WisDOT contract 20261013010 bid tabulation
1130-66-71. Let by Wisconsin DOT on October 13, 2026, Outagamie. 5 bids received; low bid $129,719,050 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 13 OCT 2026
- Pay items
- 519
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $129,719,050 | Low |
| 2 | James Peterson Sons, Inc. | $131,774,432 | +2.0% |
| 3 | Michels Road & Stone, Inc. | $135,633,439 | +5.0% |
| 4 | Hoffman Construction Company | $137,429,253 | +6.0% |
| 5 | Vinton Construction Company | $156,105,904 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. James Peterson Sons, Inc. | 3. Michels Road & Stone, Inc. | 4. Hoffman Construction Company | 5. Vinton Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 158 | $400.00 | $690.00 | $690.00 | $689.96 | $690.00 |
| 2 | Grubbing (201.0205) | STA | 158 | $300.00 | $255.00 | $255.00 | $254.99 | $255.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 34 | $1,333.00 | $1,333.00 | $738.00 | $1,607.13 | $1,607.21 |
| 4 | Removing structure (structure) 0001. B-44-40 (203.0220) | EACH | 1 | $115,000 | $115,000 | $115,000 | $114,994 | $115,000 |
| 5 | Removing structure (structure) 0002. C-44-20 (203.0220) | EACH | 1 | $58,165 | $58,165 | $28,000 | $13,869 | $13,870 |
| 6 | Removing structure (structure) 0003. B-44-41 (203.0220) | EACH | 1 | $145,000 | $145,000 | $145,000 | $144,993 | $145,000 |
| 7 | Removing structure (structure) 0004. C-44-25 (203.0220) | EACH | 1 | $39,500 | $39,500 | $28,000 | $15,739 | $15,740 |
| 8 | Removing structure (structure) 0005. B-44-43 (203.0220) | EACH | 1 | $145,000 | $145,000 | $145,000 | $144,993 | $145,000 |
| 9 | Removing structure (structure) 0006. B-44-42 (203.0220) | EACH | 1 | $115,000 | $115,000 | $115,000 | $114,994 | $115,000 |
| 10 | Removing structure (structure) 0007. R-44-24 (203.0220) | EACH | 1 | $5,000.00 | $5,000.00 | $11,000 | $9,999.50 | $10,000 |
| 11 | Removing structure (structure) 0008. R-44-25 (203.0220) | EACH | 1 | $5,000.00 | $5,000.00 | $11,000 | $9,999.50 | $10,000 |
| 12 | Removing structure (structure) 0009. C-44-26 (203.0220) | EACH | 1 | $42,500 | $42,500 | $28,000 | $20,384 | $20,385 |
| 13 | Removing structure (structure) 0041. B-44-41 (203.0220) | EACH | 1 | $100,000 | $100,000 | $100,000 | $99,995 | $100,000 |
| 14 | Removing structure (structure) 0043. B-44-43 (203.0220) | EACH | 1 | $100,000 | $100,000 | $100,000 | $99,995 | $100,000 |
| 15 | Removing concrete pavement (204.0100) | SY | 166,710 | $4.20 | $4.20 | $1.00 | $10.00 | $4.50 |
| 16 | Removing asphaltic surface milling (204.0120) | SY | 24,611 | $3.80 | $3.80 | $3.80 | $3.80 | $3.80 |
| 17 | Removing curb & gutter (204.0150) | LF | 1,225 | $3.02 | $3.02 | $10.00 | $10.00 | $6.00 |
| 18 | Removing concrete sidewalk (204.0155) | SY | 2,100 | $4.15 | $4.15 | $15.00 | $20.00 | $9.00 |
| 19 | Removing guardrail (204.0165) | LF | 16,330 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 20 | Removing cable barrier (204.0167) | LF | 12,291 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 21 | Removing fence (204.0170) | LF | 55,970 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 22 | Removing delineators and markers (204.0180) | EACH | 137 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 23 | Removing surface drains (204.0190) | EACH | 1 | $500.00 | $500.00 | $300.00 | $499.97 | $500.00 |
| 24 | Removing concrete bases (204.0195) | EACH | 10 | $350.00 | $200.00 | $200.00 | $199.99 | $200.00 |
| 25 | Removing inlets (204.0220) | EACH | 26 | $400.00 | $400.00 | $475.00 | $585.24 | $585.27 |
| 26 | Removing storm sewer (size) 0001. 18-inch or less (204.0245) | LF | 1,843 | $17.23 | $17.23 | $8.00 | $17.66 | $17.66 |
| 27 | Removing storm sewer (size) 0002. 24-inch (204.0245) | LF | 105 | $47.71 | $47.71 | $10.00 | $21.83 | $21.83 |
| 28 | Removing storm sewer (size) 0003. 30-inch (204.0245) | LF | 300 | $13.34 | $13.34 | $15.00 | $22.82 | $22.82 |
| 29 | Removing storm sewer (size) 0004. 36-inch (204.0245) | LF | 330 | $36.73 | $36.73 | $19.00 | $25.56 | $25.56 |
| 30 | Removing storm sewer (size) 0005. 42-inch (204.0245) | LF | 160 | $14.47 | $14.47 | $22.00 | $27.96 | $27.96 |
| 31 | Removing ancillary structure (structure) 0001. S-44-144 (204.0246) | EACH | 1 | $12,500 | $12,500 | $12,500 | $12,499 | $12,500 |
| 32 | Removing ancillary structure (structure) 0002. S-44-201 (204.0246) | EACH | 1 | $12,500 | $12,500 | $12,500 | $12,499 | $12,500 |
| 33 | Removing ancillary structure (structure) 0003. S-44-202 (204.0246) | EACH | 1 | $12,500 | $12,500 | $12,500 | $12,499 | $12,500 |
| 34 | Abandoning culvert pipes (204.0270) | EACH | 1 | $5,000.00 | $5,000.00 | $1,426.00 | $6,067.70 | $6,068.00 |
| 35 | Sealing pipes (204.0280) | EACH | 16 | $500.00 | $500.00 | $751.00 | $308.62 | $308.64 |
| 36 | Abandoning sewer (204.0291.S) | CY | 44.10 | $400.00 | $400.00 | $352.00 | $145.50 | $145.51 |
| 37 | Removing (item description) 0002. business sign and base (204.9060.S) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $3,999.80 | $4,000.00 |
| 38 | Removing (item description) 0003. inlet covers (204.9060.S) | EACH | 1 | $400.00 | $400.00 | $250.00 | $584.97 | $226.72 |
| 39 | Removing (item description) 0501. street light assembly (204.9060.S) | EACH | 9 | $1,000.00 | $1,000.00 | $1,000.00 | $999.95 | $1,000.00 |
| 40 | Removing (item description) 0502. lighting control (204.9060.S) | EACH | 1 | $2,750.00 | $2,750.00 | $2,750.00 | $2,749.87 | $2,750.00 |
| 41 | Removing (item description) 0503. luminaires (204.9060.S) | EACH | 10 | $200.00 | $200.00 | $200.00 | $199.99 | $200.00 |
| 42 | Removing (item description) 0504. temporary wood poles (204.9060.S) | EACH | 4 | $350.00 | $350.00 | $350.00 | $349.98 | $350.00 |
| 43 | Removing (item description) 0701. communication vault (204.9060.S) | EACH | 27 | $250.00 | $250.00 | $250.00 | $249.99 | $250.00 |
| 44 | Removing (item description) 0001. drain slotted vane (204.9090.S) | LF | 2,361 | $10.00 | $10.00 | $22.00 | $17.00 | $17.00 |
| 45 | Removing (item description) 0501. electrical conductors from existing conduit (204.9090.S) | LF | 2,053 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 46 | Removing (item description) 0502. or abandoning existing conduit (204.9090.S) | LF | 540 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 47 | Excavation common (205.0100) | CY | 609,182 | $13.44 | $13.44 | $15.40 | $25.00 | $19.98 |
| 48 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 150 | $95.50 | $95.50 | $88.00 | $99.99 | $90.00 |
| 49 | Temporary emergency pullouts (205.3000.S) | EACH | 1 | $5,000.00 | $35,250 | $11,250 | $4,999.75 | $50,000 |
| 50 | Excavation for structures bridges (structure) 0001. B-44-334 (206.1001) | EACH | 1 | $27,540 | $35,300 | $64,000 | $7,499,627 | $20,000 |
| 51 | Excavation for structures bridges (structure) 0002. B-44-335 (206.1001) | EACH | 1 | $23,000 | $32,292 | $70,000 | $74,996 | $20,000 |
| 52 | Excavation for structures bridges (structure) 0003. B-44-336 (206.1001) | EACH | 1 | $28,700 | $55,970 | $67,000 | $7,499,627 | $35,000 |
| 53 | Excavation for structures bridges (structure) 0004. B-44-337 (206.1001) | EACH | 1 | $43,455 | $60,800 | $73,000 | $74,996 | $35,000 |
| 54 | Excavation for structures culverts (structure) 0001. C-44-148 (206.2001) | EACH | 1 | $92,004 | $92,004 | $80,000 | $59,221 | $59,224 |
| 55 | Excavation for structures culverts (structure) 0002. C-44-149 (206.2001) | EACH | 1 | $88,024 | $88,024 | $80,000 | $69,286 | $69,289 |
| 56 | Excavation for structures culverts (structure) 0007. C-44-150 (206.2001) | EACH | 1 | $53,671 | $53,671 | $82,000 | $78,766 | $78,770 |
| 57 | Backfill coarse aggregate (size) 0001. no. 1 (209.0300.S) | CY | 700 | $63.65 | $63.65 | $47.00 | $73.01 | $73.01 |
| 58 | Backfill structure type A (210.1500) | TON | 2,420 | $50.23 | $50.23 | $40.00 | $65.00 | $32.00 |
| 59 | Backfill structure type B (210.2500) | TON | 6,937 | $39.49 | $39.49 | $25.00 | $25.00 | $25.00 |
| 60 | Prepare foundation for concrete pavement (project) 0001. 1130-66- 77 (211.0201) | EACH | 1 | $1.00 | $0.01 | $30,000 | $0.01 | $5,000.00 |
| 61 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 24 | $50.00 | $250.00 | $350.00 | $249.99 | $700,000 |
| 62 | Finishing roadway (project) 0001. 1130-66-71 (213.0100) | EACH | 1 | $1,000.00 | $1,500.00 | $5,000.00 | $0.01 | $10,000 |
| 63 | Finishing roadway (project) 0002. 1130-66-72 (213.0100) | EACH | 1 | $1,000.00 | $1,500.00 | $5,000.00 | $0.01 | $10,000 |
| 64 | Finishing roadway (project) 0003. 1130-66-77 (213.0100) | EACH | 1 | $1,000.00 | $1,500.00 | $2,500.00 | $0.01 | $10,000 |
| 65 | Finishing roadway (project) 0004. 1130-66-84 (213.0100) | EACH | 1 | $1,000.00 | $1,500.00 | $1,000.00 | $0.01 | $10,000 |
| 66 | Base aggregate dense 3/4-inch (305.0110) | TON | 11,854 | $30.36 | $30.36 | $27.20 | $50.00 | $35.90 |
| 67 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 274,693 | $16.15 | $15.66 | $14.65 | $0.01 | $14.59 |
| 68 | Base aggregate open-graded (310.0110) | TON | 6 | $76.25 | $76.75 | $100.00 | $104.98 | $104.99 |
| 69 | Breaker run (311.0110) | TON | 2,236 | $21.00 | $20.49 | $18.00 | $0.01 | $22.05 |
| 70 | Select crushed material (312.0110) | TON | 1,012,653 | $21.00 | $20.49 | $14.65 | $0.04 | $19.90 |
| 71 | Concrete base 4-inch (320.0105) | SY | 13,802 | $60.00 | $56.05 | $65.92 | $56.05 | $64.11 |
| 72 | Coloring concrete wisdot red (405.0100) | CY | 378 | $200.00 | $100.11 | $175.00 | $100.10 | $90.00 |
| 73 | Concrete pavement 9-inch (415.0090) | SY | 9,015 | $74.30 | $71.89 | $81.74 | $71.89 | $65.37 |
| 74 | Concrete pavement 9 1/2-inch (415.0095) | SY | 2,800 | $75.00 | $103.21 | $132.07 | $103.21 | $96.49 |
| 75 | Concrete pavement approach slab (415.0410) | SY | 1,152 | $236.00 | $218.78 | $249.78 | $218.77 | $247.00 |
| 76 | Concrete truck apron 12-inch (415.2010) | SY | 805 | $140.00 | $142.98 | $109.00 | $142.97 | $116.28 |
| 77 | Concrete pavement joint filling (415.4100) | SY | 4,783 | $3.00 | $2.50 | $2.50 | $2.50 | $2.50 |
| 78 | Drilled tie bars (416.0610) | EACH | 10,309 | $12.00 | $10.39 | $12.29 | $10.39 | $11.00 |
| 79 | Drilled dowel bars (416.0620) | EACH | 302 | $30.00 | $16.13 | $16.67 | $16.13 | $20.00 |
| 80 | HMA cold weather paving (450.4000) | TON | 6,064 | $4.10 | $4.10 | $4.10 | $4.10 | $4.10 |
| 81 | Tack coat (455.0605) | GAL | 11,108 | $4.40 | $4.40 | $4.40 | $4.40 | $4.40 |
| 82 | Incentive density HMA pavement (460.2000) | DOL | 11,190 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 83 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 4,849 | $98.50 | $98.50 | $98.50 | $98.50 | $98.50 |
| 84 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 4,814 | $109.20 | $109.20 | $109.20 | $109.20 | $109.20 |
| 85 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 4,194 | $100.20 | $100.20 | $100.20 | $100.20 | $100.20 |
| 86 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 3,386 | $112.70 | $112.70 | $112.70 | $112.70 | $112.70 |
| 87 | Asphaltic surface temporary (465.0125) | TON | 40,773 | $129.40 | $129.40 | $129.40 | $129.40 | $129.40 |
| 88 | Asphaltic flumes (465.0315) | SY | 7 | $125.00 | $125.00 | $125.00 | $124.99 | $125.00 |
| 89 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 4,090 | $0.66 | $1.05 | $1.05 | $1.05 | $1.05 |
| 90 | Cold patch (495.1000.S) | TON | 40 | $1.00 | $935.00 | $500.00 | $499.97 | $500.00 |
| 91 | Ice hot weather concreting (501.1000.S) | LB | 18,949 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 92 | Concrete masonry bridges (502.0100) | CY | 1,502.80 | $725.00 | $725.00 | $725.00 | $724.96 | $725.00 |
| 93 | Protective surface treatment (502.3200) | SY | 5,895 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 94 | Pigmented surface sealer (502.3210) | SY | 859 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 95 | Prestressed girder type I 36W-inch (503.0137) | LF | 4,291 | $325.00 | $325.00 | $325.00 | $324.98 | $325.00 |
| 96 | Concrete masonry culverts (504.0100) | CY | 851 | $1,130.12 | $1,130.12 | $1,046.49 | $947.95 | $948.00 |
| 97 | Bar steel reinforcement HS structures (505.0400) | LB | 189,870 | $1.50 | $1.18 | $1.50 | $1.44 | $1.50 |
| 98 | Bar steel reinforcement HS coated structures (505.0600) | LB | 643,740 | $1.55 | $1.55 | $1.55 | $1.55 | $1.55 |
| 99 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 9,500 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 100 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 140 | $100.00 | $100.00 | $100.00 | $99.99 | $100.00 |
| 101 | Steel diaphragms (structure) 0001. B-44-334 (506.4000) | EACH | 24 | $950.00 | $950.00 | $950.00 | $949.95 | $950.00 |
| 102 | Steel diaphragms (structure) 0002. B-44-335 (506.4000) | EACH | 24 | $950.00 | $950.00 | $950.00 | $949.95 | $950.00 |
| 103 | Steel diaphragms (structure) 0003. B-44-336 (506.4000) | EACH | 18 | $950.00 | $950.00 | $950.00 | $949.95 | $950.00 |
| 104 | Steel diaphragms (structure) 0004. B-44-337 (506.4000) | EACH | 18 | $950.00 | $950.00 | $950.00 | $949.95 | $950.00 |
| 105 | Polymer overlay (509.5100.S) | SY | 12,143 | $43.08 | $39.00 | $43.08 | $43.08 | $43.08 |
| 106 | Temporary shoring (511.1100) | SF | 34,776 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 107 | Temporary shoring (structure) 0001. B-44-336 (511.1200) | SF | 1,260 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 108 | Temporary shoring (structure) 0002. B-44-337 (511.1200) | SF | 1,260 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 109 | Temporary shoring (structure) 0003. C-44-148 (511.1200) | SF | 1,080 | $0.01 | $0.01 | $75.00 | $56.00 | $56.00 |
| 110 | Temporary shoring (structure) 0004. C-44-149 (511.1200) | SF | 1,200 | $0.01 | $0.01 | $75.00 | $56.00 | $56.00 |
| 111 | Temporary shoring (structure) 0005. B-44-334 (511.1200) | SF | 1,260 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 112 | Temporary shoring (structure) 0006. B-44-335 (511.1200) | SF | 1,260 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 113 | Temporary shoring (structure) 0007. C-44-150 (511.1200) | SF | 750 | $0.01 | $0.01 | $75.00 | $134.99 | $135.00 |
| 114 | Rubberized membrane waterproofing (516.0500) | SY | 240 | $20.00 | $30.42 | $20.00 | $33.33 | $20.00 |
| 115 | Concrete staining (structure) 0001. B-44-334 (517.1010.S) | SF | 4,117 | $1.98 | $2.09 | $1.98 | $1.98 | $1.98 |
| 116 | Concrete staining (structure) 0002. B-44-335 (517.1010.S) | SF | 4,117 | $1.98 | $2.09 | $1.98 | $1.98 | $1.98 |
| 117 | Concrete staining (structure) 0003. B-44-336 (517.1010.S) | SF | 6,035 | $1.98 | $2.09 | $1.98 | $1.98 | $1.98 |
| 118 | Concrete staining (structure) 0004. B-44-337 (517.1010.S) | SF | 5,990 | $1.98 | $2.09 | $1.98 | $1.98 | $1.98 |
| 119 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 26 | $234.70 | $234.70 | $529.00 | $478.27 | $478.29 |
| 120 | Apron endwalls for culvert pipe 15- inch (520.1015) | EACH | 4 | $265.67 | $265.67 | $567.00 | $511.72 | $511.75 |
| 121 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 1 | $850.00 | $850.00 | $918.00 | $1,022.56 | $1,022.61 |
| 122 | Culvert pipe temporary 12-inch (520.2012) | LF | 2,617 | $42.22 | $42.22 | $69.00 | $69.75 | $69.75 |
| 123 | Culvert pipe temporary 15-inch (520.2015) | LF | 292 | $81.25 | $81.25 | $72.00 | $73.08 | $73.08 |
| 124 | Culvert pipe temporary 18-inch (520.2018) | LF | 751 | $71.72 | $71.72 | $79.00 | $82.30 | $82.30 |
| 125 | Culvert pipe temporary 24-inch (520.2024) | LF | 51 | $125.65 | $125.65 | $114.00 | $106.21 | $106.22 |
| 126 | Culvert pipe temporary 30-inch (520.2030) | LF | 190 | $122.50 | $122.50 | $129.00 | $119.80 | $119.81 |
| 127 | Culvert pipe temporary 36-inch (520.2036) | LF | 40 | $91.35 | $91.35 | $152.00 | $154.95 | $154.96 |
| 128 | Culvert pipe temporary 42-inch (520.2042) | LF | 26 | $161.02 | $161.02 | $222.00 | $193.19 | $193.20 |
| 129 | Concrete collars for pipe (520.8000) | EACH | 27 | $839.13 | $839.13 | $796.00 | $1,271.78 | $1,271.85 |
| 130 | Culvert pipe reinforced concrete class III 18-inch (522.0118) | LF | 80 | $143.05 | $143.05 | $144.00 | $88.11 | $88.11 |
| 131 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 192 | $128.12 | $128.17 | $129.00 | $110.18 | $110.19 |
| 132 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 386 | $158.01 | $158.01 | $145.00 | $142.62 | $142.63 |
| 133 | Culvert pipe reinforced concrete class III 54-inch (522.0154) | LF | 432 | $351.82 | $351.82 | $368.00 | $315.57 | $315.59 |
| 134 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 104 | $98.86 | $98.86 | $94.00 | $88.11 | $88.11 |
| 135 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 300 | $157.45 | $157.45 | $152.00 | $148.73 | $148.74 |
| 136 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 250 | $413.02 | $413.02 | $222.00 | $177.20 | $177.21 |
| 137 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 75 | $1,219.76 | $1,219.76 | $1,145.00 | $1,177.32 | $1,177.38 |
| 138 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 23 | $1,340.91 | $1,340.91 | $1,263.00 | $1,376.71 | $1,376.78 |
| 139 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 15 | $1,528.61 | $1,528.61 | $1,443.00 | $1,706.08 | $1,706.17 |
| 140 | Apron endwalls for culvert pipe reinforced concrete 27-inch (522.1027) | EACH | 1 | $1,636.57 | $1,636.57 | $1,584.00 | $2,045.28 | $2,045.39 |
| 141 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 13 | $1,721.82 | $1,721.82 | $1,693.00 | $2,121.82 | $2,121.93 |
| 142 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 9 | $2,279.62 | $2,279.62 | $2,257.00 | $2,682.06 | $2,682.19 |
| 143 | Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054) | EACH | 4 | $4,122.26 | $4,122.26 | $3,417.00 | $3,913.81 | $3,914.00 |
| 144 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (522.2324) | LF | 492 | $189.96 | $189.96 | $180.00 | $179.23 | $179.24 |
| 145 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (522.2329) | LF | 542 | $256.16 | $256.16 | $259.00 | $225.62 | $225.63 |
| 146 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 14X23-inch (522.2414) | LF | 293 | $157.25 | $157.25 | $170.00 | $151.55 | $151.56 |
| 147 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 336 | $232.18 | $232.18 | $195.00 | $194.06 | $194.07 |
| 148 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 180 | $282.48 | $282.48 | $237.00 | $258.47 | $258.48 |
| 149 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 8 | $1,756.12 | $1,756.12 | $1,561.00 | $1,767.16 | $1,767.25 |
| 150 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 8 | $2,097.29 | $2,097.29 | $1,966.00 | $2,311.46 | $2,311.58 |
| 151 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 6 | $2,526.84 | $2,526.84 | $2,362.00 | $2,731.12 | $2,731.25 |
| 152 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $4,096.98 | $4,096.98 | $3,231.00 | $3,903.42 | $3,903.61 |
| 153 | Apron endwalls for culvert pipe salvaged 12-inch (524.0612) | EACH | 1 | $613.94 | $613.94 | $705.00 | $1,776.91 | $1,777.00 |
| 154 | Apron endwalls for culvert pipe salvaged 15-inch (524.0615) | EACH | 4 | $614.12 | $614.12 | $754.00 | $1,538.92 | $1,539.00 |
| 155 | Apron endwalls for culvert pipe salvaged 18-inch (524.0618) | EACH | 12 | $694.70 | $694.70 | $802.00 | $1,420.18 | $1,420.25 |
| 156 | Apron endwalls for culvert pipe salvaged 24-inch (524.0624) | EACH | 2 | $845.53 | $845.53 | $850.00 | $2,026.89 | $2,027.00 |
| 157 | Apron endwalls for culvert pipe salvaged 30-inch (524.0630) | EACH | 4 | $1,077.38 | $1,077.38 | $899.00 | $2,531.13 | $2,531.25 |
| 158 | Apron endwalls for culvert pipe salvaged 36-inch (524.0636) | EACH | 1 | $1,669.94 | $1,669.94 | $947.00 | $2,644.48 | $2,644.61 |
| 159 | Apron endwalls for culvert pipe salvaged 42-inch (524.0642) | EACH | 1 | $1,989.00 | $1,989.00 | $995.00 | $2,985.36 | $2,985.50 |
| 160 | Concrete masonry ancillary structures type NS (531.1100) | CY | 26.40 | $800.00 | $800.00 | $800.00 | $799.96 | $800.00 |
| 161 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 3,960 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 162 | Drilling shaft 24-inch (531.2024) | LF | 220 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 163 | Drilling shaft 30-inch (531.2030) | LF | 120 | $250.00 | $250.00 | $250.00 | $249.99 | $250.00 |
| 164 | Drilling shaft 36-inch (531.2036) | LF | 466 | $250.00 | $255.90 | $250.00 | $249.99 | $250.00 |
| 165 | Foundation camera pole 50-FT (531.4050) | EACH | 2 | $2,500.00 | $2,500.00 | $2,500.00 | $2,499.88 | $2,500.00 |
| 166 | Foundation two-shaft butterfly type B-I (structure) 0001. S-44-336 (531.5030) | EACH | 1 | $17,660 | $17,660 | $17,660 | $17,659 | $17,660 |
| 167 | Foundation two-shaft butterfly type B-I (structure) 0002. S-44-381 (531.5030) | EACH | 1 | $17,660 | $17,660 | $17,660 | $17,659 | $17,660 |
| 168 | Foundation two-shaft butterfly type B-I (structure) 0003. S-44-386 (531.5030) | EACH | 1 | $17,660 | $17,660 | $17,660 | $17,659 | $17,660 |
| 169 | Foundation two-shaft butterfly type B-I (structure) 0004. S-44-393 (531.5030) | EACH | 1 | $17,660 | $17,660 | $17,660 | $17,659 | $17,660 |
| 170 | Foundation single-shaft type TF-II (structure) 0001. S-44-389 (531.5420) | EACH | 2 | $9,500.00 | $9,500.00 | $9,500.00 | $9,499.53 | $9,500.00 |
| 171 | Foundation single-shaft type TF-II (structure) 0002. S-44-388 (531.5420) | EACH | 2 | $9,500.00 | $9,500.00 | $9,500.00 | $9,499.53 | $9,500.00 |
| 172 | Foundation single-shaft type TF-II (structure) 0003. S-44-390 (531.5420) | EACH | 2 | $9,500.00 | $9,500.00 | $9,500.00 | $9,499.53 | $9,500.00 |
| 173 | Foundation two-shaft type FC-I (structure) 0001. S-44-335 (531.6010) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 174 | Foundation two-shaft type FC-I (structure) 0002. S-44-382 (531.6010) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 175 | Foundation two-shaft type FC-I (structure) 0003. S-44-385 (531.6010) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 176 | Foundation two-shaft type FC-I (structure) 0004. S-44-387 (531.6010) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 177 | Foundation two-shaft type FC-II (structure) 0003. S-44-391 (531.6020) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 178 | Foundation two-shaft type FC-II (structure) 0004. S-44-392 (531.6020) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 179 | Foundation two-shaft type FC-II (structure) 0005. S-44-394 (531.6020) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 180 | Foundation two-shaft type FC-II (structure) 0006. S-44-395 (531.6020) | EACH | 1 | $23,600 | $23,600 | $23,600 | $23,599 | $23,600 |
| 181 | Foundation two-shaft type FF-II (structure) 0001. S-44-404 (531.6120) | EACH | 2 | $37,600 | $37,600 | $37,600 | $37,598 | $37,600 |
| 182 | Butterfly 2-chord NS (structure) 0001. S-44-336 (532.5020) | EACH | 1 | $45,244 | $45,244 | $45,244 | $45,242 | $45,244 |
| 183 | Butterfly 2-chord NS (structure) 0002. S-44-381 (532.5020) | EACH | 1 | $46,311 | $46,311 | $46,311 | $46,309 | $46,311 |
| 184 | Butterfly 2-chord NS (structure) 0003. S-44-386 (532.5020) | EACH | 1 | $45,948 | $45,948 | $45,948 | $45,946 | $45,948 |
| 185 | Butterfly 2-chord NS (structure) 0004. S-44-393 (532.5020) | EACH | 1 | $45,651 | $45,651 | $45,651 | $45,649 | $45,651 |
| 186 | Truss full span 2-chord type II (structure) 0001. S-44-388 (532.5420) | EACH | 1 | $65,550 | $65,550 | $65,550 | $65,547 | $65,550 |
| 187 | Truss full span 2-chord type II (structure) 0002. S-44-389 (532.5420) | EACH | 1 | $65,550 | $65,550 | $65,550 | $65,547 | $65,550 |
| 188 | Truss full span 2-chord type II (structure) 0003. S-44-390 (532.5420) | EACH | 1 | $54,000 | $54,000 | $54,000 | $53,997 | $54,000 |
| 189 | Truss cantilever 4-chord type I (structure) 0001. S-44-335 (532.6010) | EACH | 1 | $56,751 | $56,751 | $56,751 | $56,748 | $56,751 |
| 190 | Truss cantilever 4-chord type I (structure) 0002. S-44-382 (532.6010) | EACH | 1 | $58,181 | $58,181 | $58,181 | $58,178 | $58,181 |
| 191 | Truss cantilever 4-chord type I (structure) 0003. S-44-385 (532.6010) | EACH | 1 | $56,762 | $56,762 | $56,762 | $56,759 | $56,762 |
| 192 | Truss cantilever 4-chord type I (structure) 0004. S-44-387 (532.6010) | EACH | 1 | $57,026 | $57,026 | $57,026 | $57,023 | $57,026 |
| 193 | Truss cantilever 4-chord type II (structure) 0003. S-44-391 (532.6020) | EACH | 1 | $61,756 | $61,756 | $61,756 | $61,753 | $61,756 |
| 194 | Truss cantilever 4-chord type II (structure) 0004. S-44-392 (532.6020) | EACH | 1 | $61,162 | $61,162 | $61,162 | $61,159 | $61,162 |
| 195 | Truss cantilever 4-chord type II (structure) 0005. S-44-394 (532.6020) | EACH | 1 | $61,184 | $61,184 | $61,184 | $61,181 | $61,184 |
| 196 | Truss cantilever 4-chord type II (structure) 0006. S-44-395 (532.6020) | EACH | 1 | $62,251 | $62,251 | $62,251 | $62,248 | $62,251 |
| 197 | Truss full span 4-chord type II (structure) 0001. S-44-404 (532.6120) | EACH | 1 | $128,592 | $128,592 | $128,592 | $128,586 | $128,592 |
| 198 | Noise barriers double-sided sound absorptive (structure) 0001. N-44- 18 (541.0300.S) | SF | 73,639 | $88.00 | $88.00 | $88.70 | $88.50 | $88.00 |
| 199 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 19,030 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 200 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 2,869 | $60.00 | $34.47 | $67.00 | $34.47 | $44.45 |
| 201 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,045 | $60.00 | $35.86 | $69.00 | $35.86 | $26.75 |
| 202 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 708 | $65.00 | $53.27 | $73.00 | $53.27 | $48.25 |
| 203 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 92 | $70.00 | $135.38 | $93.00 | $135.37 | $85.00 |
| 204 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 63 | $70.00 | $127.24 | $93.00 | $127.23 | $85.00 |
| 205 | Concrete curb pedestrian (601.0600) | LF | 130 | $70.00 | $115.99 | $93.00 | $115.98 | $55.00 |
| 206 | Concrete sidewalk 4-inch (602.0405) | SF | 25,800 | $8.90 | $7.05 | $7.95 | $7.05 | $8.00 |
| 207 | Curb ramp detectable warning field yellow (602.0505) | SF | 40 | $200.00 | $58.84 | $75.00 | $58.84 | $36.00 |
| 208 | Curb ramp detectable warning field natural patina (602.0515) | SF | 120 | $300.00 | $56.10 | $75.00 | $56.10 | $35.00 |
| 209 | Concrete surface drains (602.3010) | CY | 5 | $1,000.00 | $1,334.24 | $2,500.00 | $1,334.17 | $1,500.00 |
| 210 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 109,193 | $1.02 | $1.05 | $1.05 | $1.05 | $1.05 |
| 211 | Concrete barrier type S42A (603.1242) | LF | 512 | $300.00 | $294.94 | $239.68 | $294.92 | $510.00 |
| 212 | Concrete barrier temporary precast delivered (603.8000) | LF | 174,935 | $8.43 | $10.73 | $10.73 | $10.73 | $10.73 |
| 213 | Concrete barrier temporary precast installed (603.8125) | LF | 302,985 | $4.00 | $4.38 | $4.38 | $4.38 | $4.38 |
| 214 | Anchoring concrete barrier temporary precast (603.8500) | LF | 19,080 | $7.00 | $8.67 | $8.67 | $8.67 | $8.67 |
| 215 | Anchoring concrete barrier temporary precast on bridge decks (603.8505) | LF | 238 | $20.00 | $19.84 | $19.84 | $19.84 | $19.84 |
| 216 | Slope paving concrete (604.0400) | SY | 2,273 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 217 | Slope paving select crushed material (604.0600) | SY | 335 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 218 | Riprap light (606.0100) | CY | 3,312 | $125.00 | $125.00 | $89.00 | $134.99 | $102.00 |
| 219 | Riprap medium (606.0200) | CY | 1,129 | $190.00 | $190.00 | $90.00 | $169.99 | $142.50 |
| 220 | Riprap heavy (606.0300) | CY | 137 | $125.00 | $125.00 | $75.00 | $80.00 | $110.00 |
| 221 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 1,294 | $109.23 | $109.23 | $82.50 | $91.55 | $91.55 |
| 222 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 3,524 | $175.60 | $175.60 | $80.75 | $88.49 | $88.49 |
| 223 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 1,333 | $126.92 | $126.92 | $84.00 | $95.25 | $95.25 |
| 224 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 3,054 | $158.63 | $158.63 | $105.00 | $110.36 | $110.36 |
| 225 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 266 | $203.19 | $203.19 | $123.00 | $144.29 | $144.30 |
| 226 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 564 | $209.10 | $209.10 | $229.50 | $176.44 | $176.45 |
| 227 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 746 | $149.70 | $149.70 | $80.00 | $91.55 | $91.55 |
| 228 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 3,320 | $100.38 | $100.38 | $81.00 | $88.49 | $88.49 |
| 229 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 1,717 | $114.58 | $114.58 | $83.00 | $95.26 | $95.25 |
| 230 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 2,918 | $134.86 | $134.86 | $103.00 | $119.06 | $119.07 |
| 231 | Storm sewer pipe reinforced concrete class IV 27-inch (608.0427) | LF | 637 | $149.53 | $149.53 | $126.00 | $142.06 | $142.07 |
| 232 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 68 | $207.89 | $207.89 | $140.00 | $166.59 | $166.60 |
| 233 | Storm sewer pipe reinforced concrete class V 12-inch (608.0512) | LF | 116 | $125.95 | $125.95 | $76.00 | $91.55 | $91.55 |
| 234 | Storm sewer pipe reinforced concrete class V 15-inch (608.0515) | LF | 11 | $177.23 | $177.23 | $82.00 | $115.74 | $115.75 |
| 235 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (608.2338) | LF | 119 | $377.27 | $377.27 | $249.00 | $273.83 | $273.84 |
| 236 | Manhole covers type J (611.0530) | EACH | 3 | $860.50 | $860.50 | $556.00 | $566.97 | $567.00 |
| 237 | Manhole covers type J-special (611.0535) | EACH | 3 | $885.67 | $886.00 | $568.50 | $583.97 | $584.00 |
| 238 | Inlet covers type B (611.0606) | EACH | 2 | $1,208.86 | $1,210.00 | $851.50 | $828.96 | $829.00 |
| 239 | Inlet covers type C (611.0612) | EACH | 4 | $892.29 | $892.00 | $573.00 | $587.97 | $588.00 |
| 240 | Inlet covers type DW (611.0613) | EACH | 4 | $1,287.98 | $1,288.00 | $823.00 | $803.96 | $804.00 |
| 241 | Inlet covers type H (611.0624) | EACH | 3 | $1,273.40 | $1,273.00 | $807.00 | $789.96 | $790.00 |
| 242 | Inlet covers type H-S (611.0639) | EACH | 4 | $1,273.40 | $1,273.00 | $807.00 | $789.96 | $790.00 |
| 243 | Inlet covers type MS (611.0642) | EACH | 8 | $565.62 | $565.00 | $560.00 | $576.97 | $577.00 |
| 244 | Inlet covers type VV-B (611.0656) | EACH | 295 | $2,402.99 | $2,403.00 | $1,783.50 | $1,585.92 | $1,586.00 |
| 245 | Manholes 3-FT diameter (611.2003) | EACH | 3 | $1,955.20 | $1,955.00 | $2,632.00 | $3,642.82 | $3,643.00 |
| 246 | Manholes 5-FT diameter (611.2005) | EACH | 288 | $4,214.48 | $4,214.48 | $4,675.00 | $5,768.62 | $5,768.91 |
| 247 | Manholes 6-FT diameter (611.2006) | EACH | 4 | $5,957.05 | $5,957.00 | $6,096.00 | $6,889.90 | $6,890.25 |
| 248 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $15,197 | $15,197 | $14,177 | $15,309 | $15,310 |
| 249 | Inlets 3-FT diameter (611.3003) | EACH | 32 | $1,662.06 | $1,662.06 | $2,427.00 | $3,367.59 | $3,367.75 |
| 250 | Inlets 4-FT diameter (611.3004) | EACH | 3 | $2,621.14 | $2,621.14 | $3,087.00 | $4,277.29 | $4,277.50 |
| 251 | Inlets 2X2-FT (611.3220) | EACH | 2 | $1,712.16 | $1,712.16 | $2,230.00 | $2,594.88 | $2,595.00 |
| 252 | Inlets 2X3-FT (611.3230) | EACH | 9 | $1,544.22 | $1,544.22 | $2,220.00 | $2,868.17 | $2,868.31 |
| 253 | Inlets 2X3.5-FT (611.3260) | EACH | 7 | $1,938.04 | $1,938.00 | $2,897.00 | $5,566.11 | $5,566.39 |
| 254 | Inlets median 1 grate (611.3901) | EACH | 2 | $2,355.61 | $2,355.61 | $2,338.00 | $3,451.71 | $3,451.88 |
| 255 | Inlets median 2 grate (611.3902) | EACH | 4 | $3,067.25 | $3,067.25 | $2,744.00 | $4,595.77 | $4,596.00 |
| 256 | Adjusting inlet covers (611.8115) | EACH | 1 | $671.79 | $672.00 | $736.00 | $858.71 | $858.75 |
| 257 | Cover plates temporary (611.8120.S) | EACH | 12 | $300.00 | $300.00 | $390.00 | $395.64 | $395.66 |
| 258 | Salvaged inlet covers (611.9710) | EACH | 6 | $822.12 | $822.12 | $450.00 | $118.07 | $118.08 |
| 259 | Drain slotted vane (611.9900.S) | EACH | 7 | $48,093 | $48,093 | $10,500 | $40,407 | $40,409 |
| 260 | Pipe underdrain 6-inch (612.0106) | LF | 110 | $16.00 | $16.00 | $16.00 | $26.33 | $26.33 |
| 261 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 685 | $25.00 | $25.00 | $16.00 | $24.90 | $24.90 |
| 262 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 1,877 | $14.00 | $13.60 | $16.00 | $27.43 | $5.25 |
| 263 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 9 | $325.00 | $325.00 | $350.00 | $525.53 | $525.56 |
| 264 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 8 | $250.00 | $250.00 | $250.00 | $249.99 | $250.00 |
| 265 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 5,088 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 266 | Crash cushions temporary (614.0905) | EACH | 61 | $4,125.00 | $5,375.00 | $4,125.00 | $4,624.77 | $5,375.00 |
| 267 | MGS guardrail 3 (614.2300) | LF | 10,596 | $28.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 268 | MGS guardrail 3 K (614.2330) | LF | 100 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 269 | MGS guardrail 3 L (614.2340) | LF | 902 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| 270 | MGS thrie beam transition (614.2500) | LF | 252.60 | $92.00 | $92.00 | $92.00 | $92.00 | $92.00 |
| 271 | MGS guardrail terminal eat (614.2610) | EACH | 25 | $4,900.00 | $4,900.00 | $4,900.00 | $4,899.76 | $4,900.00 |
| 272 | MGS guardrail terminal type 2 (614.2620) | EACH | 19 | $3,400.00 | $3,400.00 | $3,400.00 | $3,399.83 | $3,400.00 |
| 273 | Fence chain link 6-FT (616.0206) | LF | 56,420 | $25.25 | $25.25 | $25.50 | $25.25 | $25.25 |
| 274 | Fence safety (616.0700.S) | LF | 1,350 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 275 | Maintenance and repair of haul roads (project) 0001. 1130-66-71 (618.0100) | EACH | 1 | $1.00 | $1,000.00 | $1.00 | $0.01 | $0.01 |
| 276 | Maintenance and repair of haul roads (project) 0002. 1130-66-72 (618.0100) | EACH | 1 | $1.00 | $1,000.00 | $1.00 | $0.01 | $0.01 |
| 277 | Maintenance and repair of haul roads (project) 0003. 1130-66-77 (618.0100) | EACH | 1 | $1.00 | $1,000.00 | $1.00 | $0.01 | $0.01 |
| 278 | Maintenance and repair of haul roads (project) 0004. 1130-66-84 (618.0100) | EACH | 1 | $1.00 | $1,000.00 | $1.00 | $0.01 | $0.01 |
| 279 | Mobilization (619.1000) | EACH | 1 | $8,164,000 | $6,911,615 | $18,829,003 | $11,393,923 | $15,100,000 |
| 280 | Concrete median blunt nose (620.0200) | SF | 547 | $20.00 | $14.39 | $18.00 | $14.39 | $15.50 |
| 281 | Concrete median sloped nose (620.0300) | SF | 235 | $20.00 | $14.24 | $17.00 | $14.24 | $15.50 |
| 282 | Water (624.0100) | MGAL | 4,443 | $20.00 | $20.00 | $50.00 | $100.00 | $0.01 |
| 283 | Salvaged topsoil (625.0500) | SY | 507,980 | $2.65 | $2.65 | $1.45 | $0.01 | $0.01 |
| 284 | Mulching (627.0200) | SY | 110,500 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 285 | Silt fence (628.1504) | LF | 13,180 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 286 | Silt fence maintenance (628.1520) | LF | 51,990 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 287 | Silt fence heavy duty (628.1530.S) | LF | 2,960 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 288 | Silt fence heavy duty maintenance (628.1535.S) | LF | 2,960 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 289 | Mobilizations erosion control (628.1905) | EACH | 34 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 290 | Mobilizations emergency erosion control (628.1910) | EACH | 50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 291 | Erosion mat class I type B (628.2004) | SY | 459,200 | $1.12 | $1.12 | $1.12 | $1.12 | $1.12 |
| 292 | Erosion mat urban class I type A (628.2006) | SY | 985 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 293 | Erosion mat urban class I type B (628.2008) | SY | 3,660 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 294 | Erosion mat class II type B (628.2023) | SY | 36,400 | $1.12 | $1.12 | $1.12 | $1.12 | $1.12 |
| 295 | Erosion mat class III type C (628.2037) | SY | 170 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 296 | Erosion mat class III type D (628.2039) | SY | 229 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 297 | Inlet protection type A (628.7005) | EACH | 348 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 298 | Inlet protection type B (628.7010) | EACH | 362 | $100.00 | $100.00 | $100.00 | $99.99 | $100.00 |
| 299 | Inlet protection type C (628.7015) | EACH | 11 | $100.00 | $100.00 | $100.00 | $99.99 | $100.00 |
| 300 | Inlet protection type D (628.7020) | EACH | 120 | $125.00 | $125.00 | $125.00 | $124.99 | $125.00 |
| 301 | Temporary ditch checks (628.7504) | LF | 2,342 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 302 | Culvert pipe checks (628.7555) | EACH | 295 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 303 | Tracking pads (628.7560) | EACH | 31 | $1,650.00 | $1,650.00 | $1,300.00 | $0.01 | $0.01 |
| 304 | Rock bags (628.7570) | EACH | 352 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 305 | Fertilizer type B (629.0210) | CWT | 414.30 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 306 | Seeding mixture no. 30 (630.0130) | LB | 25,003 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 307 | Seeding temporary (630.0200) | LB | 220 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 308 | Seeding borrow pit (630.0300) | LB | 63.90 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 309 | Seed water (630.0500) | MGAL | 25,603.50 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 310 | Delineator posts steel (633.0100) | EACH | 224 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 311 | Delineator reflectors (633.0500) | EACH | 602 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 312 | Delineators barrier wall (633.1000) | EACH | 769 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 313 | Markers culvert end (633.5200) | EACH | 164 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 314 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 22 | $150.00 | $150.00 | $150.00 | $149.99 | $150.00 |
| 315 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 31 | $160.00 | $160.00 | $160.00 | $159.99 | $160.00 |
| 316 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 40 | $170.00 | $170.00 | $170.00 | $169.99 | $170.00 |
| 317 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 31 | $500.00 | $500.00 | $500.00 | $499.97 | $500.00 |
| 318 | Sign supports structural steel HS (635.0200) | LB | 16,400 | $6.75 | $6.75 | $6.75 | $6.75 | $6.75 |
| 319 | Signs type I reflective SH (637.1220) | SF | 4,586.50 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 320 | Signs type II reflective H (637.2210) | SF | 1,310.33 | $28.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 321 | Signs type II reflective F (637.2230) | SF | 160 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 322 | Moving signs type I (638.2101) | EACH | 3 | $2,500.00 | $2,500.00 | $2,500.00 | $2,499.88 | $2,500.00 |
| 323 | Moving signs type II (638.2102) | EACH | 72 | $200.00 | $200.00 | $200.00 | $199.99 | $200.00 |
| 324 | Removing signs type I (638.2601) | EACH | 17 | $475.00 | $475.00 | $475.00 | $474.98 | $475.00 |
| 325 | Removing signs type II (638.2602) | EACH | 149 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 326 | Removing small sign supports (638.3000) | EACH | 185 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 327 | Removing structural steel sign supports (638.3100) | EACH | 24 | $600.00 | $600.00 | $600.00 | $599.97 | $600.00 |
| 328 | Pond liner clay (640.1303.S) | CY | 7,510 | $27.00 | $27.00 | $27.70 | $10.00 | $39.42 |
| 329 | Traffic control drums (643.0300) | DAY | 356,626 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 |
| 330 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 2,042 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 331 | Traffic control barricades type III (643.0420) | DAY | 33,873 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 |
| 332 | Traffic control flexible tubular marker posts (643.0500) | EACH | 1,928 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 333 | Traffic control flexible tubular marker bases (643.0600) | EACH | 1,928 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 334 | Traffic control warning lights type A (643.0705) | DAY | 67,746 | $0.15 | $0.15 | $0.15 | $0.15 | $0.15 |
| 335 | Traffic control warning lights type C (643.0715) | DAY | 47,915 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 |
| 336 | Traffic control connected arrow boards (643.0810) | DAY | 2,337 | $19.50 | $19.50 | $19.50 | $19.50 | $19.50 |
| 337 | Traffic control signs (643.0900) | DAY | 266,968 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 338 | Traffic control covering signs type I (643.0910) | EACH | 71 | $300.00 | $300.00 | $300.00 | $299.98 | $300.00 |
| 339 | Traffic control covering signs type II (643.0920) | EACH | 79 | $110.00 | $110.00 | $110.00 | $109.99 | $110.00 |
| 340 | Traffic control signs fixed message (643.1000) | SF | 1,441.75 | $18.25 | $18.25 | $18.25 | $18.25 | $18.25 |
| 341 | Traffic control signs PCMS (643.1050) | DAY | 105 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 342 | Traffic control signs PCMS with TMC communications (643.1051) | DAY | 447 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 343 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 2,295 | $8.75 | $8.75 | $8.75 | $8.75 | $8.75 |
| 344 | Temporary marking line paint 6- inch (643.3165) | LF | 375,688 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 345 | Temporary marking line epoxy 6- inch (643.3170) | LF | 238,227 | $0.63 | $0.63 | $0.63 | $0.63 | $0.63 |
| 346 | Temporary marking line removable tape 6-inch (643.3180) | LF | 14,560 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 347 | Temporary marking line paint 10- inch (643.3265) | LF | 13,898 | $0.90 | $0.90 | $0.90 | $0.90 | $0.90 |
| 348 | Temporary marking line epoxy 10- inch (643.3270) | LF | 11,730 | $1.80 | $1.80 | $1.80 | $1.80 | $1.80 |
| 349 | Temporary marking arrow epoxy (643.3520) | EACH | 8 | $243.20 | $243.20 | $243.20 | $243.19 | $243.20 |
| 350 | Temporary marking word epoxy (643.3620) | EACH | 3 | $329.00 | $329.00 | $329.00 | $328.98 | $329.00 |
| 351 | Temporary marking raised pavement marker type I (643.3760) | EACH | 1,722 | $7.25 | $7.25 | $7.25 | $7.25 | $7.25 |
| 352 | Temporary marking diagonal epoxy 12-inch (643.3920) | LF | 283 | $14.20 | $14.20 | $14.20 | $14.20 | $14.20 |
| 353 | Temporary marking diagonal removable tape 12-inch (643.3950) | LF | 150 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 354 | Traffic control (643.5000) | EACH | 1 | $1,700,000 | $1,700,000 | $1,700,000 | $1,699,915 | $1,700,000 |
| 355 | Temporary pedestrian surface asphalt (644.1410) | SF | 1,960 | $129.40 | $9.01 | $15.00 | $2.00 | $12.00 |
| 356 | Temporary pedestrian barricade (644.1810) | LF | 2,568 | $10.45 | $10.45 | $10.45 | $10.45 | $10.45 |
| 357 | Temporary audible message devices (644.1900.S) | DAY | 1,832 | $12.15 | $12.15 | $12.15 | $12.15 | $12.15 |
| 358 | Geotextile type C (645.0105) | SY | 1,560 | $2.87 | $2.87 | $5.00 | $4.75 | $4.75 |
| 359 | Geotextile type DF schedule A (645.0111) | SY | 619 | $3.00 | $3.00 | $5.00 | $5.61 | $5.61 |
| 360 | Geotextile type HR (645.0120) | SY | 3,957 | $2.00 | $2.00 | $8.00 | $5.95 | $3.50 |
| 361 | Geotextile type R (645.0130) | SY | 2,802 | $1.50 | $1.50 | $7.00 | $3.00 | $3.50 |
| 362 | Geotextile type sas (645.0140) | SY | 179,750 | $1.25 | $1.25 | $2.50 | $1.00 | $1.15 |
| 363 | Geogrid type SR-2 (645.0145.S) | SY | 92,660 | $1.25 | $1.25 | $3.00 | $1.25 | $1.50 |
| 364 | Marking line epoxy 6-inch (646.2020) | LF | 8,895 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 365 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 153,026 | $1.43 | $1.43 | $1.43 | $1.43 | $1.43 |
| 366 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 71,210 | $7.94 | $7.94 | $7.94 | $7.94 | $7.94 |
| 367 | Marking line epoxy 10-inch (646.4020) | LF | 1,217 | $1.30 | $1.30 | $1.30 | $1.30 | $1.30 |
| 368 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 450 | $3.20 | $3.20 | $3.20 | $3.20 | $3.20 |
| 369 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 14,445 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 |
| 370 | Marking arrow epoxy (646.5020) | EACH | 31 | $246.35 | $246.35 | $246.35 | $246.34 | $246.35 |
| 371 | Marking word epoxy (646.5120) | EACH | 8 | $390.70 | $390.70 | $390.70 | $390.68 | $390.70 |
| 372 | Marking symbol epoxy (646.5220) | EACH | 4 | $232.95 | $232.95 | $232.95 | $232.94 | $232.95 |
| 373 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $2,377.50 | $2,377.50 | $1,000.00 | $2,377.38 | $2,377.50 |
| 374 | Marking aerial enforcement bar epoxy (646.5420) | EACH | 26 | $474.55 | $474.55 | $470.55 | $474.53 | $474.55 |
| 375 | Marking stop line epoxy 12-inch (646.6020) | LF | 57 | $15.25 | $15.25 | $15.25 | $15.25 | $15.25 |
| 376 | Marking stop line epoxy 18-inch (646.6120) | LF | 82 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 377 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 112 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 378 | Marking chevron epoxy 24-inch (646.7220) | LF | 623 | $32.85 | $32.85 | $32.85 | $32.85 | $32.85 |
| 379 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 398 | $13.75 | $13.75 | $13.75 | $13.75 | $13.75 |
| 380 | Marking parking stall epoxy (646.8320) | LF | 2,650 | $4.50 | $4.50 | $4.50 | $4.50 | $4.50 |
| 381 | Marking removal line 6-inch (646.9002) | LF | 85,220 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 382 | Marking removal line water blasting 4-inch (646.9010) | LF | 945 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 |
| 383 | Marking removal line water blasting 6-inch (646.9012) | LF | 21,480 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 |
| 384 | Marking removal line 10-inch (646.9102) | LF | 6,110 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 |
| 385 | Marking removal line water blasting 8-inch (646.9110) | LF | 570 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 386 | Marking removal special marking water blasting (646.9310) | EACH | 5 | $495.00 | $495.00 | $495.00 | $494.97 | $495.00 |
| 387 | Conduit rigid metallic 2-inch (652.0125) | LF | 72 | $475.00 | $475.00 | $475.00 | $474.98 | $475.00 |
| 388 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 45,878 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 389 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 4,086 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 390 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 80 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 391 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 1,299 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 392 | Conduit special 3-inch (652.0615) | LF | 1,244 | $42.00 | $42.00 | $42.00 | $42.00 | $42.00 |
| 393 | Install conduit into existing item (652.0700.S) | EACH | 21 | $375.00 | $375.00 | $375.00 | $374.98 | $375.00 |
| 394 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 4 | $3,500.00 | $3,500.00 | $3,500.00 | $3,499.83 | $3,500.00 |
| 395 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 72 | $3,575.00 | $3,575.00 | $3,575.00 | $3,574.82 | $3,575.00 |
| 396 | Junction boxes 18X12X6-inch (653.0222) | EACH | 2 | $2,950.00 | $2,950.00 | $2,950.00 | $2,949.86 | $2,950.00 |
| 397 | Removing pull boxes (653.0905) | EACH | 26 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 398 | Concrete bases type 1 (654.0101) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,499.92 | $1,500.00 |
| 399 | Concrete bases type 5 (654.0105) | EACH | 28 | $1,575.00 | $1,575.00 | $1,575.00 | $1,574.92 | $1,575.00 |
| 400 | Concrete bases type 7 (654.0107) | EACH | 26 | $1,750.00 | $1,750.00 | $1,750.00 | $1,749.91 | $1,750.00 |
| 401 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $2,400.00 | $2,400.00 | $2,400.00 | $2,399.89 | $2,400.00 |
| 402 | Electrical wire lighting 12 AWG (655.0610) | LF | 80,863 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 403 | Electrical wire lighting 10 AWG (655.0615) | LF | 16,609 | $1.40 | $1.40 | $1.40 | $1.40 | $1.40 |
| 404 | Electrical wire lighting 6 AWG (655.0625) | LF | 1,828 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 405 | Electrical wire lighting 4 AWG (655.0630) | LF | 63,410 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 406 | Electrical wire lighting 2 AWG (655.0635) | LF | 132 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 407 | Electrical service meter breaker pedestal (location) 0001. MB7-2 (656.0201) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $1,999.90 | $2,000.00 |
| 408 | Electrical service meter breaker pedestal (location) 0002. MD7-1 (656.0201) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $1,999.90 | $2,000.00 |
| 409 | Electrical service breaker disconnect box (location) 0001. CB7-2 (656.0501) | EACH | 1 | $900.00 | $900.00 | $900.00 | $899.95 | $900.00 |
| 410 | Electrical service breaker disconnect box (location) 0002. CB7-3 (656.0501) | EACH | 1 | $900.00 | $900.00 | $900.00 | $899.95 | $900.00 |
| 411 | Electrical service breaker disconnect box (location) 0003. CB8-1 (656.0501) | EACH | 1 | $900.00 | $900.00 | $900.00 | $899.95 | $900.00 |
| 412 | Pedestal bases (657.0100) | EACH | 1 | $340.00 | $340.00 | $340.00 | $339.98 | $340.00 |
| 413 | Transformer bases breakaway 15- 17 inch bolt circle (657.0210) | EACH | 32 | $796.00 | $796.00 | $796.00 | $795.96 | $796.00 |
| 414 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 35 | $695.00 | $695.00 | $695.00 | $694.96 | $695.00 |
| 415 | Poles type 5-aluminum (657.0322) | EACH | 35 | $1,950.00 | $1,950.00 | $1,950.00 | $1,949.90 | $1,950.00 |
| 416 | Poles type 17-aluminum (657.0337) | EACH | 32 | $7,374.00 | $7,374.00 | $7,374.00 | $7,373.64 | $7,374.00 |
| 417 | Luminaire arms single member 4 1/2-inch clamp 4-FT (657.0605) | EACH | 3 | $360.00 | $360.00 | $360.00 | $359.98 | $360.00 |
| 418 | Luminaire arms single member 6- inch clamp 4-FT (657.0620) | EACH | 32 | $385.00 | $385.00 | $385.00 | $384.98 | $385.00 |
| 419 | Luminaire arms single member 6- inch clamp 15-FT (657.0640) | EACH | 4 | $880.00 | $880.00 | $880.00 | $879.95 | $880.00 |
| 420 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 29 | $825.00 | $825.00 | $825.00 | $824.96 | $825.00 |
| 421 | Underdeck lighting (structure) 0001. B-44-334 (659.0601) | EACH | 1 | $12,000 | $12,000 | $12,000 | $11,999 | $12,000 |
| 422 | Underdeck lighting (structure) 0002. B-44-335 (659.0601) | EACH | 1 | $12,500 | $12,500 | $12,500 | $12,499 | $12,500 |
| 423 | Underdeck lighting (structure) 0003. B-44-336 (659.0601) | EACH | 1 | $9,450.00 | $9,450.00 | $9,450.00 | $9,449.53 | $9,450.00 |
| 424 | Underdeck lighting (structure) 0004. B-44-337 (659.0601) | EACH | 1 | $9,450.00 | $9,450.00 | $9,450.00 | $9,449.53 | $9,450.00 |
| 425 | Luminaires utility LED B (659.1120) | EACH | 46 | $400.00 | $400.00 | $400.00 | $399.98 | $400.00 |
| 426 | Luminaires utility LED C (659.1125) | EACH | 32 | $430.00 | $430.00 | $430.00 | $429.98 | $430.00 |
| 427 | Luminaires underdeck LED B (659.1210) | EACH | 6 | $775.00 | $775.00 | $775.00 | $774.96 | $775.00 |
| 428 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 27 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 429 | Field system integrator (670.0101) | EACH | 1 | $50,075 | $50,075 | $50,075 | $50,073 | $50,075 |
| 430 | ITS documentation (670.0201) | EACH | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $7,999.61 | $8,000.00 |
| 431 | Conduit HDPE 3-duct 2-inch (671.0132) | LF | 24,019 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 432 | Conduit HDPE directional bore 3- duct 2-inch (671.0232) | LF | 4,449 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| 433 | Fiber optic cable marker (671.0300) | EACH | 104 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 434 | Communication vault type 1 (673.0105) | EACH | 14 | $2,450.00 | $2,450.00 | $2,450.00 | $2,449.87 | $2,450.00 |
| 435 | Communication vault type round (673.0110) | EACH | 5 | $4,275.00 | $4,275.00 | $4,275.00 | $4,274.79 | $4,275.00 |
| 436 | Tracer wire marker posts (673.0200) | EACH | 38 | $150.00 | $150.00 | $150.00 | $149.99 | $150.00 |
| 437 | Install pole mounted cabinet (673.1225.S) | EACH | 15 | $2,875.00 | $2,875.00 | $2,875.00 | $2,874.86 | $2,875.00 |
| 438 | Cable microwave detector (674.0200) | LF | 14,901 | $4.20 | $4.20 | $4.20 | $4.20 | $4.20 |
| 439 | Remove cable (674.0300) | LF | 29,404 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 440 | Install mounted controller microwave detector assembly (675.0300) | EACH | 13 | $3,400.00 | $3,400.00 | $3,400.00 | $3,399.83 | $3,400.00 |
| 441 | Install camera pole 50-FT (677.0150) | EACH | 2 | $4,325.00 | $4,325.00 | $4,325.00 | $4,324.79 | $4,325.00 |
| 442 | Install camera assembly (677.0200) | EACH | 2 | $2,705.00 | $2,705.00 | $2,705.00 | $2,704.87 | $2,705.00 |
| 443 | Removing 50-FT camera pole (677.9051.S) | EACH | 1 | $2,870.00 | $2,870.00 | $2,870.00 | $2,869.86 | $2,870.00 |
| 444 | Install fiber optic cable outdoor plant 12-CT (678.0012) | LF | 5,335 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 445 | Install fiber optic cable outdoor plant 72-CT (678.0072) | LF | 31,180 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 446 | Install overhead freeway DMS full matrix (678.0100.S) | EACH | 1 | $124,750 | $124,750 | $124,750 | $124,744 | $124,750 |
| 447 | Fiber optic splice enclosure (678.0200) | EACH | 8 | $1,500.00 | $1,500.00 | $1,500.00 | $1,499.92 | $1,500.00 |
| 448 | Fiber optic splice (678.0300) | EACH | 384 | $100.00 | $100.00 | $100.00 | $99.99 | $100.00 |
| 449 | Fiber optic termination (678.0400) | EACH | 28 | $300.00 | $300.00 | $300.00 | $299.98 | $300.00 |
| 450 | Communication system testing (678.0501) | EACH | 2 | $4,200.00 | $4,200.00 | $4,200.00 | $4,199.79 | $4,200.00 |
| 451 | Install ethernet switches (678.0600) | EACH | 5 | $1,000.00 | $1,000.00 | $1,000.00 | $999.95 | $1,000.00 |
| 452 | Install wireless antennas (678.0700) | EACH | 3 | $3,100.00 | $3,100.00 | $3,100.00 | $3,099.85 | $3,100.00 |
| 453 | Sawing asphalt (690.0150) | LF | 74,593 | $1.39 | $1.55 | $0.95 | $1.39 | $1.39 |
| 454 | Sawing concrete (690.0250) | LF | 11,750 | $2.75 | $2.05 | $2.25 | $2.75 | $2.75 |
| 455 | Incentive strength concrete structures (715.0502) | DOL | 29,298 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 456 | Incentive strength concrete barrier (715.0603) | DOL | 35,101 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 457 | Incentive flexural strength concrete pavement (715.0715) | DOL | 117,141 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 458 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 459 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 5,760 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 460 | Special 0100. roadway embankment (SPV.0035) | CY | 174,626 | $0.01 | $0.01 | $0.01 | $25.00 | $0.01 |
| 461 | Special 0800. HPC masonry structures (SPV.0035) | CY | 2,529 | $725.00 | $725.00 | $725.00 | $724.96 | $725.00 |
| 462 | Special 0100. incentive iri ride PCC surfaces (SPV.0055) | DOL | 162,492 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 463 | Special 0041. temporary bridge widening B-44-41 (SPV.0060) | EACH | 1 | $850,000 | $850,000 | $850,000 | $849,958 | $850,000 |
| 464 | Special 0043. temporary bridge widening B-44-43 (SPV.0060) | EACH | 1 | $850,000 | $850,000 | $850,000 | $849,958 | $850,000 |
| 465 | Special 0100. construction staking survey project 1130-66-71 (SPV.0060) | EACH | 1 | $275,000 | $269,057 | $269,100 | $269,044 | $295,120 |
| 466 | Special 0101. construction staking survey project 1130-66-72 (SPV.0060) | EACH | 1 | $400,000 | $370,636 | $370,650 | $370,617 | $441,364 |
| 467 | Special 0102. construction staking survey project 1130-66-77 (SPV.0060) | EACH | 1 | $15,000 | $19,742 | $19,750 | $19,741 | $19,742 |
| 468 | Special 0103. construction staking survey project 1130-66-84 (SPV.0060) | EACH | 1 | $10,000 | $8,731.65 | $8,900.00 | $8,731.22 | $8,731.65 |
| 469 | Special 0105. baseline CPM progress schedule (SPV.0060) | EACH | 4 | $1,000.00 | $5,000.00 | $2,500.00 | $0.01 | $5,000.00 |
| 470 | Special 0106. adjusting sanitary manhole covers (SPV.0060) | EACH | 6 | $825.79 | $825.79 | $1,100.00 | $974.95 | $975.00 |
| 471 | Special 0110. CPM progress schedule and accepted revisions (SPV.0060) | EACH | 132 | $1.00 | $1,000.00 | $250.00 | $0.01 | $100.00 |
| 472 | Special 0155. temporary water diversion C-44-148 (SPV.0060) | EACH | 1 | $147,124 | $147,124 | $150,000 | $18,279 | $18,280 |
| 473 | Special 0201. STH 55 ramp A pond outlet storm sewer structure (SPV.0060) | EACH | 1 | $8,847.21 | $8,847.00 | $9,032.00 | $11,025 | $11,026 |
| 474 | Special 0202. CTH J ramp D pond outlet storm sewer structure (SPV.0060) | EACH | 1 | $10,352 | $10,352 | $9,032.00 | $10,749 | $10,750 |
| 475 | Special 0203. 66-1218-RT pond outlet storm sewer structure (SPV.0060) | EACH | 1 | $15,427 | $15,427 | $11,580 | $14,561 | $14,562 |
| 476 | Special 0204. pond in-situ clay liner, STH 55 ramp A (SPV.0060) | EACH | 1 | $59,475 | $59,475 | $25,000 | $4,999.75 | $0.01 |
| 477 | Special 0211. storm sewer tap (SPV.0060) | EACH | 1 | $2,010.29 | $2,010.29 | $964.00 | $999.34 | $999.39 |
| 478 | Special 0230. median inlet cover type Y (SPV.0060) | EACH | 32 | $982.37 | $982.37 | $652.00 | $657.00 | $657.03 |
| 479 | Special 0295. inlet marker (SPV.0060) | EACH | 295 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 480 | Special 0296. installing inlet covers (SPV.0060) | EACH | 14 | $836.32 | $836.32 | $650.00 | $740.50 | $740.54 |
| 481 | Special 0297. removing cover plates (SPV.0060) | EACH | 14 | $258.00 | $258.00 | $250.00 | $404.84 | $404.86 |
| 482 | Special 0305. emergency response to traffic involving concrete barrier temporary (SPV.0060) | EACH | 82 | $0.01 | $325.00 | $1,325.00 | $1,174.94 | $2,000.00 |
| 483 | Special 0310. emergency response to traffic involving crash cushion temporary (SPV.0060) | EACH | 77 | $550.00 | $550.00 | $550.00 | $1,399.93 | $550.00 |
| 484 | Special 0320. temporary concrete barrier gate, 24-FT (SPV.0060) | EACH | 1 | $12,225 | $12,225 | $12,500 | $12,224 | $12,225 |
| 485 | Special 0400. fixed message sign portable support (SPV.0060) | EACH | 27 | $900.00 | $900.00 | $900.00 | $899.95 | $900.00 |
| 486 | Special 0501. concrete bases type 7 tall (SPV.0060) | EACH | 114 | $3,475.00 | $3,475.00 | $3,475.00 | $3,474.83 | $3,475.00 |
| 487 | Special 0502. transport and install state furnished 277/480 lighting control cabinet (SPV.0060) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,499.88 | $2,500.00 |
| 488 | Special 0503. anchor bolt cover shroud (SPV.0060) | EACH | 108 | $525.00 | $525.00 | $525.00 | $524.97 | $525.00 |
| 489 | Special 0504. lighting control cabinets 277/480 30-inch 3-phase (SPV.0060) | EACH | 1 | $17,500 | $17,500 | $17,500 | $17,499 | $17,500 |
| 490 | Special 0505. electrical service main lugs only meter pedestal 3- phase 600V (SPV.0060) | EACH | 1 | $2,850.00 | $2,850.00 | $2,850.00 | $2,849.86 | $2,850.00 |
| 491 | Special 0506. concrete transformer pad (SPV.0060) | EACH | 2 | $4,850.00 | $4,850.00 | $4,850.00 | $4,849.76 | $4,850.00 |
| 492 | Special 0507. temporary street lighting system (SPV.0060) | EACH | 2 | $55,000 | $55,000 | $55,000 | $54,997 | $55,000 |
| 493 | Special 0508. temporary wood poles 40-foot (SPV.0060) | EACH | 4 | $4,800.00 | $4,800.00 | $4,800.00 | $4,799.76 | $4,800.00 |
| 494 | Special 0509. concrete bases type 5 tall (SPV.0060) | EACH | 4 | $2,475.00 | $2,475.00 | $2,475.00 | $2,474.88 | $2,475.00 |
| 495 | Special 0510. transport and install state furnished main lugs only meter pedestal (SPV.0060) | EACH | 1 | $1,100.00 | $1,100.00 | $1,100.00 | $1,099.94 | $1,100.00 |
| 496 | Special 0511. concrete control cabinet bases type 10 NE region special (SPV.0060) | EACH | 1 | $2,400.00 | $2,400.00 | $2,400.00 | $2,399.89 | $2,400.00 |
| 497 | Special 0512. electrical service meter breaker pedestal special (SPV.0060) | EACH | 1 | $6,200.00 | $6,200.00 | $6,200.00 | $6,199.69 | $6,200.00 |
| 498 | Special 0701. removing ground mount dynamic message sign (SPV.0060) | EACH | 1 | $4,750.00 | $4,750.00 | $4,750.00 | $4,749.76 | $4,750.00 |
| 499 | Special 0702. install ethernet extender (SPV.0060) | EACH | 24 | $475.00 | $475.00 | $475.00 | $474.98 | $475.00 |
| 500 | Special 0703. remove poles wood (SPV.0060) | EACH | 1 | $750.00 | $750.00 | $750.00 | $749.96 | $750.00 |
| 501 | Special 0704. remove and reinstall ITS equipment (SPV.0060) | EACH | 1 | $13,750 | $13,750 | $13,750 | $13,749 | $13,750 |
| 502 | Special 0705. wood pole, 50-FT (SPV.0060) | EACH | 1 | $5,500.00 | $5,500.00 | $5,500.00 | $5,499.72 | $5,500.00 |
| 503 | Special 0706. traffic signal standards aluminum 6-FT (SPV.0060) | EACH | 1 | $550.00 | $550.00 | $550.00 | $549.97 | $550.00 |
| 504 | Special 0707. salvaging wireless antennas (SPV.0060) | EACH | 4 | $2,220.00 | $2,220.00 | $2,220.00 | $2,219.88 | $2,220.00 |
| 505 | Special 0708. adjusting communication vaults (SPV.0060) | EACH | 1 | $4,875.00 | $4,875.00 | $4,875.00 | $4,874.76 | $4,875.00 |
| 506 | Special 0100. street sweeping (SPV.0075) | HRS | 2,194 | $0.01 | $133.00 | $25.00 | $299.98 | $0.01 |
| 507 | Special 0105. animal carcass removal (SPV.0075) | HRS | 542 | $0.01 | $250.00 | $1.00 | $349.98 | $550.00 |
| 508 | Special 0106. roadway debris removal (SPV.0075) | HRS | 542 | $0.01 | $250.00 | $1.00 | $349.98 | $550.00 |
| 509 | Special 0001. SSPRC horizontal elliptical class HE-IV 38X60-inch (SPV.0090) | LF | 165 | $427.45 | $427.45 | $301.00 | $340.30 | $340.32 |
| 510 | Special 0002. pipe underdrain (6- inch) with geotextile fabric and aggregate (SPV.0090) | LF | 5,865 | $14.50 | $14.50 | $17.00 | $25.00 | $25.00 |
| 511 | Special 0003. concrete curb and gutter 4-inch sloped 36-inch type R (SPV.0090) | LF | 240 | $100.00 | $52.01 | $66.00 | $52.01 | $62.00 |
| 512 | Special 0100. HMA longitudinal joint repair (SPV.0090) | LF | 56,580 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 513 | Special 0115. concrete barrier type S42 special (SPV.0090) | LF | 7,856 | $79.00 | $92.14 | $107.49 | $92.14 | $80.78 |
| 514 | Special 0120. concrete barrier type S56 special (SPV.0090) | LF | 63,430 | $90.00 | $101.52 | $111.89 | $101.52 | $82.64 |
| 515 | Special 0305. glare screens temporary (SPV.0090) | LF | 6,855 | $7.50 | $7.50 | $7.50 | $7.50 | $7.50 |
| 516 | Special 0501. temporary overhead cable triplex 6 AWG (SPV.0090) | LF | 576 | $7.50 | $7.50 | $7.50 | $7.50 | $7.50 |
| 517 | Special 0800. removing existing timber piling (SPV.0090) | LF | 1,050 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 518 | Special 0800. longitudinal grooving bridge deck (SPV.0165) | SF | 49,310 | $0.91 | $0.82 | $1.50 | $0.77 | $0.77 |
| 519 | Special 0100. concrete pavement 10 1/2-inch special (SPV.0180) | SY | 378,741 | $62.31 | $68.17 | $63.23 | $68.17 | $66.36 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.