Louis-Hippolyte-La Fontaine Tunnel Rehabilitation
- Location
- Montréal / Longueuil, QC, Canada. Location shown at city level. See it on the map
- Stage
- Under construction, as of November 5, 2026 (Gouvernement du Québec).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Ministère des Transports et de la Mobilité durable du Québec | |
| Category | Tunnels | |
| Amount | C$2.497 billion (Canadian dollars), as of March 20, 2023 | Gouvernement du Québec |
| What the amount covers | Capital estimate: Historical revised C$2.497bn estimate published in March 2023. Maintain alongside the updated value. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| C$2.8 bn | Project value | Whole project | Undated | Gouvernement du QuébecC$2.796bn for the rehabilitation project. The existing immersed tunnel is a separate historical asset. |
| C$2.5 bn | Capital estimate | Whole project | 20 Mar 2023 | Gouvernement du QuébecHistorical revised C$2.497bn estimate published in March 2023. Maintain alongside the updated value. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Renouveau La Fontaine (RLF) (Eurovia Infra, Pomerleau inc. et Dodin Campenon Bernard SAS) | entrepreneur, contrat principal de conception, construction et financement (design-build-finance) | Réfection majeure du tunnel Louis-Hippolyte-La Fontaine, contrat principal | Gouvernement du Québec |
About the project
Major rehabilitation of the existing road tunnel beneath the St. Lawrence River. The official page tracks the construction phases.
Scope notes
- C$2.796bn for the rehabilitation project. The existing immersed tunnel is a separate historical asset. Gouvernement du Québec
- Historical revised C$2.497bn estimate published in March 2023. Maintain alongside the updated value. Gouvernement du Québec
Sources
- Réfection du tunnel Louis-Hippolyte-La Fontaine, Gouvernement du Québec. Scope and construction progress. Consulted 9 Nov 2026.
- Louis-Hippolyte-La Fontaine Tunnel Rehabilitation – official project evidence, Gouvernement du Québec, 20 Mar 2023. Historical revised C$2.497bn estimate published in March 2023. Maintain alongside the updated value.. Consulted 9 Nov 2026.
Research leads not yet reviewed: www.renewcanada.net.