I-10 Mobile River Bridge and Bayway
- Location
- Mobile / Baldwin County, AL, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Alabama Department of Transportation | |
| Category | Bridges | |
| Amount | Not collected yet | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$550 M | Federal grant | Whole project | Jul 2024 | Alabama Department of Transportation (ALDOT News Hub) |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Kiewit Massman Traylor (KMT) | design-build team (joint venture) | Mobile River Bridge and Bayway (cable-stayed bridge and, since May 2025, the Bayway) | Alabama Department of Transportation (ALDOT News Hub) |
About the project
Project to improve the I-10 Mobile River crossing and Bayway corridor. The federal amount is a Bridge Investment Program grant.
Sources
- Rebuilding 18 of America’s Most Economically Significant Bridges, U.S. Department of Transportation, Dec 2024. PDF page 4 · Project profile and grant. Consulted 9 Nov 2026.
- I-10 Mobile River Bridge and Bayway, U.S. Department of Transportation. Project cost and financing structure. Consulted 9 Nov 2026.
- Governor Ivey authorizes construction for major Mobile River Bridge and Bayway project, sets groundbreaking date, Alabama Department of Transportation (ALDOT News Hub), 30 Sep 2026. 'the Alabama Department of Transportation (ALDOT), on behalf of the Alabama Toll Road, Bridge and Tunnel Authority, issued a notice to proceed to the Kiewit Massman Traylor (KMT) design-build team on Friday, September 25. ... With a construction cost of $3.2 billion'. Consulted 18 Nov 2026.
- USDOT announces ALDOT to receive $550 million for Mobile River Bridge and Bayway project, Alabama Department of Transportation (ALDOT News Hub), 17 Jul 2024. 'ALDOT was awarded $550 million for the I-10 Mobile River Bridge and Bayway project'; 'Large Bridge Project Grants under the Bridge Investment Program'. Consulted 19 Nov 2026.
- ALDOT announces updates to Mobile River Bridge and Bayway as project advances, Alabama Department of Transportation (ALDOT News Hub), 6 May 2025. 'The Alabama Department of Transportation announced today that the continued development of the Mobile River Bridge and Bayway project will move forward under the Kiewit Massman Traylor (KMT) team.'; 'KMT is the joint venture team previously chosen to design and build the cable-stayed bridge portion of the project.'. Consulted 19 Nov 2026.