Asheville I-26 Connector
- Location
- Asheville, NC, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of November 2026 (North Carolina Department of Transportation).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | North Carolina Department of Transportation | |
| Category | Highways | |
| Route length | 7 mi | North Carolina Department of Transportation |
| Amount | US$1.8 billion (US dollars), as of November 2026 | North Carolina Department of Transportation |
| What the amount covers | Capital estimate, approx. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$1.8 bn | Capital estimate, approx. | Whole project | Nov 2026 | North Carolina Department of Transportation |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Archer Wright JV | design-build contractor (awardee) | I-2513B and I-2513D: I-26/I-240 from south of SR 3548 (Haywood Road) to north of SR 1781 (Broadway Street) and SR 1477 from SR 1517 (Hill Street) to SR 1781; Contract No. C204953 | North Carolina Department of Transportation |
About the project
About seven miles of new and upgraded interstate through Asheville: I-26 on a new location from the Haywood Road interchange north across the French Broad River to US 19/23/70, an upgraded I-240 with its Brevard and Amboy road interchanges, and initial improvements at the I-26/I-40/I-240 interchange. NCDOT says the project (STIP I-2513) is funded for approximately $1.8 billion, a design-build contract is awarded and construction is under way; Section C of the I-40 interchanges is reprioritised for future funding.
Sources
- Asheville I-26 Connector, North Carolina Department of Transportation, 10 Sep 2026. 'listed as Project I-2513 in the N.C. Department of Transportation's State Transportation Improvement Program and is funded for approximately $1.8 billion'; 'Design build contract is awarded'; 'Construction is underway on the I-26 Connector'; 'Section C will be reprioritized for funding'; page last updated 9/10/2026. Consulted 12 Nov 2026.
- FHWA Active Major Project Status Report (FOIS), Federal Highway Administration. Project 'I-26 Connector - Asheville': sponsor NCDOT, procurement Design-Build (no cost reported). Consulted 12 Nov 2026.
- Notification of Award, I-2513B and I-2513D (Design-Build Program), North Carolina Department of Transportation, 14 May 2024. 'ARCHER WRIGHT JV ... Contract No. C204953 ... Tip No. I-2513B, I-2513D ... This is official notification that the Secretary Of Transportation has awarded you the contract for the above project based on the bid submitted on May 07, 2024 in the amount of $1,147,238,700.00.'. Consulted 18 Nov 2026.