Research record, not reviewed
Alligator River Bridge Replacement
- Location
- Tyrrell / Dare counties, NC, United States. Location shown at city level. See it on the map
- Stage
- Under construction. Date of this stage: not collected yet (North Carolina Department of Transportation).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | North Carolina Department of Transportation | |
| Category | Bridges | |
| Bridge length approx | 3.32 mi | North Carolina Department of Transportation |
| Navigation clearance | 65 ft | North Carolina Department of Transportation |
| Amount | Not collected yet | |
| Threshold evidence | A comparable project-wide cost is still needed |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$110 M | Federal grant | Whole project | 8 Jan 2025 | North Carolina Department of Transportation |
| US$450 M | Contract value | One package | 9 Jan 2025 | North Carolina Department of Transportation |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Skanska USA | construction contractor | Replacement bridge | North Carolina Department of Transportation |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| February 2025 | Construction milestone | Whole project | North Carolina Department of Transportation |
About the project
A replacement crossing on the route to the Outer Banks. NCDOT describes a fixed-span bridge with 65 feet of vertical navigation clearance.
Sources
- Rebuilding 18 of America’s Most Economically Significant Bridges, U.S. Department of Transportation, Dec 2024. PDF page 14 · Project profile and grant. Consulted 9 Nov 2026.
- Work to Begin Soon on Alligator River Bridge Replacement, North Carolina Department of Transportation, 9 Jan 2025. Construction contract and Skanska USA award. Consulted 9 Nov 2026.
- Alligator River Bridge project overview, North Carolina Department of Transportation. Construction start and construction cost. Consulted 9 Nov 2026.
- STERLING: US 64 over Alligator River Bridge Replacement, USDOT MPDG application, North Carolina Department of Transportation, May 2022. 'The bridge will consist of 134 spans of lengths varying from 80 feet to 170 feet over the dedicated channel with a total length of 3.32 miles.'. Consulted 19 Nov 2026.
- Lindsay C. Warren (Alligator River) Bridge Replacement, Project Highlights, North Carolina Department of Transportation. '65-foot vertical navigable channel clearance'. Consulted 19 Nov 2026.