Providence Combined Sewer Overflow Phase IIIA
- Location
- Providence / Pawtucket, RI, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Narragansett Bay Commission | |
| Category | Water | |
| Amount | US$548.4 million (US dollars), as of August 27, 2019 | U.S. Environmental Protection Agency |
| What the amount covers | Cost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. | |
| Threshold evidence | Only a financed-scope figure meets the threshold; to reconcile |
Water projects are counted apart and left out of totals while their place in the atlas is decided.
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$548 M | Cost of the WIFIA-financed scope | Scope financed by WIFIA | 27 Aug 2019 | U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Joint venture of CBNA (US division of Bouygues-TP) and Barletta | design-builder | NBC Phase III CSO Pawtucket Tunnel (design-build of the Pawtucket Tunnel and Pump Station), AECOM lead designer | Barletta Companies |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| August 27, 2019 | Financing closed | Scope financed by WIFIA | U.S. Environmental Protection Agency |
About the project
Financed scope for Phase IIIA, the third phase of the Narragansett Bay Commission's combined sewer overflow projects.
Scope notes
- Financed scope for Phase IIIA. The full combined sewer overflow programme has additional phases. U.S. Environmental Protection Agency
Sources
- Providence Combined Sewer Overflow Phase IIIA – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
- WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
- NBC Phase III CSO Pawtucket Tunnel, Barletta Companies. 'As part of a Joint Venture with CBNA (the US Division of the international firm Bouygues-TP), Barletta provided the local knowledge and expertise ... Design-Build ... AECOM ... Project Value: $450M'. Consulted 18 Nov 2026.