Highway 101: Carpinteria to Santa Barbara
- Location
- Santa Barbara, CA, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of November 2025 (Santa Barbara County Association of Governments and Caltrans (sbroads.com)).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Caltrans and Santa Barbara County Association of Governments | |
| Category | Highways | |
| Route length | 16 mi | Santa Barbara County Association of Governments |
| Amount | US$693 million (US dollars), as of November 2026 | Federal Highway Administration |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$693 M | Capital estimate | Whole project | Nov 2026 | Federal Highway Administration |
| US$425 M | Capital estimate | One phase | Nov 2026 | Santa Barbara County Association of Governments |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| August 2026 | completion | Whole project | Federal Highway Administration |
About the project
Widening of 16 miles of US 101 between Santa Barbara and Mussel Shoals to three lanes in each direction by adding a peak-period carpool lane, built in phases; the corridor site reports eight of the 16 miles widened, and SBCAG's undated project page costs the remaining ten-mile gap from Montecito to Carpinteria at $425 million. FHWA lists a $693 million total cost with a $440 million funded phase and a current completion of August 2026.
Sources
- FHWA Active Major Project Status Report (FOIS), Federal Highway Administration. Project 'Highway 101 - Carpentaria to Santa Barbara Project': Total Cost Baseline $693 Current $693; Funded Phase Cost $440; Completion Current Aug-2026. Consulted 12 Nov 2026.
- Highway 101: Santa Barbara to Mussel Shoals (sbroads.com), Santa Barbara County Association of Governments. 'The Highway 101: Santa Barbara to Mussel Shoals project includes the widening of Highway 101 to include three lanes in each direction. Eight of the 16 miles in this area have been widened.'; segments named Santa Barbara North, Santa Barbara South, Montecito. Consulted 12 Nov 2026.
- Santa Barbara Highway 101, Santa Barbara County Association of Governments. 'The remaining ten mile gap from Montecito to Carpinteria will require $425 million to complete.'; 'Total Estimated Cost: $425 million'; the page's schedule text is older (Phase 3 'scheduled to complete construction in 2020'). Consulted 12 Nov 2026.
- Highway 101: Montecito, Santa Barbara County Association of Governments and Caltrans (sbroads.com). 'Construction is scheduled from mid-June 2023 through 2026.'; 'New bridges will be built over Romero, San Ysidro, and Oak Creeks.'. Consulted 19 Nov 2026.
- Highway 101: Santa Barbara North, Santa Barbara County Association of Governments and Caltrans (sbroads.com). 'scheduled from summer 2023 through 2026'; 'two new bridges' at the Cabrillo Boulevard Interchange'. Consulted 19 Nov 2026.
- Lane and Train Solution: Phase 4, Santa Barbara County Association of Governments and Caltrans (sbroads.com). '10.9 miles'; 'peak-period carpool lanes'; 16 miles of Highway 101, 'Highway 101: Santa Barbara to Mussel Shoals''. Consulted 19 Nov 2026.