Mouse River Enhanced Flood Protection Project
- Location
- Minot, ND, United States. Location shown at city level. See it on the map
- Stage
- Under construction, as of 2026 (Souris River Joint Board (Mouse River Plan project site)).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Souris River Joint Board with the City of Minot | |
| Category | Water | |
| Amount | US$1.8 billion (US dollars), as of February 2026 | North Dakota Department of Water Resources |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$1.8 bn | Capital estimate | Whole project | Feb 2026 | North Dakota Department of Water Resources |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Wagner Construction | contractor | Phase MI-7E (Roosevelt Park and Zoo): concrete floodwall, earthen levee, municipal utility modifications, bank stabilization | Souris River Joint Board (Mouse River Plan project site) |
| Mattson Construction | contractor | Phase MI-7 park and zoo buildings | Souris River Joint Board (Mouse River Plan project site) |
About the project
Levees, floodwalls, diversion and bridges through Minot and the rural Mouse (Souris) River loop after the June 2011 flood that impacted 4,700 residential, commercial and public structures, built in phases; the City of Minot is the primary source of the local funding share with the Souris River Joint Board as co-sponsor. The North Dakota Department of Water Resources' February 2026 project sheet gives an estimated total project cost of $1.8 billion, with historic funding of $141 million federal, $207 million local and $471 million state and an estimated $1.06 billion remaining.
Sources
- Mouse River Enhanced Flood Protection Project (Water Development Plan large project sheet), North Dakota Department of Water Resources, Feb 2026. Funding panel: 'Estimated Total Project $1.8B', 'HISTORIC FUNDING Federal $141M, Local $207M, State $471M', 'Est. Remaining Funds $1.06B'; 'LOCAL SPONSOR' paragraph; 'COMBINED PROJECTS (Levees, Floodwalls, Diversion, Bridges, Etc.)'; 'Ongoing phases of the MREFPP involve developing flood risk solutions in the urbanized and rural portions of the basin'; dated 'FEBRUARY 2026' (PDF read locally with pymupdf from the file WebFetch downloaded from this URL on 2026-11-13; WebFetch's summariser could not read it). Consulted 13 Nov 2026.
- Phase MI-7 Roosevelt Park and Zoo, Souris River Joint Board (Mouse River Plan project site). 'Wagner Construction had a productive construct season with Phase MI-7E moving forward and it includes the concrete floodwall, earthen levee, municipal utility modifications, and bank stabilization.'. Consulted 18 Nov 2026.