I-64 Hampton Roads Express Lanes Network – 2026 scope
- Location
- Hampton Roads, VA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Virginia Department of Transportation | |
| Category | Highways | |
| Amount | Not collected yet | |
| Threshold evidence | Only a financed-scope figure meets the threshold; to reconcile |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Shirley-Branch Joint Venture | design-builder | HREL Hampton Segment (4C) | Virginia Department of Transportation |
| Allan Myers | design-builder | HREL Norfolk Segment (1A) | Virginia Department of Transportation |
| Lane Construction | contractor (design-bid-build) | HREL Newport News Segment (4A/4B) | Virginia Department of Transportation |
About the project
This is the 2026 express-lanes financing scope.
Scope notes
- This is the 2026 express-lanes financing scope. U.S. DOT Build America Bureau
Sources
- I-64 Hampton Roads Express Lanes Network – 2026 scope, U.S. DOT Build America Bureau, 29 Jun 2026. This is the 2026 express-lanes financing scope.. Consulted 9 Nov 2026.
- Hampton Roads Express Lanes (HREL) Hampton Segment 4C, Virginia Department of Transportation. 'Contractor: Shirley-Branch Joint Venture; Design-build contract cost: $337 million; Start of construction: Summer 2023; Estimated completion: Summer 2027'. Consulted 18 Nov 2026.
- Hampton Roads Express Lanes (HREL) Norfolk Segment 1A, Virginia Department of Transportation. 'Contractor: Design-build, Allan Myers; Design-build contract cost: $188 million; Start: Summer 2023; Completion: Fall 2026'. Consulted 18 Nov 2026.
- Hampton Roads Express Lanes (HREL) Newport News Segment (4A/4B), Virginia Department of Transportation. 'Contractor: Lane construction; Design-bid-build contract cost: $115 million; Start of construction: Spring 2024; Estimated completion: Spring 2027'. Consulted 18 Nov 2026.