Raritan River Bridge Replacement
- Location
- Perth Amboy, NJ, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of December 2024 (NJ TRANSIT).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | NJ TRANSIT | |
| Category | Bridges | |
| Amount | US$595 million (US dollars) | NJ TRANSIT |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$595 M | Capital estimate | Whole project | Undated | NJ TRANSIT |
| US$446 M | Federal grant | Whole project | Undated | NJ TRANSIT |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| December 11, 2024 | award | Whole project | NJ TRANSIT |
About the project
Replacement of the century-old swing bridge carrying the North Jersey Coast Line over the Raritan River between Perth Amboy and South Amboy, damaged by Superstorm Sandy, with a new vertical-lift bridge. NJ TRANSIT estimates the project at $595 million, with $446 million from a Federal Transit Administration grant. The Board awarded the second construction contract, covering the lift portion of the bridge, in December 2024.
Sources
- Bridge Replacement Project Underway, NJ TRANSIT. Body: 'estimated at $595 million', '$446 million' FTA grant, lift-span replacing a 112-year-old swing bridge, groundbreaking ceremony September 15. Consulted 12 Nov 2026.
- NJ TRANSIT Advances Construction of New Raritan River Bridge, NJ TRANSIT, 11 Dec 2024. Body: Board awards the second construction contract, the lift portion, Perth Amboy to South Amboy. Consulted 12 Nov 2026.