ARDOT contract 040994 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE ON HIGHWAY 282 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF ITEM, EARTHWORK, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, EROSION CONTROL, PAVEMENT MARKING, CONSTRUCT ONE SEXTUPLE R.C. BOX CULVERT (70.50''), AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Crawford. 1 bid received; low bid $1,267,441 by Mobley Contractors, Inc..

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
47
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Mobley Contractors, Inc.$1,267,441Low
ARDOT contract 040994: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Mobley Contractors, Inc.
0001Clearing (201012)STA6$1,286.00
0002Grubbing (201111)STA6$1,286.00
0003Removal and disposal of fence (202011)LF470$4.75
0004Removal of existing bridge structure (site no. 1) (205011)LS1$171,819
0005Unclassified excavation (210213)CY1,971$22.75
0006Compacted embankment (210611)CY667$31.00
0007Soil stabilization (210702)TON50$50.00
0008Aggregate base course (class 7) (303117)TON687$50.00
0009Tack coat (401011)GAL206$7.00
0010Mineral aggregate in achm binder course (1") (406161)TON97$188.00
0011Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON5$120.00
0012Mineral aggregate in achm surface course (1/2") (407162)TON254$176.00
0013Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON17$120.00
0014Cold milling asphalt pavement (412002)SY444$12.00
0015Achm patching of existing roadway (415011)TON20$50.00
0016Furnishing field office (602011)EACH1$23,845
0017Maintenance of traffic (603010)LS1$51,413
0018Signs (604003)SF185$25.00
0019Barricades (604013)LF32$25.00
0020Traffic drums (604023)EACH12$40.00
0021Concrete ditch paving (type B) (605012)SY257$162.14
002224" side drain (606704)LF28$77.00
0023Selected pipe bedding (606994)CY30$10.00
0024Wire fence (type D) (619028)LF397$8.94
0025Lime (620001)TON1$45.00
0026Seeding (620011)ACRE0.41$2,472.96
0027Mulch cover (620022)ACRE1.85$1,196.47
0028Water (620030)MGAL74$10.00
0029Temporary seeding (621001)ACRE1.44$987.39
0030Silt fence (621021)LF930$3.68
0031Sand bag ditch checks (621031)BAG165$10.91
0032Sediment removal and disposal (621111)CY49$1.00
0033Rock ditch checks (621151)CY19$100.00
0034Second seeding application (623001)ACRE0.41$875.00
0035Solid sodding (624001)SY214$6.89
0036Roadway construction control (635001)LS1$34,418
0037Reflectorized paint pavement marking white (6") (718002)LF1,133$1.40
0038Reflectorized paint pavement marking yellow (6") (718102)LF1,133$1.40
0039Raised pavement markers (type II) (721002)EACH7$25.00
0040Unclassified excavation for structures-roadway (801101)CY139$658.77
0041Class S concrete-roadway (802012)CY365.23$1,233.43
0042Class 2 protective surface treatment (803004)SY345$6.40
0043Reinforcing steel-roadway (grade 60) (804003)LB51,139$1.98
0044Filter blanket (816003)SY400$7.30
0045Dumped riprap (816111)CY200$94.47
004616' steel gates (619332)EACH2$985.00
0048Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$51,896
ARDOT contract 040994: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy