Long Bridge Project

Location
Arlington, VA / DC, United States. Location shown at city level. See it on the map
Stage
Under construction, as of November 19, 2026 (Virginia Passenger Rail Authority).
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorVirginia Passenger Rail Authority (VPRA)
CategoryBridges
Route length1.8 miVirginia Passenger Rail Authority
AmountUS$2.3 billion (US dollars), as of March 2024Virginia Passenger Rail Authority
What the amount coversCapital estimate.
Threshold evidenceA cited project-scope figure meets the threshold
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$2.3 bnCapital estimateWhole projectMar 2024Virginia Passenger Rail Authority
US$729 MFederal grantWhole projectMar 2024Virginia Passenger Rail Authority
Financial records, each with its kind and scope

Contracts and teams

CompanyRolePackageSource
Skanska/Flatiron Joint Ventureprogressive design-builderLong Bridge-North PackageVirginia Passenger Rail Authority
Long Bridge Rail Partners (Trumbull Corp., Fay, S&B Construction, and Wagman Heavy Civil, Inc.)construction partnerLong Bridge-South PackageVirginia Passenger Rail Authority
Delivery parties, each named by the owner, a government or the company itself

Milestones

DateMilestoneScopeSource
December 2023awardWhole projectVirginia Passenger Rail Authority
January 16, 2025awardWhole projectVirginia Passenger Rail Authority
2030planned completionWhole projectVirginia Passenger Rail Authority
Dated milestones, at the precision of their source

About the project

A new two-track rail bridge over the Potomac River between Arlington and Washington, built between the existing Long Bridge and the WMATA Yellow Line bridge, along a 1.8-mile corridor that also replaces the Ohio Drive SW, Washington Channel and Maine Avenue SW rail bridges with four-track structures. In March 2024 VPRA estimated the cost of the entire project at $2.3 billion; VPRA has been awarded a $729 million Federal-State Partnership grant, which also funds other Phase 2 projects of Transforming Rail in Virginia. Skanska/Flatiron JV is progressive design-builder for the North Package (selected December 2023) and Long Bridge Rail Partners for the South Package (January 2025); the project is under construction, with completion expected in 2030.