Fargo–Moorhead Stormwater Diversion Channel

Location
Fargo / Moorhead, ND / MN, United States. Location shown at city level. See it on the map
Stage
Stage not confirmed: Not collected yet.
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorMetro Flood Diversion Authority
CategoryWater
AmountUS$1.3 billion (US dollars), as of June 18, 2021U.S. Environmental Protection Agency
What the amount coversCost of the WIFIA-financed scope: Cost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost.
Threshold evidenceOnly a financed-scope figure meets the threshold; to reconcile
Sourced facts in the research record

Water projects are counted apart and left out of totals while their place in the atlas is decided.

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$1.3 bnCost of the WIFIA-financed scopeScope financed by WIFIA18 Jun 2021U.S. Environmental Protection AgencyCost for the scope covered in this EPA fact sheet. It can be a phase or tranche and is not automatically the latest programme-wide cost.
Financial records, each with its kind and scope

Contracts and teams

CompanyRolePackageSource
Red River Valley Alliance (guarantors: Acciona S.A., Shikun & Binui Ltd and North American Energy Partners Inc.; lead contractors: Red River Constructors, Acciona Infraestructuras S.A., Shikun & Binui-America Inc. and North American Enterprises Ltd.)P3 developer (design, build, finance, operate and maintain)30-mile stormwater diversion channel and its support structuresMetro Flood Diversion Authority
ASN Constructorsdesign and construction arm of the P3 developer30-mile stormwater diversion channel and its support structuresMetro Flood Diversion Authority (FM Area Diversion)
Red River Valley Alliance Design JV, Hatch Associates Consultants Inc. and COWI North America Inc.lead engineers / designers30-mile stormwater diversion channel and its support structuresMetro Flood Diversion Authority
Delivery parties, each named by the owner, a government or the company itself

Milestones

DateMilestoneScopeSource
June 18, 2021Financing closedScope financed by WIFIAU.S. Environmental Protection Agency
Dated milestones, at the precision of their source

About the project

Channel financing scope.

Scope notes

Sources

  • Fargo–Moorhead Stormwater Diversion Channel – WIFIA profile, U.S. Environmental Protection Agency. Total WIFIA Project Costs; Project Description. The EPA closed-loan register gives the separate closing date.. Consulted 9 Nov 2026.
  • WIFIA Closed Loans, U.S. Environmental Protection Agency. Borrower, Project Name, Close Date and Loan Amount columns.. Consulted 9 Nov 2026.
  • Metro Flood Diversion Authority Selects Red River Valley Alliance as P3 Partner, Metro Flood Diversion Authority, 18 Jun 2021. 'The Red River Valley Alliance is a consortium of members that will be responsible for all the elements required to design, build, finance, operate and maintain the Diversion Project for 30 years after it is constructed. ... Acciona S.A. (for Acciona Concesiones S.L.), Shikun & Binui Ltd (for Shikun & Binui Concessions USA and Shikun & Binui-America), and North American Energy Partners Inc. ......'. Consulted 18 Nov 2026.
  • Project Leaders, Metro Flood Diversion Authority (FM Area Diversion). 'ASN Constructors ... the P3 developer's design and construction arm'. Consulted 18 Nov 2026.