Research record, not reviewed
I-15 Farmington to Salt Lake City
- Location
- Salt Lake City, UT, United States. Location shown at city level. See it on the map
- Stage
- Procurement, as of November 2026 (Utah Department of Transportation).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Utah Department of Transportation | |
| Category | Highways | |
| Amount | US$3.7 billion (US dollars), as of 2024 | Utah Department of Transportation |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$3.7 bn | Capital estimate | Whole project | 2024 | Utah Department of Transportation |
| US$1.7 bn | Funding commitment | Whole project | 2024 | Utah Department of Transportation |
Contracts and teams
Contracts and teams: No construction contract awarded yet Utah Department of Transportation.
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| 2024 | approval | Whole project | Utah Department of Transportation |
| 2027 | construction start | Whole project | Utah Department of Transportation |
About the project
Reconstruction and widening of I-15 between Farmington in Davis County and Salt Lake City, studied in an Environmental Impact Statement whose Final EIS and Record of Decision were released in fall 2024. UDOT's high-level estimate from the environmental process puts the total project cost at $3.7 billion, with $1.7 billion of state transportation funding allocated for future construction, which could begin as soon as 2027.
Sources
- I-15 Farmington to Salt Lake City EIS, Utah Department of Transportation. 'High-level estimates prepared during the environmental process indicate a total project cost of $3.7 billion'; '$1.7 billion of state transportation funding has been allocated for future construction'; FEIS and ROD released, impacts 'as defined in the FEIS Report in Fall 2024'; 'construction would begin as soon as 2027'. Consulted 12 Nov 2026.
- I-15 | Farmington to Salt Lake City | Reconstruction (UDOT PublicInput project page), Utah Department of Transportation. 'We are currently preparing to hire a Design-Build team to design and construct the project.'; 'Contractor Selection - Winter 2026/27'; 'Design-Builder on board to begin final design of the project in January 2027.'; 'we hope to begin initial construction in spring 2027'. Consulted 19 Nov 2026.