Midtown Bus Terminal Replacement
- Location
- Manhattan, New York, NY, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of 2026 (Port Authority of New York and New Jersey).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Port Authority of New York and New Jersey | |
| Category | Urban transit | |
| Amount | US$11 billion (US dollars) | Port Authority of New York and New Jersey |
| What the amount covers | Programme value: 'The total cost of the project is estimated at approximately $11 billion' (Port Authority project page). The programme includes the new main terminal, a separate storage and staging building and direct Lincoln Tunnel ramps. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$11 bn | Programme value | Whole project | Undated | Port Authority of New York and New Jersey'The total cost of the project is estimated at approximately $11 billion' (Port Authority project page). The programme includes the new main terminal, a separate storage and staging building and direct Lincoln Tunnel ramps. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Tutor Perini Corporation | general contractor (guaranteed maximum price) | Phase 1: core and shell of the interim bus terminal / storage and staging facility and the associated ramps (IBT/SSF/Ramps) | Port Authority of New York and New Jersey |
| STV-Turner (joint venture of STV and Turner) | construction manager | Phase 1 of the Midtown Bus Terminal Replacement program (interim terminal and ramp infrastructure) | Turner Construction Company |
| MLJ Contracting | construction contractor | Dyer Avenue deck-overs | Port Authority of New York and New Jersey |
| AECOM Tishman | construction manager | Dyer Avenue deck-overs | Port Authority of New York and New Jersey |
| Foster + Partners Architects and A. Epstein and Sons International, Inc. (joint venture) | designer (design development and construction support) | Midtown Bus Terminal Replacement Program | Port Authority of New York and New Jersey |
| Louis Berger/HNTB Joint Venture | program and project manager | Midtown Bus Terminal Replacement Program | Port Authority of New York and New Jersey |
About the project
The sponsor's programme includes the new main terminal, a separate storage and staging building and direct Lincoln Tunnel ramps.
Scope notes
- The sponsor's programme includes the new main terminal, a separate storage and staging building and direct Lincoln Tunnel ramps. Port Authority of New York and New Jersey
- Sponsor construction or operating announcement for the project. Port Authority of New York and New Jersey
- Build America Bureau project page; it returned HTTP 403 when checked on 2026-11-19, so the US$4bn figure it was cited for is not confirmed. U.S. DOT Build America Bureau
Sources
- Midtown Bus Terminal Replacement, Port Authority of New York and New Jersey. The sponsor's programme includes the new main terminal, a separate storage and staging building and direct Lincoln Tunnel ramps. The Build America Bureau lists a separate US$4bn financed scope.. Consulted 9 Nov 2026.
- Midtown Bus Terminal construction advisory, Port Authority of New York and New Jersey, 2026. Sponsor construction or operating announcement for the project.. Consulted 9 Nov 2026.
- Midtown Bus Terminal financed project, U.S. DOT Build America Bureau, 14 Jan 2025. Separate Build America financing profile for US$4bn scope.. Consulted 9 Nov 2026.
- Board of Commissioners public agenda, June 26, 2025: Midtown Bus Terminal Replacement Program Phase 1 reauthorization and contract award, Port Authority of New York and New Jersey, 26 Jun 2025. 'to award: (1) a contract to Tutor Perini Corporation, pursuant to a publicly advertised procurement process, providing for performance of general construction services for the core and shell of the interim bus terminal/storage and staging facility and all of the work for the associated ramps (collectively, IBT/SSF/Ramps), at a guaranteed maximum price reported to the Board'. Consulted 18 Nov 2026.
- STV-Turner Selected for First Phase of Transformative Midtown Bus Terminal Replacement, Turner Construction Company, 18 May 2026. 'A joint venture of STV and Turner was selected by the Port Authority of New York and New Jersey (PANYNJ) to provide construction management (CM) services for Phase 1 of the Midtown Bus Terminal Replacement (MTBTR) program.'. Consulted 18 Nov 2026.
- Port Authority Board of Commissioners authorizes contracts for Dyer Avenue deck-overs to facilitate construction of a new Midtown Bus Terminal, Port Authority of New York and New Jersey, 25 Jul 2024. 'The contract for construction of the deck-overs will be awarded to MLJ Contracting of Great Neck, N.Y.'. Consulted 18 Nov 2026.
- Midtown Bus Terminal Redevelopment Project page, Port Authority of New York and New Jersey. 'The total cost of the project is estimated at approximately $11 billion, with procurement for the first phase actively in progress.'; 'Construction of the Dyer Avenue deck-overs is currently underway.'; 'The Storage and Staging Facility will create indoor storage for up to 350 buses'. Consulted 19 Nov 2026.