I-26 Widening (US 64 to I-40/I-240)
- Location
- Hendersonville, NC, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of April 2025 (North Carolina Department of Transportation).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | North Carolina Department of Transportation | |
| Category | Highways | |
| Route length | 16.9 mi | North Carolina Department of Transportation |
| Amount | US$761 million (US dollars), as of November 2026 | Federal Highway Administration |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$761 M | Capital estimate | Whole project | Nov 2026 | Federal Highway Administration |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Archer-Wright Joint Venture (Archer-Western and Wright Brothers Construction) | contractor | Airport Road (Buncombe County line) to U.S. 25 Business (eight lanes) and on to U.S. 64 at Four Seasons Boulevard (six lanes) | North Carolina Department of Transportation |
| Fluor-United Joint Venture | contractor | Brevard Road to the Henderson County line near Airport Road | North Carolina Department of Transportation |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| 2019 | construction start | Whole project | North Carolina Department of Transportation |
| September 2028 | completion | Whole project | Federal Highway Administration |
About the project
Widening of about 16.9 miles of I-26 from US 64 in Hendersonville to the I-40/I-240 interchange at Asheville, in two sections (I-4400, 9.1 miles, and I-4700, 7.8 miles), with rebuilt bridges, drainage and pavement. NCDOT says construction began in fall 2019 and was under way at its April 2025 update; FHWA lists a $761 million total cost and a September 2028 completion.
Sources
- FHWA Active Major Project Status Report (FOIS), Federal Highway Administration. Project 'I-26 Widening South of Asheville': Total Cost $761; Completion Current Sep-2028; Design-Build. Consulted 12 Nov 2026.
- I-26 Widening, North Carolina Department of Transportation, 9 Apr 2025. 'Construction began in the fall of 2019'; sections I-4400 (9.1 miles) and I-4700 (7.8 miles); 'Construction is underway'. Consulted 12 Nov 2026.
- I-26 Widening - Project History, North Carolina Department of Transportation, 26 Mar 2020. 'A partnership team of Archer-Western and Wright Brothers Construction — Archer-Wright Joint Venture — received the contract for widening I-26 to eight lanes from Airport Road at the Buncombe County line to U.S. 25 Business at the Mountain Home exit, and six lanes from there to U.S. 64 at the Four Seasons Boulevard exit in Hendersonville.'. Consulted 18 Nov 2026.