DC Clean Rivers Project
- Location
- Washington, DC, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of April 2024 (DC Water).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | DC Water | |
| Category | Water | |
| Tunnel length | 5.5 mi | DC Water |
| Amount | US$2.99 billion (US dollars), as of April 2024 | DC Water |
| What the amount covers | Programme value. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$2.99 bn | Programme value | Programme | Apr 2024 | DC Water |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Traylor Bros., Inc. | design-build contractor | Blue Plains Tunnel (24,000-foot, 26-foot-diameter CSO tunnel; completed) | Traylor Bros., Inc. |
About the project
DC Water's 25-year combined sewer overflow control program (2005 to 2030) of deep storage tunnels and green infrastructure for the Anacostia and Potomac rivers and Rock Creek, cutting overflows by 96 percent. The Potomac River Tunnel, about 5.5 miles of 18-foot finished tunnel from Georgetown to a connection at Joint Base Anacostia-Bolling, conveying flows to the Blue Plains plant, with five large and three drop or vent shafts, is the next major phase, with construction from 2024 to the 2030 consent decree deadline.
Sources
- Clean Rivers Project - Potomac River Tunnel, briefing to the Washington Area Bicyclist Association, DC Water, 10 Apr 2024. Slide 5 'Clean Rivers Project': 'DC Clean Rivers Project: $2.99 Billion', 'Nitrogen Removal: $950 Million', 'Total > $ 3.4 Billion', '25 yr implementation (2005 - 2030)', '96% reduction in CSOs'; slide 11 'Potomac River Tunnel': 'Approx 5.5 miles of 18' ID finished tunnel', '7 shafts', 'NTP: Nov 2023', 'Construction Start: 2024', 'Consent Decree Deadline: 2030'; cover 'April 10, 2024' (PDF read locally with pymupdf from the file WebFetch downloaded from this URL on 2026-11-13; WebFetch's summariser could not read it). Consulted 13 Nov 2026.
- Blue Plains Tunnel (project page), Traylor Bros., Inc.. 'Owner: District of Columbia Water and Sewer Authority [...] The Blue Plains Tunnel project was the design-build of a 24,000-foot-long, 26-foot-diameter CSO tunnel constructed in soft ground under and adjacent to the Potomac and Anacostia Rivers.'. Consulted 18 Nov 2026.
- DC Clean Rivers Project, DC Water. 'The Anacostia River and Potomac River tunnel systems include more than 18 miles of tunnels'. Consulted 19 Nov 2026.
- Potomac River Tunnel Fact Sheet, DC Water, 21 Nov 2024. 'The Potomac River Tunnel is the next major phase of the DC Clean Rivers Project. ... Construction of 5 large shafts and 3 drop/vent shafts'. Consulted 19 Nov 2026.