Mouse River Enhanced Flood Protection Project

Location
Minot, ND, United States. Location shown at city level. See it on the map
Stage
Under construction, as of 2026 (Souris River Joint Board (Mouse River Plan project site)).
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorSouris River Joint Board with the City of Minot
CategoryWater
AmountUS$1.8 billion (US dollars), as of February 2026North Dakota Department of Water Resources
What the amount coversCapital estimate.
Threshold evidenceA cited project-scope figure meets the threshold
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$1.8 bnCapital estimateWhole projectFeb 2026North Dakota Department of Water Resources
Financial records, each with its kind and scope

Contracts and teams

CompanyRolePackageSource
Wagner ConstructioncontractorPhase MI-7E (Roosevelt Park and Zoo): concrete floodwall, earthen levee, municipal utility modifications, bank stabilizationSouris River Joint Board (Mouse River Plan project site)
Mattson ConstructioncontractorPhase MI-7 park and zoo buildingsSouris River Joint Board (Mouse River Plan project site)
Delivery parties, each named by the owner, a government or the company itself

About the project

Levees, floodwalls, diversion and bridges through Minot and the rural Mouse (Souris) River loop after the June 2011 flood that impacted 4,700 residential, commercial and public structures, built in phases; the City of Minot is the primary source of the local funding share with the Souris River Joint Board as co-sponsor. The North Dakota Department of Water Resources' February 2026 project sheet gives an estimated total project cost of $1.8 billion, with historic funding of $141 million federal, $207 million local and $471 million state and an estimated $1.06 billion remaining.

Sources

  • Mouse River Enhanced Flood Protection Project (Water Development Plan large project sheet), North Dakota Department of Water Resources, Feb 2026. Funding panel: 'Estimated Total Project $1.8B', 'HISTORIC FUNDING Federal $141M, Local $207M, State $471M', 'Est. Remaining Funds $1.06B'; 'LOCAL SPONSOR' paragraph; 'COMBINED PROJECTS (Levees, Floodwalls, Diversion, Bridges, Etc.)'; 'Ongoing phases of the MREFPP involve developing flood risk solutions in the urbanized and rural portions of the basin'; dated 'FEBRUARY 2026' (PDF read locally with pymupdf from the file WebFetch downloaded from this URL on 2026-11-13; WebFetch's summariser could not read it). Consulted 13 Nov 2026.
  • Phase MI-7 Roosevelt Park and Zoo, Souris River Joint Board (Mouse River Plan project site). 'Wagner Construction had a productive construct season with Phase MI-7E moving forward and it includes the concrete floodwall, earthen levee, municipal utility modifications, and bank stabilization.'. Consulted 18 Nov 2026.