Research record, not reviewed

RiverRenew Tunnel System

Location
Alexandria, VA, United States. Location shown at city level. See it on the map
Stage
Stage not confirmed: Not collected yet.
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorAlexRenew
CategoryWater
AmountUS$655 million (US dollars), as of February 3, 2021U.S. Environmental Protection Agency
What the amount coversCost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost.
Threshold evidenceOnly a financed-scope figure meets the threshold; to reconcile
Sourced facts in the research record

Water projects are counted apart and left out of totals while their place in the atlas is decided.

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$655 MCost of the WIFIA-financed scopeScope financed by WIFIA3 Feb 2021U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost.
Financial records, each with its kind and scope

Contracts and teams

CompanyRolePackageSource
Traylor-Shea Joint Venture (Traylor Bros, Inc. and J.F. Shea Co. joint venture)design-builderRiverRenew Tunnel System ProjectVirginia Department of Environmental Quality (transmitting AlexRenew's 2021 General Assembly Report)
Brown and Caldwellowner's advisorRiverRenew program, professional services contract 17-022AlexRenew
Delivery parties, each named by the owner, a government or the company itself

Milestones

DateMilestoneScopeSource
February 3, 2021Financing closedScope financed by WIFIAU.S. Environmental Protection Agency
Dated milestones, at the precision of their source

About the project

System to intercept four combined sewer outfalls and route flows to treatment.

Scope notes

Sources

  • RiverRenew Tunnel System – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
  • WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
  • Alexandria Combined Sewer Overflow Outfall Progress Report (2021), Virginia Department of Environmental Quality (transmitting AlexRenew's 2021 General Assembly Report), 1 Jan 2022. 'AlexRenew awarded the $454.4 million Tunnel System Project to Traylor-Shea Joint Venture (Traylor-Shea) on November 17, 2020. Notice to Proceed with design-build services was subsequently issued on December 1, 2020. [...] The Traylor-Shea design-build team consists of Traylor Bros, Inc. and J.F. Shea Co. a joint venture, with support from Jacobs Engineering and Kokosing Construction Co.'. Consulted 18 Nov 2026.
  • RiverRenew Overview (program dashboard, data as of July 31, 2022), AlexRenew. 'RiverRenew Tunnel Project Contracts: Vendor Role Contract Type Contract No. Contract Date [...] Traylor-Shea Joint Venture Design-Builder Tunnel System Project Design-Build 19-079 Dec 2020 [...] Brown and Caldwell Owner's Advisor Professional Services 17-022 Nov 2017'. Consulted 18 Nov 2026.

See it on the map. How the atlas qualifies a record.