 99 | Rock bags (628.7570) | EACH | 180 | $12.00 | $14.00 | $10.00 | $12.00 |
| 100 | Fertilizer type B (629.0210) | CWT | 17.20 | $100.00 | $90.00 | $50.00 | $100.00 |
| 101 | Seeding mixture no. 30 (630.0130) | LB | 259 | $70.00 | $7.75 | $8.00 | $70.00 |
| 102 | Seeding mixture no. 40 (630.0140) | LB | 244 | $70.00 | $7.75 | $8.00 | $70.00 |
| 103 | Seeding mixture no. 75 (630.0175) | LB | 72.20 | $70.00 | $27.00 | $8.00 | $70.00 |
| 104 | Seeding temporary (630.0200) | LB | 48 | $5.00 | $5.00 | $3.00 | $5.00 |
| 105 | Seeding nurse crop (630.0400) | LB | 115.60 | $5.00 | $9.00 | $3.00 | $5.00 |
| 106 | Seed water (630.0500) | MGAL | 620 | $0.01 | $1.00 | $0.01 | $0.01 |
| 107 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 57 | $105.00 | $76.00 | $150.00 | $105.00 |
| 108 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 20 | $110.00 | $78.00 | $160.00 | $110.00 |
| 109 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 4 | $250.00 | $208.00 | $300.00 | $250.00 |
| 110 | Signs type II reflective H (637.2210) | SF | 520.27 | $15.00 | $22.95 | $27.00 | $15.00 |
| 111 | Signs type II reflective H folding (637.2215) | SF | 5.18 | $27.00 | $31.40 | $40.00 | $27.00 |
| 112 | Moving signs type II (638.2102) | EACH | 5 | $30.00 | $60.00 | $150.00 | $30.00 |
| 113 | Removing signs type II (638.2602) | EACH | 45 | $25.00 | $32.00 | $50.00 | $25.00 |
| 114 | Removing small sign supports (638.3000) | EACH | 44 | $10.00 | $32.00 | $50.00 | $10.00 |
| 115 | Moving small sign supports (638.4000) | EACH | 2 | $100.00 | $60.00 | $50.00 | $100.00 |
| 116 | Field office type B (642.5001) | EACH | 1 | $12,500 | $12,500 | $10,500 | $16,500 |
| 117 | Traffic control drums (643.0300) | DAY | 12,983 | $0.25 | $0.25 | $0.26 | $0.15 |
| 118 | Traffic control barricades type III (643.0420) | DAY | 5,024 | $0.55 | $0.55 | $0.68 | $0.45 |
| 119 | Traffic control warning lights type A (643.0705) | DAY | 5,620 | $0.15 | $0.15 | $0.18 | $0.10 |
| 120 | Traffic control warning lights type C (643.0715) | DAY | 1,410 | $0.15 | $0.15 | $0.20 | $0.10 |
| 121 | Traffic control signs (643.0900) | DAY | 38,025 | $0.45 | $0.45 | $0.41 | $0.15 |
| 122 | Traffic control covering signs type II (643.0920) | EACH | 8 | $125.00 | $125.00 | $41.48 | $100.00 |
| 123 | Traffic control signs fixed message (643.1000) | SF | 66 | $23.00 | $23.00 | $26.58 | $27.00 |
| 124 | Traffic control signs PCMS (643.1050) | DAY | 77 | $50.00 | $50.00 | $48.75 | $11.00 |
| 125 | Temporary marking line paint 6- inch (643.3165) | LF | 722 | $0.89 | $0.89 | $1.40 | $0.50 |
| 126 | Temporary marking line paint 10- inch (643.3265) | LF | 290 | $1.00 | $1.00 | $3.00 | $0.65 |
| 127 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 175 | $0.89 | $0.89 | $9.00 | $3.90 |
| 128 | Temporary marking arrow paint (643.3505) | EACH | 3 | $100.00 | $100.00 | $210.00 | $135.00 |
| 129 | Temporary marking word paint (643.3605) | EACH | 1 | $150.00 | $150.00 | $150.00 | $270.00 |
| 130 | Temporary marking stop line paint 18-inch (643.3805) | LF | 40 | $1.25 | $1.25 | $12.00 | $3.55 |
| 131 | Traffic control (643.5000) | EACH | 1 | $4,500.00 | $4,500.00 | $10,208 | $42,660 |
| 132 | Temporary pedestrian curb ramp (644.1601) | DAY | 39 | $5.00 | $5.00 | $13.41 | $10.00 |
| 133 | Temporary pedestrian detectable warning field (644.1605) | SF | 80 | $11.00 | $11.00 | $12.84 | $10.00 |
| 134 | Temporary pedestrian barricade (644.1810) | LF | 1,218 | $8.50 | $8.50 | $7.32 | $8.00 |
| 135 | Geotextile type C (645.0105) | SY | 75 | $2.80 | $7.98 | $10.00 | $5.00 |
| 136 | Geotextile type DF schedule A (645.0111) | SY | 88 | $2.80 | $1.14 | $10.00 | $3.75 |
| 137 | Geotextile type HR (645.0120) | SY | 338 | $2.80 | $3.58 | $5.00 | $6.30 |
| 138 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 14,720 | $1.33 | $1.34 | $1.33 | $1.33 |
| 139 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,159 | $2.84 | $2.87 | $2.84 | $2.84 |
| 140 | Marking arrow epoxy (646.5020) | EACH | 36 | $196.40 | $198.36 | $196.40 | $196.40 |
| 141 | Marking word epoxy (646.5120) | EACH | 1 | $384.60 | $388.45 | $384.60 | $384.60 |
| 142 | Marking stop line epoxy 18-inch (646.6120) | LF | 38 | $15.95 | $16.11 | $15.95 | $15.95 |
| 143 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 200 | $15.95 | $16.11 | $15.95 | $15.95 |
| 144 | Marking diagonal epoxy 12-inch (646.7120) | LF | 115 | $15.53 | $15.69 | $15.53 | $15.35 |
| 145 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,060 | $11.71 | $11.83 | $11.71 | $11.71 |
| 146 | Marking curb epoxy (646.8120) | LF | 40 | $7.62 | $7.70 | $7.62 | $7.62 |
| 147 | Marking island nose epoxy (646.8220) | EACH | 4 | $287.58 | $290.46 | $287.58 | $287.58 |
| 148 | Construction staking storm sewer (650.4000) | EACH | 76 | $75.00 | $75.00 | $75.00 | $75.00 |
| 149 | Construction staking subgrade (650.4500) | LF | 4,502 | $0.01 | $0.01 | $0.01 | $0.01 |
| 150 | Construction staking base (650.5000) | LF | 4,502 | $0.50 | $0.50 | $0.50 | $0.50 |
| 151 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 9,789 | $0.68 | $0.68 | $0.68 | $0.68 |
| 152 | Construction staking pipe culverts (650.6000) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 153 | Construction staking structure layout (structure) 01. V-44-0144 (650.6501) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 154 | Construction staking electrical installations (project) 01. 4676-04- 71 (650.8501) | EACH | 1 | $700.00 | $700.00 | $700.00 | $700.00 |
| 155 | Construction staking curb ramps (650.9000) | EACH | 20 | $125.00 | $125.00 | $125.00 | $125.00 |
| 156 | Construction staking sidewalk (project) 01. 4676-04-71 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 157 | Construction staking supplemental control (project) 01. 4676-04-71 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 158 | Construction staking slope stakes (650.9920) | LF | 4,502 | $0.75 | $0.75 | $0.75 | $0.75 |
| 159 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 180 | $10.00 | $12.00 | $12.00 | $10.00 |
| 160 | Conduit special 2-inch (652.0605) | LF | 252 | $15.00 | $28.00 | $28.00 | $15.00 |
| 161 | Install conduit into existing item (652.0700.S) | EACH | 1 | $300.00 | $275.00 | $275.00 | $300.00 |
| 162 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 2 | $2,400.00 | $2,200.00 | $2,200.00 | $2,400.00 |
| 163 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,093 | $2.15 | $2.00 | $2.00 | $2.15 |
| 164 | Cable traffic signal 7-14 AWG (655.0240) | LF | 74 | $2.25 | $2.75 | $2.75 | $2.25 |
| 165 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,480 | $1.05 | $1.00 | $1.00 | $1.05 |
| 166 | Electrical wire lighting 12 AWG (655.0610) | LF | 135 | $1.00 | $1.00 | $1.00 | $1.00 |
| 167 | Loop detector lead in cable (655.0700) | LF | 30 | $1.45 | $1.50 | $1.50 | $1.45 |
| 168 | Pedestal bases (657.0100) | EACH | 5 | $250.00 | $380.00 | $380.00 | $250.00 |
| 169 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 5 | $650.00 | $535.00 | $535.00 | $650.00 |
| 170 | Trombone arms 25-FT (657.0595) | EACH | 1 | $2,400.00 | $2,295.00 | $2,295.00 | $2,400.00 |
| 171 | Pedestrian signal face 16-inch (658.0416) | EACH | 4 | $600.00 | $485.00 | $485.00 | $600.00 |
| 172 | Pedestrian push buttons (658.0500) | EACH | 4 | $425.00 | $475.00 | $475.00 | $425.00 |
| 173 | Signal mounting hardware (location) 01. CTH N and CTH KK (658.5070) | EACH | 1 | $6,500.00 | $1,550.00 | $1,550.00 | $6,500.00 |
| 174 | Sawing asphalt (690.0150) | LF | 541 | $1.75 | $1.86 | $3.50 | $1.75 |
| 175 | Sawing concrete (690.0250) | LF | 539 | $2.35 | $3.88 | $3.50 | $2.35 |
| 176 | Incentive strength concrete structures (715.0502) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 177 | Incentive strength concrete barrier (715.0603) | DOL | 25 | $1.00 | $1.00 | $1.00 | $1.00 |
| 178 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 179 | Incentive iri ride (740.0440) | DOL | 2,115 | $1.00 | $1.00 | $1.00 | $1.00 |
| 180 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 181 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 |
| 182 | Special 01. mini storm sewer cleanout (SPV.0060) | EACH | 5 | $632.00 | $721.47 | $366.00 | $473.23 |
| 183 | Special 02. underground detention system 1 (SPV.0060) | EACH | 1 | $158,000 | $282,079 | $152,692 | $295,206 |
| 184 | Special 03. underground detention system 2 (SPV.0060) | EACH | 1 | $156,000 | $160,759 | $130,790 | $225,197 |
| 185 | Special 04. underground detention system 3 (SPV.0060) | EACH | 1 | $151,000 | $144,550 | $140,790 | $364,128 |
| 186 | Special 05. underground detention system 4 (SPV.0060) | EACH | 1 | $60,000 | $61,372 | $53,660 | $113,411 |
| 187 | Special 06. salvage and reinstall traffic signal (CTH N and CTH KK) (SPV.0060) | EACH | 1 | $6,500.00 | $1,500.00 | $1,500.00 | $6,500.00 |
| 188 | Special 07. video vehicle detection system (CTH N and CTH KK) (SPV.0060) | EACH | 1 | $46,000 | $39,900 | $39,900 | $46,000 |
| 189 | Special 08. salvage and reset existing gate (SPV.0060) | EACH | 1 | $6,450.00 | $3,000.00 | $7,000.00 | $7,750.00 |
| 190 | Special 09. temporary access gate (SPV.0060) | EACH | 1 | $4,250.00 | $2,800.00 | $2,200.00 | $4,250.00 |
| 191 | Special 10. adjusting water valve boxes (SPV.0060) | EACH | 12 | $255.00 | $282.08 | $300.00 | $350.00 |
| 192 | Special 12. adjusting water service curb stops (SPV.0060) | EACH | 13 | $203.00 | $141.04 | $150.00 | $250.00 |
| 193 | Special 13. concrete bases type 1 special (SPV.0060) | EACH | 5 | $1,500.00 | $1,575.00 | $1,575.00 | $1,500.00 |
| 194 | Special 14. concrete bases type 2 special (SPV.0060) | EACH | 2 | $1,800.00 | $1,775.00 | $1,775.00 | $1,800.00 |
| 195 | Special 15. connect to existing conduit (SPV.0060) | EACH | 2 | $300.00 | $125.00 | $125.00 | $300.00 |
| 196 | Special 16. utility line opening (SPV.0060) | EACH | 1 | $1,525.00 | $4,000.00 | $1,000.00 | $1,000.00 |
| 197 | Special 17. manual roller gate 22- FT (SPV.0060) | EACH | 1 | $0.01 | $4,500.00 | $1.00 | $0.01 |
| 198 | Special 01. low maintenance seed mixture (SPV.0085) | LB | 28 | $10.00 | $13.50 | $20.00 | $10.00 |
| 199 | Special 01. mini storm sewer 4-inch (SPV.0090) | LF | 217 | $53.00 | $29.26 | $40.00 | $69.38 |
| 200 | Special 02. mini storm sewer 6-inch (SPV.0090) | LF | 37 | $52.00 | $45.19 | $55.00 | $78.30 |
| 201 | Special 03. cable traffic signal 16- 14 AWG (SPV.0090) | LF | 502 | $12.00 | $4.75 | $4.75 | $12.00 |
| 202 | Special 04. tray cable for street lighting 3 conductor 12 AWG (SPV.0090) | LF | 270 | $2.75 | $1.75 | $1.75 | $2.75 |
| 203 | Special 05. slatted chain link fence 6-FT (SPV.0090) | LF | 150 | $75.00 | $63.00 | $75.00 | $75.00 |
| 204 | Special 06. pipe arch structural plate 162X114-inch (SPV.0090) | LF | 57 | $1,400.00 | $1,005.15 | $1,130.00 | $1,148.44 |
| 205 | Special 07. reinstall water service lateral 1-inch (SPV.0090) | LF | 100 | $76.00 | $72.14 | $85.00 | $70.97 |
| 206 | Special 08. salvage and reset existing fence (SPV.0090) | LF | 100 | $65.00 | $40.00 | $40.00 | $65.00 |
| 207 | Special 09. salvage and relocate existing fence (SPV.0090) | LF | 200 | $0.01 | $40.00 | $1.00 | $0.01 |
| 208 | Special 01. topsoil special (SPV.0180) | SY | 165 | $20.00 | $8.50 | $16.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.