Research record, not reviewed
Howard Frankland Bridge Replacement
- Location
- Tampa, FL, United States. Location shown at city level. See it on the map
- Stage
- Opened, as of August 2026 (Florida Department of Transportation, District Seven).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Florida Department of Transportation (FDOT) | |
| Category | Bridges | |
| Lanes | 8 | The Walsh Group (Archer Western) |
| Total length | 3 mi | The Walsh Group (Archer Western) |
| Amount | US$865 million (US dollars), as of March 2025 | The Walsh Group (Archer Western) |
| What the amount covers | Project value. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$865 M | Project value | Whole project | Mar 2025 | The Walsh Group (Archer Western) |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Archer Western-Traylor Bros., Inc. joint venture (Walsh Group) | contractor (joint venture) | The Walsh Group (Archer Western) |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| March 2025 | opening | Whole project | The Walsh Group (Archer Western) |
| 2026 | opening | Whole project | Florida Department of Transportation, District Seven |
About the project
A new eight-lane bridge over Old Tampa Bay on I-275 between Tampa and St. Petersburg, more than three miles long, with four general-purpose southbound lanes, two tolled express lanes in each direction and a 12-foot shared-use path, built by the Archer Western-Traylor Bros. joint venture for FDOT. FDOT opened the new southbound bridge to traffic in 2025 (March 2025, per the contractor); tolls were being collected on the express lanes as of August 22, 2026, the shared-use path has opened, and FDOT gives a construction cost of $973.4 million (the contractor called it an $865 million project).
Sources
- New span of the Howard Frankland Bridge officially open to commuters, The Walsh Group (Archer Western), Mar 2025. Body: '$865 million project', Florida Department of Transportation owner, Archer Western and Traylor Bros. JV, eight lanes, over three miles, express lanes 2026. Consulted 12 Nov 2026.
- Howard Frankland Bridge Replacement (FPID 422904-2-52-01), Florida Department of Transportation, District Seven. 'In 2025, the FDOT opened the new southbound I-275 (Howard Frankland Bridge) to traffic.'; 'As of August 22, 2026, tolls are being collected electronically 24 hours a day, seven days a week, on the new Howard Frankland Bridge (I-275) Express Lanes'; 'Construction Cost: $973.4 million'; 'Estimated Completion: Late 2026'; 'Archer Western/Traylor Bros Joint Venture'. Consulted 19 Nov 2026.