East Side Coastal Resiliency Project
- Location
- Manhattan, NY, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of May 2025 (New York City Department of Design and Construction).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | New York City Department of Design and Construction | |
| Category | Water | |
| Total length | 2.4 mi | New York City Department of Design and Construction |
| Amount | US$1.45 billion (US dollars), as of May 2025 | New York City Department of Design and Construction |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$1.45 bn | Capital estimate | Whole project | May 2025 | New York City Department of Design and Construction |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| September 2024 | other | Whole project | New York City Department of Design and Construction |
| May 26, 2025 | other | Whole project | New York City Department of Design and Construction |
| 2027 | planned completion | Whole project | New York City Department of Design and Construction |
About the project
A 2.4-mile flood barrier of floodwalls, 18 flood gates and a raised East River Park, from Montgomery Street to East 25th Street on Manhattan's Lower East Side, protecting 110,000 New Yorkers. Sections opened from September 2024 and on Memorial Day 2025; the full project and park are projected to be complete in early 2027.
Sources
- Mayor Adams Opens Newly Rebuilt Sections of East River Park (ESCR openings), New York City Department of Design and Construction, 29 May 2025. Body: '$1.45 billion project'; '$2 billion commitment' with BMCR; '2.4-mile-long flood barrier on the Lower East Side from Montgomery Street up to Asser Levy'; '18 swinging or sliding flood gates'; more than 110,000 residents; September 2024 ballfields and Delancey Street Bridge; Memorial Day 2025 sections; projected completion early 2027. Consulted 13 Nov 2026.