East River Tunnel Rehabilitation Project
- Location
- New York, NY, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of September 2026 (Amtrak).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Amtrak | |
| Category | Tunnels | |
| Amount | US$1.6 billion (US dollars), as of May 2025 | Amtrak |
| What the amount covers | Project value. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$1.6 bn | Project value | Whole project | May 2025 | Amtrak |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
About the project
Full reconstruction of two of the four century-old East River tunnel tubes (Lines 1 and 2) between Penn Station and Queens, damaged by Superstorm Sandy, renewing power, signal, track and structural systems and repairing the tunnel liner. Amtrak describes it as a $1.6 billion investment; the first long-term track outage began in May 2025 and Amtrak reopened the rehabilitated Line 2 on 17 August 2026.
Sources
- Amtrak Letter to Governor Hochul on East River Tunnel Rehab Project, Amtrak, 2 May 2025. Body: '$1.6 billion investment for New York State'; two of the four century-old tubes. Consulted 12 Nov 2026.
- East River Tunnel Rehabilitation Project (Amtrak New Era), Amtrak. Updates: first long-term outage May 2025; bench wall demolition; track installation underway; Line 2 July 2026 target. Consulted 12 Nov 2026.
- East River Tunnel Line 2 is now open, Amtrak, 1 Sep 2026. 'Amtrak officially reopened East River Tunnel Line 2 on August 17 ... a major milestone in the ERT Rehabilitation Project'. Consulted 19 Nov 2026.