O’Hare 21 Terminal Programme
- Location
- Chicago, IL, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Chicago Department of Aviation | |
| Category | Airports | |
| New concourses | 2 | Chicago Department of Aviation |
| Amount | Not collected yet | |
| Threshold evidence | A comparable project-wide cost is still needed |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| AECOM Hunt Clayco Bowa joint venture | contractor (construction delivery joint venture) | New Concourse D (ORDNext Satellite Concourse 1): 590,000 sf concourse, 19 gates, connector to Concourse C | Clayco |
| Turner Paschen Aviation Partners (Turner Construction and F.H. Paschen) | construction manager at risk | O'Hare 21 Program (construction manager at-risk; the page names no package) | F.H. Paschen |
| Austin Power Partners joint venture | construction lead (joint venture) | Terminal 5 expansion and renovation (about 350,000 sf added, 750,000 sf renovated) | Power Construction |
About the project
Terminal works include two new concourses and replacement of parts of Terminal 2 with a new global terminal. Chicago’s project page describes continuous airport operations through the works.
Scope notes
- Workbook Terminal Area Plan was joined as a programme alias. Review terminal phases, financial boundaries and effective dates before comparing costs.
Sources
- O’Hare 21 projects, Chicago Department of Aviation. Terminal programme. Consulted 9 Nov 2026.
- ORDNext (O'Hare 21 Satellite Concourse 1), Clayco. 'Construction is being delivered by the AECOM Hunt Clayco Bowa joint venture'. Consulted 18 Nov 2026.
- Turner Paschen Aviation Partners Selected for O'Hare 21, F.H. Paschen, 2019. 'Together with Turner Construction, as Turner Paschen Aviation Partners, we were selected as a Construction Manager At-Risk'. Consulted 18 Nov 2026.
- O'Hare Terminal 5 Renovation, Power Construction. 'Construction, led by the Austin Power Partners joint venture, expanded the existing building by approximately 350,000 sf and renovated an additional 750,000 sf of space.'. Consulted 18 Nov 2026.