IDOT contract 61L78 bid tabulation
Elmhurst, section 22-00204-00-RS. Let by Illinois DOT on November 7, 2025, Dupage, District 01. 6 bids received; low bid $1,308,888 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 85
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $1,308,888 | Low |
| 2 | Builders Paving, LLC | $1,365,675 | +4.0% |
| 3 | K-Five Construction Corporation | $1,399,726 | +7.0% |
| 4 | R. W. Dunteman Company | $1,497,609 | +14% |
| 5 | Schroeder Asphalt Services, Inc. | $1,585,909 | +21% |
| 6 | Everlast Blacktop Inc. | $1,623,248 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. Builders Paving, LLC | 3. K-Five Construction Corporation | 4. R. W. Dunteman Company | 5. Schroeder Asphalt Services, Inc. | 6. Everlast Blacktop Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | P PL ornament T gal P (K0012990) | UNIT | 2 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,700.00 | $3,000.00 |
| 2 | Mulch placement 2 (K0036117) | SY | 258 | $8.00 | $8.00 | $8.00 | $8.00 | $7.00 | $10.00 |
| 3 | Pavement marking SPL (XX008910) | SF | 1,332 | $26.95 | $27.00 | $27.00 | $26.95 | $30.00 | $6.00 |
| 4 | Constructn layout SPL (X0320050) | LS | 1 | $6,500.00 | $6,500.00 | $4,800.00 | $12,000 | $10,000 | $14,000 |
| 5 | Washout basin (X0326806) | LS | 1 | $1,000.00 | $1,020.00 | $1,000.00 | $3,000.00 | $2,000.00 | $1,000.00 |
| 6 | Sawcut & seal new JTS (X0327771) | LF | 20,000 | $3.98 | $3.98 | $3.30 | $4.31 | $5.00 | $9.20 |
| 7 | Brick pavers (X0540000) | SF | 1,057 | $15.00 | $15.00 | $15.00 | $15.00 | $33.00 | $30.00 |
| 8 | Temp access- com ent (X4022000) | EACH | 7 | $500.00 | $185.00 | $100.00 | $484.62 | $250.00 | $2,000.00 |
| 9 | Detectable warn SPL (X4240800) | SF | 176 | $50.00 | $15.00 | $25.00 | $64.06 | $55.00 | $69.00 |
| 10 | Crack routing/filling (X4510100) | LB | 348 | $3.90 | $3.90 | $4.00 | $7.09 | $4.25 | $98.00 |
| 11 | Sanitary manhole adj (X6026050) | EACH | 3 | $1,200.00 | $1,485.00 | $1,485.00 | $1,485.00 | $1,600.00 | $1,200.00 |
| 12 | FR & lids adjust SPL (X6030310) | EACH | 38 | $1,075.00 | $1,150.00 | $1,150.00 | $1,150.00 | $1,250.00 | $950.00 |
| 13 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $1,500.00 | $4,000.00 | $3,500.00 | $3,500.00 | $4,000.00 | $3,200.00 |
| 14 | Temp info signing (X7200061) | SF | 94 | $20.00 | $15.00 | $14.00 | $15.00 | $20.00 | $40.00 |
| 15 | Handhole to BE adjust (X8140115) | EACH | 4 | $1,850.00 | $1,850.00 | $1,850.00 | $3,105.00 | $6,000.00 | $3,400.00 |
| 16 | DBL handhole adjust (X8140116) | EACH | 1 | $2,650.00 | $2,650.00 | $2,650.00 | $4,167.00 | $9,000.00 | $4,200.00 |
| 17 | Det loop repl (X8860105) | LF | 500 | $32.10 | $32.10 | $32.10 | $55.00 | $53.00 | $55.00 |
| 18 | Vid veh det sys complete (X8891007) | EACH | 1 | $34,200 | $34,200 | $34,200 | $31,247 | $31,000 | $34,500 |
| 19 | Drain STR reconst SPL (Z0018200) | EACH | 2 | $3,150.00 | $1,450.00 | $1,450.00 | $1,450.00 | $1,600.00 | $3,800.00 |
| 20 | Drainage STR repair (Z0018300) | EACH | 10 | $700.00 | $425.00 | $425.00 | $425.00 | $475.00 | $1,900.00 |
| 21 | Temp pavemt var depth (Z0062458) | TON | 25 | $133.00 | $235.00 | $221.00 | $189.59 | $90.00 | $300.00 |
| 22 | Temporary fence (20101000) | LF | 1,984 | $5.00 | $2.85 | $3.10 | $3.10 | $6.00 | $2.80 |
| 23 | Tree root pruning (20101200) | EACH | 62 | $120.00 | $205.00 | $103.00 | $103.00 | $130.00 | $160.00 |
| 24 | Earth excavation (20200100) | CY | 100 | $72.00 | $40.00 | $40.00 | $48.10 | $95.00 | $50.00 |
| 25 | Rem & disp uns matl (20201200) | CY | 116 | $71.00 | $78.50 | $150.00 | $85.25 | $95.00 | $50.00 |
| 26 | Geotech fab F/GR stab (21001000) | SY | 250 | $2.00 | $3.25 | $0.01 | $3.39 | $7.00 | $2.00 |
| 27 | Topsoil F & P 4 (21101615) | SY | 1,984 | $6.00 | $6.00 | $6.00 | $6.00 | $11.00 | $6.50 |
| 28 | Sodding salt tolerant (25200110) | SY | 1,984 | $14.00 | $14.00 | $14.00 | $14.00 | $20.00 | $16.00 |
| 29 | Supple watering (25200200) | UNIT | 108 | $1.00 | $1.00 | $1.00 | $1.00 | $50.00 | $2.00 |
| 30 | Inlet filters (28000510) | EACH | 27 | $15.00 | $185.00 | $185.00 | $180.00 | $200.00 | $190.00 |
| 31 | Agg subgrade improve (30300001) | CY | 500 | $25.00 | $30.00 | $0.01 | $60.37 | $85.00 | $68.00 |
| 32 | Agg base cse B 4 (35101600) | SY | 614 | $10.75 | $1.00 | $1.00 | $12.45 | $17.00 | $6.60 |
| 33 | PCC base course 4" (35300060) | SY | 57 | $96.00 | $130.00 | $130.00 | $91.31 | $132.00 | $150.00 |
| 34 | HMA base cse 8 (35501316) | SY | 296 | $64.00 | $127.50 | $81.00 | $73.70 | $120.00 | $73.00 |
| 35 | Bit matls tack CT (40600290) | LB | 9,393 | $0.01 | $0.10 | $0.01 | $0.93 | $0.01 | $0.01 |
| 36 | Long joint sealant (40600370) | LF | 6,552 | $3.27 | $3.50 | $3.55 | $3.74 | $4.50 | $3.45 |
| 37 | Mix CR JTS flangewys (40600400) | TON | 21 | $325.00 | $450.00 | $600.00 | $401.85 | $400.00 | $190.00 |
| 38 | HMA surf rem butt JT (40600982) | SY | 121 | $18.00 | $35.00 | $50.00 | $27.10 | $35.00 | $32.00 |
| 39 | P HMA BC IL-4.75 N50 (40603200) | TON | 743 | $134.00 | $145.00 | $128.00 | $117.24 | $135.00 | $99.00 |
| 40 | HMA SC IL-9.5 D N50 (40604060) | TON | 33 | $133.00 | $380.00 | $187.00 | $153.44 | $104.00 | $120.00 |
| 41 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,506 | $101.00 | $130.00 | $92.00 | $100.30 | $104.00 | $91.50 |
| 42 | Protective coat (42001300) | SY | 681 | $0.01 | $0.01 | $0.01 | $0.75 | $1.00 | $3.00 |
| 43 | PCC driveway pavt 8 (42300400) | SY | 92 | $135.00 | $160.00 | $160.00 | $79.62 | $132.00 | $104.00 |
| 44 | PC conc sidewalk 5 (42400200) | SF | 5,249 | $9.00 | $14.50 | $14.50 | $8.38 | $10.50 | $11.00 |
| 45 | PC conc sidewalk 8 (42400410) | SF | 415 | $13.25 | $18.50 | $18.50 | $11.05 | $17.00 | $12.00 |
| 46 | Detectable warnings (42400800) | SF | 100 | $35.00 | $35.00 | $35.00 | $39.33 | $55.00 | $60.00 |
| 47 | HMA surf rem 3 (44000161) | SY | 13,581 | $3.50 | $6.50 | $4.75 | $8.10 | $3.15 | $2.70 |
| 48 | Drive pavement rem (44000200) | SY | 365 | $18.25 | $20.00 | $38.00 | $22.88 | $13.00 | $16.00 |
| 49 | Comb curb gutter rem (44000500) | LF | 895 | $7.25 | $10.00 | $10.00 | $13.17 | $13.00 | $8.00 |
| 50 | Sidewalk rem (44000600) | SF | 5,249 | $1.00 | $2.50 | $2.50 | $1.95 | $2.25 | $2.00 |
| 51 | CL B patch T1 6 (44200901) | SY | 15 | $150.00 | $120.00 | $120.00 | $262.24 | $275.00 | $190.00 |
| 52 | CL B patch T2 6 (44200905) | SY | 15 | $150.00 | $120.00 | $120.00 | $255.37 | $275.00 | $190.00 |
| 53 | CL B patch T3 6 (44200909) | SY | 15 | $150.00 | $120.00 | $120.00 | $241.63 | $275.00 | $190.00 |
| 54 | CL B patch T4 6 (44200911) | SY | 15 | $150.00 | $120.00 | $120.00 | $241.63 | $275.00 | $190.00 |
| 55 | Dowel bars 1 (44201297) | EACH | 20 | $20.00 | $5.00 | $5.00 | $26.79 | $10.00 | $20.00 |
| 56 | CL D patch T1 6 (44201713) | SY | 550 | $30.00 | $28.00 | $30.00 | $82.10 | $64.00 | $57.00 |
| 57 | CL D patch T2 6 (44201717) | SY | 550 | $30.00 | $26.00 | $30.00 | $77.31 | $62.00 | $57.00 |
| 58 | CL D patch T3 6 (44201721) | SY | 550 | $30.00 | $24.00 | $30.00 | $72.51 | $60.00 | $57.00 |
| 59 | CL D patch T4 6 (44201723) | SY | 550 | $30.00 | $22.00 | $30.00 | $67.72 | $58.00 | $57.00 |
| 60 | Man TA 4 dia T24F&G (60219540) | EACH | 3 | $6,350.00 | $8,950.00 | $8,950.00 | $8,950.00 | $9,800.00 | $4,200.00 |
| 61 | Remov manholes (60500040) | EACH | 3 | $1,050.00 | $350.00 | $350.00 | $350.00 | $385.00 | $400.00 |
| 62 | Comb CC&G TY B-6.24 (60605000) | LF | 895 | $51.00 | $65.00 | $65.00 | $36.83 | $45.00 | $42.00 |
| 63 | Non SPL waste disposl (66900200) | CY | 100 | $58.00 | $100.00 | $95.00 | $109.26 | $170.00 | $80.00 |
| 64 | Soil disposal analy (66900530) | EACH | 3 | $625.00 | $625.00 | $1,500.00 | $625.00 | $700.00 | $2,150.00 |
| 65 | Reg sub P-const plan (66901001) | LS | 1 | $5,800.00 | $5,800.00 | $3,100.00 | $5,800.00 | $6,500.00 | $4,500.00 |
| 66 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $1,500.00 | $500.00 | $550.00 | $3,200.00 |
| 67 | Reg sub mon (66901006) | CAL DAY | 5 | $700.00 | $700.00 | $720.00 | $700.00 | $775.00 | $1,250.00 |
| 68 | Mobilization (67100100) | LS | 1 | $80,000 | $79,003 | $75,000 | $89,436 | $50,000 | $94,000 |
| 69 | TR cont & prot 701606 (70102625) | LS | 1 | $137,000 | $17,250 | $185,000 | $47,103 | $20,000 | $140,000 |
| 70 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $10,000 | $1,000.00 |
| 71 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $5,000.00 | $2,000.00 |
| 72 | Changeable message SN (70107025) | CAL DAY | 420 | $49.12 | $35.00 | $30.00 | $35.00 | $40.00 | $33.00 |
| 73 | Short term pavt mking (70300100) | LF | 12,445 | $0.46 | $0.01 | $0.85 | $1.04 | $3.50 | $1.00 |
| 74 | SHRT TRM pavt MK rem (70300150) | SF | 4,710 | $0.55 | $0.01 | $0.01 | $1.20 | $3.50 | $1.00 |
| 75 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 150 | $4.13 | $0.01 | $4.00 | $10.00 | $8.00 | $11.00 |
| 76 | Temp PVT MK L4 T4 tape (70307120) | LF | 10,521 | $1.32 | $0.01 | $1.30 | $1.30 | $1.50 | $2.00 |
| 77 | THPL PVT MK LTR & sym (78000100) | SF | 255 | $7.00 | $9.00 | $7.00 | $10.00 | $11.00 | $10.00 |
| 78 | THPL PVT MK line 6 (78000400) | LF | 648 | $1.00 | $2.25 | $1.00 | $1.05 | $1.25 | $2.20 |
| 79 | THPL PVT MK line 12 (78000600) | LF | 150 | $3.00 | $4.50 | $3.00 | $2.20 | $2.50 | $5.00 |
| 80 | THPL PVT MK line 24 (78000650) | LF | 173 | $6.00 | $9.00 | $6.00 | $9.00 | $10.00 | $10.00 |
| 81 | Epoxy PVT MK line 4 (78005110) | LF | 10,521 | $1.00 | $0.85 | $1.00 | $0.68 | $0.75 | $1.00 |
| 82 | Epoxy PVT MK line 6 (78005130) | LF | 473 | $2.00 | $1.50 | $2.00 | $1.30 | $1.50 | $2.00 |
| 83 | GRV RCSD PVT MRKG 5 (78011025) | LF | 10,521 | $0.45 | $0.65 | $0.45 | $0.45 | $0.50 | $1.00 |
| 84 | GRV RCSD PVT MRKG 7 (78011035) | LF | 473 | $0.80 | $0.90 | $0.80 | $0.65 | $0.75 | $1.00 |
| 85 | Undrgrd C PVC 2 (81028350) | LF | 1,000 | $28.20 | $28.20 | $3.50 | $48.43 | $61.00 | $52.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.