Research record, not reviewed

I-15 Farmington to Salt Lake City

Location
Salt Lake City, UT, United States. Location shown at city level. See it on the map
Stage
Procurement, as of November 2026 (Utah Department of Transportation).
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorUtah Department of Transportation
CategoryHighways
AmountUS$3.7 billion (US dollars), as of 2024Utah Department of Transportation
What the amount coversCapital estimate.
Threshold evidenceA cited project-scope figure meets the threshold
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$3.7 bnCapital estimateWhole project2024Utah Department of Transportation
US$1.7 bnFunding commitmentWhole project2024Utah Department of Transportation
Financial records, each with its kind and scope

Contracts and teams

Contracts and teams: No construction contract awarded yet Utah Department of Transportation.

Milestones

DateMilestoneScopeSource
2024approvalWhole projectUtah Department of Transportation
2027construction startWhole projectUtah Department of Transportation
Dated milestones, at the precision of their source

About the project

Reconstruction and widening of I-15 between Farmington in Davis County and Salt Lake City, studied in an Environmental Impact Statement whose Final EIS and Record of Decision were released in fall 2024. UDOT's high-level estimate from the environmental process puts the total project cost at $3.7 billion, with $1.7 billion of state transportation funding allocated for future construction, which could begin as soon as 2027.

Sources

  • I-15 Farmington to Salt Lake City EIS, Utah Department of Transportation. 'High-level estimates prepared during the environmental process indicate a total project cost of $3.7 billion'; '$1.7 billion of state transportation funding has been allocated for future construction'; FEIS and ROD released, impacts 'as defined in the FEIS Report in Fall 2024'; 'construction would begin as soon as 2027'. Consulted 12 Nov 2026.
  • I-15 | Farmington to Salt Lake City | Reconstruction (UDOT PublicInput project page), Utah Department of Transportation. 'We are currently preparing to hire a Design-Build team to design and construct the project.'; 'Contractor Selection - Winter 2026/27'; 'Design-Builder on board to begin final design of the project in January 2027.'; 'we hope to begin initial construction in spring 2027'. Consulted 19 Nov 2026.

See it on the map. How the atlas qualifies a record.