Parallel Thimble Shoal Tunnel
- Location
- Chesapeake Bay Bridge–Tunnel, VA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Chesapeake Bay Bridge and Tunnel District | |
| Category | Tunnels | |
| Bored tunnel length | 5,700 ft | Federal Highway Administration, Center for Innovative Finance Support |
| New southbound lanes | 2 | Chesapeake Bay Bridge and Tunnel District |
| Amount | Not collected yet | |
| Threshold evidence | Only a financed-scope figure meets the threshold; to reconcile |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$756 M | Contract value | Whole project | Undated | Federal Highway Administration, Center for Innovative Finance SupportDesign-build cost of the Chesapeake Tunnel Joint Venture contract (FHWA profile: 'Design-build cost - $756 million'); the profile gives the total project cost as $1,074 million. The larger bridge-tunnel system is a different asset. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Chesapeake Tunnel Joint Venture (Dragados USA, Inc. and Schiavone Construction Co. LLC) | design-builder | Parallel Thimble Shoal Tunnel | Federal Highway Administration, Center for Innovative Finance Support |
In review: consortium rows from the research workbook. They are not published attributions until each one is matched to an award notice.
| Company | Consortium | Package | Workbook status |
|---|---|---|---|
| Dragados USA | Chesapeake Tunnel JV | Design-build | To verify |
| Schiavone Construction | Chesapeake Tunnel JV | Design-build | To verify |
About the project
A second, two-lane bored tunnel of the Chesapeake Bay Bridge-Tunnel, from #1 Island under Thimble Shoal Channel to #2 Island. The FHWA project profile gives the new bored tunnel's length and planned southbound use.
Scope notes
- Design-build cost of the Chesapeake Tunnel Joint Venture contract (FHWA profile: 'Design-build cost - $756 million'); the profile gives the total project cost as $1,074 million. The larger bridge-tunnel system is a different asset. Federal Highway Administration, Center for Innovative Finance Support
Sources
- Parallel Thimble Shoal Tunnel Project, U.S. Department of Transportation. Bored tunnel length and planned traffic. Consulted 9 Nov 2026.
- Project Profiles: Parallel Thimble Shoal Tunnel, Federal Highway Administration, Center for Innovative Finance Support. 'Design-builder - Chesapeake Tunnel Joint Venture ... Dragados USA, Inc. ... Schiavone Construction Co. LLC - lead contractor ... Design-build cost - $756 million ... Design-build contractor selected July 2016'. Consulted 18 Nov 2026.
- Parallel Thimble Shoal Tunnel Project, Chesapeake Bay Bridge and Tunnel District. 'The Parallel Thimble Shoal Tunnel project involves the construction of a two-lane bored tunnel from the CBBT's southernmost island (#1 Island) under Thimble Shoal Channel to #2 Island. When complete, the new tunnel will carry two lanes of traffic southbound and the existing tunnel will carry two lanes of traffic northbound.'. Consulted 19 Nov 2026.