Carolina Crossroads
- Location
- Columbia, SC, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of November 2026 (South Carolina Department of Transportation).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | South Carolina Department of Transportation | |
| Category | Highways | |
| Amount | US$2.69 billion (US dollars), as of November 2026 | South Carolina Department of Transportation |
| What the amount covers | Project value. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$2.69 bn | Project value | Whole project | Nov 2026 | South Carolina Department of Transportation |
| US$1.67 bn | Capital estimate | Whole project | Nov 2026 | Federal Highway Administration |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| United-Blythe Joint Venture (UBJV) | design-build contractor | Carolina Crossroads Project Phase 3C, Lexington County (Contract No. 3270580) | South Carolina Department of Transportation |
| Archer-United JV | design-build contractor | Carolina Crossroads Phase 2, Broad River Road at I-20 Interchange (Contract No. 4056790) | South Carolina Department of Transportation |
| Archer-United JV | design-build contractor | Carolina Crossroads Phase 1, Colonial Life Blvd. at I-126 Interchange (Contract No. 5156780) | South Carolina Department of Transportation |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| November 2021 | construction start | Whole project | South Carolina Department of Transportation |
About the project
Reconstruction of the I-20, I-26 and I-126 corridor, delivered in phases 1, 2, 3A to 3E and 4/5. SCDOT describes it as a 2.69 billion dollar investment; construction began in November 2021, phases 1, 2 and 3B are complete, phase 3C is in construction and the remaining phases are in pre-procurement, with substantial completion expected in the mid-2030s. FHWA lists the project at $1,674 million.
Sources
- Carolina Crossroads, South Carolina Department of Transportation. '2.69 billion dollar investment'; 'Construction began in November 2021'; 'expected to be substantially complete in the mid-2030s'; phase status list. Consulted 12 Nov 2026.
- FHWA Active Major Project Status Report (FOIS), Federal Highway Administration. Project 'Carolina Crossroads': Total Cost Baseline $1,674 Current $1,674 Final $1,674; Completion Jul-2029. Consulted 12 Nov 2026.
- Notification of Award, Contract No. 3270580, Carolina Crossroads Project Phase 3C, South Carolina Department of Transportation, 6 May 2025. 'United-Blythe Joint Venture (UBJV) ... NOTIFICATION OF AWARD ... Carolina Crossroads Project Phase 3C, Lexington County ... This letter serves as the official notification of award for the above reference project based upon the cost proposal submitted on April 17, 2025 in the amount of $170,000,000'. Consulted 18 Nov 2026.
- Notification of Award, Contract No. 4056790, Carolina Cross Roads Phase 2, South Carolina Department of Transportation, 8 Sep 2021. 'Archer-United JV ... NOTIFICATION OF AWARD September 8, 2021 ... Carolina Cross Roads Phase 2 — Broad River Road at I-20 Interchange ... in the amount of $127,000,000.00'. Consulted 18 Nov 2026.
- Notification of Award, Contract No. 5156780, Carolina Crossroads Phase 1, South Carolina Department of Transportation, 12 May 2021. 'Archer-United JV ... NOTIFICATION OF AWARD May 12, 2021 ... Carolina Crossroads Phase 1 — Colonial Life Blvd. at I-126 Interchange ... based upon the bid submitted on April 29, 2021, in the amount of $207,900,000.00'. Consulted 18 Nov 2026.