I-35 Capital Express Central
- Location
- Austin, TX, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Texas Department of Transportation | |
| Category | Highways | |
| Amount | US$4.5 billion (US dollars) | Texas Department of Transportation |
| What the amount covers | Capital estimate, approx.: Approximately US$4.5bn anticipated construction cost for Central. North and South are separate delivery projects. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$4.5 bn | Capital estimate, approx. | Whole project | Undated | Texas Department of TransportationApproximately US$4.5bn anticipated construction cost for Central. North and South are separate delivery projects. |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Balfour Beatty | contractor | Approximately 2.5-mile section on the south side of downtown Austin, including a bridge across Lady Bird Lake | Balfour Beatty |
| SAK/Shea JV | contractor | Drainage Tunnel (6.5 miles, 22-foot diameter), Drainage Tunnel and Pump Station Segment | Texas Department of Transportation |
| Webber Waterworks | contractor | Pump Station, Drainage Tunnel and Pump Station Segment | Texas Department of Transportation |
| Harper Brothers LLC | contractor | Martin Luther King Jr. Boulevard Bridge Segment | Texas Department of Transportation |
| WSP | designer (engineering services: plans, specifications and estimates) | I-35 Capital Express Central Downtown corridor (1.8 miles) | WSP |
About the project
Approximately US$4.5bn anticipated construction cost for Central. North and South are separate delivery projects.
Scope notes
- Approximately US$4.5bn anticipated construction cost for Central. North and South are separate delivery projects. Texas Department of Transportation
Sources
- I-35 Capital Express Central – official project evidence, Texas Department of Transportation. Approximately US$4.5bn anticipated construction cost for Central. North and South are separate delivery projects.. Consulted 9 Nov 2026.
- Balfour Beatty Secures $746 Million Texas Interstate Contract, Balfour Beatty, 5 Nov 2024. 'Balfour Beatty [...] has been awarded a $746 million contract by the Texas Department of Transportation to rebuild part of the Interstate 35 (I-35) through Austin, Texas. [...] reconstruct an approximately 2.5-mile section of the route on the south side of downtown Austin [...] a bridge across Lady Bird Lake'. Consulted 18 Nov 2026.
- I-35 Capital Express Central Project Construction Information: Drainage Tunnel and Pump Station Overview, Texas Department of Transportation. 'Construction start is May 2025. The contractor for the drainage tunnel is SAK/Shea JV and the contractor for the pump station is Webber Waterworks.'. Consulted 18 Nov 2026.
- I-35 Capital Express Central Project Construction Information: Martin Luther King Jr. Boulevard Bridge Segment (as of 9/11/2024), Texas Department of Transportation, 11 Sep 2024. 'The construction cost is $34.4 million. [...] Construction start is September 2024. The contractor for this segment is Harper Brothers LLC.'. Consulted 18 Nov 2026.
- TxDOT Selects WSP for Capital Express Central Downtown Reconstruction Project, WSP, 7 Mar 2024. 'The Texas Department of Transportation (TxDOT) has chosen WSP [...] to provide engineering services for the 1.8 mile I-35 Capital Express Central Downtown (CapEx-C Downtown) Corridor reconstruction [...] plans, specifications and estimates (PS&E) for the 1.8 mile downtown segment.'. Consulted 18 Nov 2026.