Providence Combined Sewer Overflow Phase IIIA

Location
Providence / Pawtucket, RI, United States. Location shown at city level. See it on the map
Stage
Stage not confirmed: Not collected yet.
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorNarragansett Bay Commission
CategoryWater
AmountUS$548.4 million (US dollars), as of August 27, 2019U.S. Environmental Protection Agency
What the amount coversCost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost.
Threshold evidenceOnly a financed-scope figure meets the threshold; to reconcile
Sourced facts in the research record

Water projects are counted apart and left out of totals while their place in the atlas is decided.

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$548 MCost of the WIFIA-financed scopeScope financed by WIFIA27 Aug 2019U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost.
Financial records, each with its kind and scope

Contracts and teams

CompanyRolePackageSource
Joint venture of CBNA (US division of Bouygues-TP) and Barlettadesign-builderNBC Phase III CSO Pawtucket Tunnel (design-build of the Pawtucket Tunnel and Pump Station), AECOM lead designerBarletta Companies
Delivery parties, each named by the owner, a government or the company itself

Milestones

DateMilestoneScopeSource
August 27, 2019Financing closedScope financed by WIFIAU.S. Environmental Protection Agency
Dated milestones, at the precision of their source

About the project

Financed scope for Phase IIIA, the third phase of the Narragansett Bay Commission's combined sewer overflow projects.

Scope notes

Sources

  • Providence Combined Sewer Overflow Phase IIIA – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
  • WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
  • NBC Phase III CSO Pawtucket Tunnel, Barletta Companies. 'As part of a Joint Venture with CBNA (the US Division of the international firm Bouygues-TP), Barletta provided the local knowledge and expertise ... Design-Build ... AECOM ... Project Value: $450M'. Consulted 18 Nov 2026.

See it on the map. How the atlas qualifies a record.