ARDOT contract A60035 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO RUT MILL AND OVERLAY APPROXIMATELY 5.331 MILES OF HIGHWAY 67 IN HOT SPRING COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Hot Spring. 2 bids received; low bid $2,124,354 by Cranford Construction Co..
- Owner
- Arkansas DOT
- Letting
- 26 FEB 2025
- Pay items
- 32
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cranford Construction Co. | $2,124,354 | Low |
| 2 | Redstone Construction Group, Inc. | $2,182,836 | +3.0% |
Bid tabulation
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.