IDOT contract 61L08 bid tabulation
Elk Grove Village, section 23-00079-00-RS. Let by Illinois DOT on January 17, 2025, Cook, District 01. 3 bids received; low bid $1,585,102 by Plote Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 127
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Plote Construction, Inc. | $1,585,102 | Low |
| 2 | Builders Paving, LLC | $1,757,808 | +11% |
| 3 | Acura Inc. | $2,178,016 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Plote Construction, Inc. | 2. Builders Paving, LLC | 3. Acura Inc. |
|---|---|---|---|---|---|---|
| 1 | S-cornus sericea 3' (C2001636) | EACH | 6 | $86.00 | $100.00 | $94.60 |
| 2 | S-viburn dent bma 3' (C2011600) | EACH | 6 | $93.00 | $100.00 | $100.00 |
| 3 | P PL ornament T gal P (K0012990) | UNIT | 1 | $2,605.00 | $3,500.00 | $2,870.00 |
| 4 | Perennial plant care (K0026850) | SY | 75 | $25.00 | $10.00 | $27.50 |
| 5 | Conc truck washout (XX006821) | LS | 1 | $2,500.00 | $3,000.00 | $2,500.00 |
| 6 | R&rel lawn sprink sys (XX006826) | LF | 500 | $22.50 | $22.50 | $210.00 |
| 7 | DR STR clean & grout (XX008130) | EACH | 5 | $880.00 | $880.00 | $900.00 |
| 8 | Pavement marking SPL (XX008910) | SF | 973 | $28.00 | $28.00 | $32.00 |
| 9 | Ped signal post 5 FT (X1400378) | EACH | 1 | $1,557.00 | $1,557.00 | $1,716.00 |
| 10 | Explor trench SPL (X2130010) | LF | 100 | $50.00 | $50.00 | $100.00 |
| 11 | Temp access- com ent (X4022000) | EACH | 2 | $100.00 | $1,500.00 | $880.00 |
| 12 | PCC driveway PVT 8 SP (X4230800) | SY | 129 | $130.00 | $140.00 | $125.00 |
| 13 | PC conc sidewalk 5 SP (X4240430) | SF | 9,604 | $11.00 | $12.00 | $15.00 |
| 14 | PC conc sidewalk 8 SP (X4240460) | SF | 3,229 | $13.00 | $12.00 | $15.00 |
| 15 | Detectable warn SPL (X4240800) | SF | 176 | $60.00 | $45.00 | $60.00 |
| 16 | HMA surf rem var DP (X4401198) | SY | 125 | $6.00 | $10.00 | $27.00 |
| 17 | Conc median surf rem (X4402020) | SF | 12,766 | $2.00 | $1.75 | $2.20 |
| 18 | Retaining wall remov (X5220102) | LF | 73 | $50.00 | $65.00 | $165.00 |
| 19 | FR & lids adjust SPL (X6030310) | EACH | 9 | $1,250.00 | $1,250.00 | $1,800.00 |
| 20 | Comb CC&G TB6.24 SPL (X6060052) | LF | 75 | $55.00 | $65.00 | $70.00 |
| 21 | RCSD refl PVT MKR HMA (X7810301) | EACH | 204 | $43.00 | $36.00 | $48.00 |
| 22 | Rebld EX DBL handhole (X8140238) | EACH | 2 | $4,515.00 | $4,515.00 | $5,060.00 |
| 23 | Exp & rel EX unit DCT (X8161000) | LF | 30 | $80.00 | $80.00 | $88.00 |
| 24 | Light pole FDN 24D OS (X8360215) | LF | 24 | $417.80 | $417.80 | $462.00 |
| 25 | Accessible ped signal (X8760200) | EACH | 8 | $1,616.00 | $1,616.00 | $1,815.00 |
| 26 | Conc FDN TY A 12D (X8780012) | LF | 4 | $709.00 | $709.00 | $825.00 |
| 27 | Construction layout (Z0013798) | LS | 1 | $6,500.00 | $20,000 | $150,000 |
| 28 | Drain util STR adj (Z0017400) | EACH | 7 | $450.00 | $450.00 | $1,100.00 |
| 29 | Temp info signing (Z0030850) | SF | 253 | $16.00 | $16.00 | $18.00 |
| 30 | Maint lighting sys (Z0033028) | CAL MO | 5 | $1,280.00 | $1,280.00 | $1,500.00 |
| 31 | Temporary fence (20101000) | LF | 80 | $3.00 | $27.50 | $4.00 |
| 32 | Tree root pruning (20101200) | EACH | 2 | $750.00 | $750.00 | $85.00 |
| 33 | Tree prun 1-10 (20101300) | EACH | 1 | $800.00 | $800.00 | $55.00 |
| 34 | Tree prun over 10 (20101350) | EACH | 1 | $1,400.00 | $1,400.00 | $66.00 |
| 35 | Earth excavation (20200100) | CY | 232 | $50.00 | $95.00 | $45.00 |
| 36 | Rem & disp uns matl (20201200) | CY | 135 | $65.00 | $115.00 | $55.00 |
| 37 | Geotech fab F/GR stab (21001000) | SY | 150 | $5.00 | $5.00 | $6.00 |
| 38 | Topsoil F & P 4 (21101615) | SY | 862 | $6.00 | $0.10 | $7.00 |
| 39 | Sodding salt tolerant (25200110) | SY | 788 | $12.00 | $23.00 | $14.00 |
| 40 | Supple watering (25200200) | UNIT | 43 | $0.01 | $0.10 | $0.10 |
| 41 | Temp eros contr seed (28000250) | LB | 16 | $3.00 | $0.10 | $5.00 |
| 42 | Perimeter eros bar (28000400) | LF | 790 | $1.90 | $3.00 | $3.00 |
| 43 | Inlet filters (28000510) | EACH | 51 | $200.00 | $200.00 | $185.00 |
| 44 | Temp eros contr blank (28001100) | SY | 788 | $0.90 | $0.10 | $2.00 |
| 45 | Agg subgrade improve (30300001) | CY | 50 | $100.00 | $85.00 | $55.00 |
| 46 | Sub gran mat B 4 (31101200) | SY | 1,555 | $10.00 | $9.50 | $12.00 |
| 47 | Bit matls tack CT (40600290) | LB | 14,773 | $0.01 | $0.01 | $0.20 |
| 48 | Long joint sealant (40600370) | LF | 15,229 | $2.40 | $2.75 | $4.50 |
| 49 | Mix CR JTS flangewys (40600400) | TON | 33 | $500.00 | $550.00 | $440.00 |
| 50 | HMA surf rem butt JT (40600982) | SY | 135 | $60.00 | $30.00 | $82.00 |
| 51 | HMA repl over patch (40601005) | TON | 100 | $200.00 | $100.00 | $220.00 |
| 52 | HMA BC IL-9.5 N70 (40602985) | TON | 21 | $100.00 | $145.00 | $231.00 |
| 53 | P HMA BC IL-4.75 N50 (40603200) | TON | 939 | $135.00 | $115.00 | $146.00 |
| 54 | HMA SC IL-9.5 D N70 (40604062) | TON | 842 | $120.00 | $108.00 | $144.00 |
| 55 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 1,303 | $140.00 | $115.00 | $195.00 |
| 56 | Welded wire reinf (42000060) | SY | 254 | $25.00 | $15.00 | $12.00 |
| 57 | Protective coat (42001300) | SY | 1,815 | $1.00 | $0.10 | $0.10 |
| 58 | HMA surf rem 2 1/2 (44000159) | SY | 20,459 | $3.90 | $6.00 | $4.80 |
| 59 | Drive pavement rem (44000200) | SY | 136 | $20.00 | $25.00 | $20.00 |
| 60 | Comb curb gutter rem (44000500) | LF | 769 | $12.00 | $13.00 | $9.00 |
| 61 | Sidewalk rem (44000600) | SF | 10,302 | $3.00 | $4.00 | $3.00 |
| 62 | HMA RM OV patch 3 1/2 (44002214) | SY | 512 | $30.00 | $14.00 | $42.00 |
| 63 | CL B patch T1 10 (44200966) | SY | 71 | $185.00 | $300.00 | $200.00 |
| 64 | CL B patch T2 10 (44200970) | SY | 163 | $175.00 | $300.00 | $190.00 |
| 65 | CL B patch T3 10 (44200974) | SY | 153 | $165.00 | $300.00 | $175.00 |
| 66 | CL B patch T4 10 (44200976) | SY | 100 | $150.00 | $300.00 | $175.00 |
| 67 | Dowel bars 1 1/2 (44201299) | EACH | 1,263 | $17.00 | $25.00 | $18.00 |
| 68 | Saw cuts (44213200) | LF | 1,263 | $3.50 | $8.00 | $4.00 |
| 69 | Tie bars 1 1/4 (44213208) | EACH | 60 | $15.00 | $25.00 | $15.00 |
| 70 | Comb CC&G TB6.12 mod (60604100) | LF | 31 | $150.00 | $50.00 | $50.00 |
| 71 | Comb CC&G TB6.24 mod (60605300) | LF | 663 | $50.00 | $55.00 | $50.00 |
| 72 | Non SPL waste disposl (66900200) | CY | 215 | $75.00 | $80.00 | $75.00 |
| 73 | Soil disposal analy (66900530) | EACH | 1 | $2,100.00 | $1,585.00 | $1,750.00 |
| 74 | Reg sub P-const plan (66901001) | LS | 1 | $2,500.00 | $3,400.00 | $3,740.00 |
| 75 | Reg sub F con report (66901003) | LS | 1 | $2,300.00 | $500.00 | $550.00 |
| 76 | Reg sub mon (66901006) | CAL DAY | 20 | $1,000.00 | $700.00 | $800.00 |
| 77 | Mobilization (67100100) | LS | 1 | $92,875 | $124,362 | $130,250 |
| 78 | TR cont & prot 701606 (70102626) | EACH | 1 | $1.00 | $107,000 | $1.10 |
| 79 | TR cont & prot 701601 (70102630) | LS | 1 | $14,100 | $1.00 | $10,000 |
| 80 | TR cont & prot 701701 (70102635) | LS | 1 | $16,000 | $10,000 | $10,000 |
| 81 | TR cont & prot 701801 (70102640) | LS | 1 | $16,000 | $1.00 | $10,000 |
| 82 | Changeable message SN (70107025) | CAL DAY | 480 | $30.00 | $30.00 | $33.00 |
| 83 | Short term pavt mking (70300100) | LF | 25,096 | $0.01 | $0.01 | $1.60 |
| 84 | SHRT TRM pavt MK rem (70300150) | SF | 8,282 | $0.01 | $0.01 | $1.70 |
| 85 | Temp PVT MK LTR & sym paint (70300211) | SF | 2,293 | $0.21 | $0.01 | $0.30 |
| 86 | Temp PVT MK line 4 - paint (70300221) | LF | 28,606 | $0.31 | $0.01 | $0.35 |
| 87 | Temp PVT MK line 6 - paint (70300241) | LF | 8,541 | $0.61 | $0.01 | $0.70 |
| 88 | Temp PVT MK line 12 - paint (70300261) | LF | 3,588 | $1.25 | $0.01 | $1.40 |
| 89 | Temp PVT MK line 24 - paint (70300281) | LF | 678 | $1.25 | $0.01 | $1.50 |
| 90 | Sign panel T1 (72000100) | SF | 26 | $30.00 | $26.00 | $33.00 |
| 91 | Remov sin pan assy TA (72400100) | EACH | 8 | $75.00 | $125.00 | $115.50 |
| 92 | Reloc sin pan assy TA (72400500) | EACH | 5 | $175.00 | $150.00 | $165.00 |
| 93 | Teles STL sin support (72800100) | LF | 114 | $21.00 | $18.00 | $20.00 |
| 94 | Base tel STL sin supp (73100100) | EACH | 3 | $400.00 | $125.00 | $121.00 |
| 95 | THPL PVT MK LTR & sym (78000100) | SF | 255 | $5.50 | $6.00 | $6.00 |
| 96 | THPL PVT MK line 4 (78000200) | LF | 1,220 | $0.90 | $1.25 | $1.00 |
| 97 | THPL PVT MK line 6 (78000400) | LF | 770 | $1.35 | $2.00 | $1.50 |
| 98 | THPL PVT MK line 12 (78000600) | LF | 260 | $2.75 | $3.75 | $3.00 |
| 99 | THPL PVT MK line 24 (78000650) | LF | 58 | $5.50 | $6.00 | $6.00 |
| 100 | Mod ureth PM LTR-sym (78009000) | SF | 510 | $6.50 | $5.75 | $7.00 |
| 101 | Mod ureth PM line 4 (78009004) | LF | 8,316 | $0.67 | $1.15 | $0.75 |
| 102 | Mod ureth PM line 6 (78009006) | LF | 2,077 | $1.60 | $2.00 | $2.00 |
| 103 | Mod ureth PM line 12 (78009012) | LF | 936 | $3.25 | $3.00 | $3.60 |
| 104 | Mod ureth PM line 24 (78009024) | LF | 168 | $6.50 | $5.75 | $7.15 |
| 105 | Raised ref PVT MK rem (78300200) | EACH | 166 | $26.00 | $15.00 | $110.00 |
| 106 | Undrgrd C galvs 2 (81028200) | LF | 142 | $67.80 | $67.80 | $75.00 |
| 107 | Undrgrd C galvs 2 1/2 (81028210) | LF | 30 | $70.80 | $70.80 | $78.00 |
| 108 | Undrgrd C galvs 3 (81028220) | LF | 11 | $79.70 | $79.70 | $88.00 |
| 109 | HD handhole (81400200) | EACH | 2 | $5,105.00 | $5,105.00 | $5,720.00 |
| 110 | UD 3#4#4GXLPUSE 1 1/4 (81603085) | LF | 491 | $27.10 | $27.10 | $30.80 |
| 111 | Light pole FDN 24D (83600200) | LF | 10 | $297.80 | $297.80 | $330.00 |
| 112 | Rem pole FDN (84200804) | EACH | 3 | $960.00 | $960.00 | $1,056.00 |
| 113 | Reloc EX LT unit (84400105) | EACH | 3 | $4,300.00 | $4,300.00 | $4,730.00 |
| 114 | Main EX TR sig instal (85000200) | EACH | 1 | $6,400.00 | $6,400.00 | $7,150.00 |
| 115 | Elcbl C lead 14 1PR (87301305) | LF | 5,799 | $3.30 | $2.80 | $3.00 |
| 116 | Elcbl C egrdc 6 1C (87301900) | LF | 42 | $3.80 | $3.80 | $4.20 |
| 117 | Conc FDN TY A (87800100) | LF | 4 | $417.80 | $417.80 | $462.00 |
| 118 | Drill EX handhole (87900200) | EACH | 4 | $657.00 | $657.00 | $726.00 |
| 119 | Ped SH LED 1F BM CDT (88102717) | EACH | 8 | $654.00 | $654.00 | $726.00 |
| 120 | Det loop T1 (88600100) | LF | 1,304 | $24.80 | $24.80 | $29.00 |
| 121 | Reloc EX sig head (89500100) | EACH | 2 | $934.00 | $934.00 | $1,034.00 |
| 122 | Reloc EX TS post (89501150) | EACH | 1 | $737.00 | $737.00 | $814.00 |
| 123 | Rem elcbl FR con (89502300) | LF | 6,323 | $0.60 | $0.60 | $0.70 |
| 124 | Rem & RE elcbl FR con (89502350) | LF | 190 | $1.90 | $1.90 | $2.00 |
| 125 | Remov EX TS equip (89502375) | EACH | 1 | $2,560.00 | $2,560.00 | $2,860.00 |
| 126 | Remov EX handhole (89502380) | EACH | 2 | $640.00 | $640.00 | $715.00 |
| 127 | Remov EX conc FDN (89502385) | EACH | 2 | $640.00 | $640.00 | $715.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.