IDOT contract 62G52 bid tabulation
Section 2018-039-RS. Let by Illinois DOT on June 13, 2025, Will, District 01. 6 bids received; low bid $3,382,064 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 65
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $3,382,064 | Low |
| 2 | Builders Paving, LLC | $3,756,280 | +11% |
| 3 | Gallagher Asphalt Corporation | $3,788,246 | +12% |
| 4 | Austin Tyler Construction, Inc. | $4,048,601 | +20% |
| 5 | P. T. Ferro Construction Co. | $4,293,213 | +27% |
| 6 | R. W. Dunteman Company | $4,527,021 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Builders Paving, LLC | 3. Gallagher Asphalt Corporation | 4. Austin Tyler Construction, Inc. | 5. P. T. Ferro Construction Co. | 6. R. W. Dunteman Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 41 | $100.00 | $93.00 | $200.00 | $165.00 | $0.01 | $208.66 |
| 2 | Temporary ramp SPL (X4060995) | SY | 460 | $14.00 | $42.00 | $60.00 | $0.01 | $0.01 | $12.14 |
| 3 | CC&G RMVL repl < = 10 (X4400501) | LF | 40 | $200.00 | $150.00 | $260.00 | $108.00 | $100.00 | $265.00 |
| 4 | CC&G RMVL repl > 10FT (X4400503) | LF | 80 | $145.00 | $150.00 | $157.00 | $97.00 | $100.00 | $250.00 |
| 5 | SS cleaned 12 (X5537800) | LF | 450 | $3.00 | $15.00 | $3.25 | $15.00 | $3.00 | $15.00 |
| 6 | FR & lids adjust SPL (X6030310) | EACH | 21 | $1,285.00 | $1,285.00 | $1,285.00 | $1,200.00 | $1,000.00 | $1,285.00 |
| 7 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,300.00 | $2,350.00 | $500.00 | $4,500.00 | $1.00 | $3,000.00 |
| 8 | Temp info signing (X7200061) | SF | 308.40 | $16.00 | $15.00 | $18.00 | $14.00 | $15.00 | $16.00 |
| 9 | Intercept EX conduit (X8100863) | EACH | 1 | $745.45 | $745.00 | $800.00 | $500.00 | $500.00 | $770.64 |
| 10 | Det loop repl (X8860105) | LF | 2,892 | $29.51 | $30.00 | $31.00 | $30.00 | $30.00 | $30.51 |
| 11 | Vid veh det sys SN AP (X8891009) | EACH | 3 | $9,722.71 | $9,725.00 | $10,500 | $12,000 | $12,000 | $10,051 |
| 12 | Drainage STR cleaned (Z0018500) | EACH | 30 | $465.00 | $800.00 | $400.00 | $800.00 | $465.00 | $800.00 |
| 13 | Tree remov 6-15 (20100110) | UNIT | 40 | $35.00 | $59.00 | $59.00 | $38.00 | $35.00 | $35.00 |
| 14 | Tree prun over 10 (20101350) | EACH | 8 | $38.00 | $200.00 | $200.00 | $35.00 | $38.00 | $38.00 |
| 15 | Topsoil F & P 4 (21101615) | SY | 30 | $75.00 | $65.00 | $60.00 | $65.00 | $10.00 | $65.00 |
| 16 | Sodding salt tolerant (25200110) | SY | 30 | $75.00 | $160.00 | $70.00 | $160.00 | $240.00 | $160.00 |
| 17 | Bit matls tack CT (40600290) | LB | 49,185 | $0.01 | $1.00 | $0.01 | $0.01 | $0.01 | $0.97 |
| 18 | Long joint sealant (40600370) | LF | 43,895 | $2.60 | $3.00 | $3.00 | $3.50 | $3.50 | $2.43 |
| 19 | Mix CR JTS flangewys (40600400) | TON | 109 | $50.00 | $350.00 | $50.00 | $300.00 | $0.01 | $362.23 |
| 20 | HMA surf rem butt JT (40600982) | SY | 410 | $0.01 | $25.00 | $0.01 | $20.00 | $0.01 | $10.00 |
| 21 | HMA repl over patch (40601005) | TON | 2,755 | $57.00 | $65.00 | $80.00 | $120.00 | $90.00 | $139.55 |
| 22 | P HMA BC IL19.0 N90 (40603240) | TON | 9,125 | $88.00 | $70.00 | $105.00 | $95.00 | $85.00 | $102.11 |
| 23 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 7,096 | $121.00 | $105.00 | $140.00 | $120.00 | $110.00 | $123.92 |
| 24 | Protective coat (42001300) | SY | 40 | $1.00 | $15.00 | $3.00 | $5.00 | $10.00 | $1.00 |
| 25 | HMA surf rem 4 (44000165) | SY | 72,400 | $4.75 | $10.00 | $5.70 | $4.00 | $6.00 | $5.93 |
| 26 | HMA RM OV patch 7 1/2 (44002230) | SY | 6,550 | $0.01 | $15.00 | $15.00 | $33.50 | $10.00 | $35.34 |
| 27 | CL D patch T2 9 (44201753) | SY | 580 | $28.50 | $50.00 | $40.00 | $93.00 | $80.00 | $121.64 |
| 28 | CL D patch T3 9 (44201757) | SY | 2,900 | $28.50 | $45.00 | $35.00 | $88.50 | $80.00 | $112.69 |
| 29 | CL D patch T4 9 (44201759) | SY | 2,320 | $28.50 | $40.00 | $35.00 | $82.00 | $80.00 | $109.01 |
| 30 | Agg wedge SHLD type B (48102100) | TON | 139 | $60.50 | $55.00 | $125.00 | $38.00 | $60.00 | $45.37 |
| 31 | CB adjust (60250200) | EACH | 4 | $550.00 | $550.00 | $600.00 | $750.00 | $500.00 | $550.00 |
| 32 | CB reconst (60252800) | EACH | 4 | $1,650.00 | $1,650.00 | $1,700.00 | $1,350.00 | $500.00 | $1,650.00 |
| 33 | Man adjust (60255500) | EACH | 1 | $550.00 | $550.00 | $600.00 | $750.00 | $1,000.00 | $550.00 |
| 34 | Inlets adjust (60260100) | EACH | 1 | $550.00 | $550.00 | $600.00 | $750.00 | $500.00 | $550.00 |
| 35 | FR & grates adjust (60300105) | EACH | 3 | $550.00 | $550.00 | $600.00 | $750.00 | $1,000.00 | $550.00 |
| 36 | FR & lids adjust (60300305) | EACH | 4 | $550.00 | $550.00 | $600.00 | $750.00 | $1,000.00 | $550.00 |
| 37 | Pipe culv cleaned 18 (60920018) | LF | 84 | $28.00 | $50.00 | $3.50 | $60.00 | $28.00 | $50.00 |
| 38 | Mobilization (67100100) | LS | 1 | $204,277 | $365,700 | $227,000 | $219,000 | $257,000 | $246,838 |
| 39 | TR cont & prot 701606 (70102625) | LS | 1 | $287,156 | $2,995.00 | $28,000 | $500.00 | $2,995.00 | $45,821 |
| 40 | TR cont & prot 701601 (70102630) | LS | 1 | $3,500.00 | $2,995.00 | $1.00 | $5,500.00 | $2,995.00 | $3,500.00 |
| 41 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $2,995.00 | $1.00 | $5,500.00 | $685,000 | $1.00 |
| 42 | TR cont & prot 701701 (70102635) | LS | 1 | $5,000.00 | $2,995.00 | $1.00 | $11,500 | $2,995.00 | $5,000.00 |
| 43 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $2,995.00 | $1,500.00 | $100.00 | $2,995.00 | $1.00 |
| 44 | Short term pavt mking (70300100) | LF | 21,805 | $1.00 | $1.00 | $0.80 | $1.20 | $0.01 | $1.29 |
| 45 | SHRT TRM pavt MK rem (70300150) | SF | 2,960 | $2.00 | $0.05 | $3.00 | $1.00 | $0.01 | $2.29 |
| 46 | Temp PVT MK LTR & sym paint (70300211) | SF | 3,985 | $0.01 | $1.75 | $1.45 | $2.10 | $1.75 | $1.25 |
| 47 | Temp PVT MK line 4 - paint (70300221) | LF | 83,580 | $0.01 | $0.35 | $0.32 | $0.35 | $0.35 | $0.25 |
| 48 | Temp PVT MK line 6 - paint (70300241) | LF | 22,110 | $0.01 | $0.50 | $0.48 | $0.55 | $0.53 | $0.35 |
| 49 | Temp PVT MK line 8 - paint (70300251) | LF | 840 | $0.01 | $0.70 | $1.25 | $0.85 | $0.70 | $0.50 |
| 50 | Temp PVT MK line 12 - paint (70300261) | LF | 4,935 | $0.01 | $1.00 | $1.25 | $1.05 | $1.06 | $0.80 |
| 51 | Temp PVT MK line 24 - paint (70300281) | LF | 2,235 | $0.01 | $1.60 | $1.40 | $2.10 | $1.60 | $1.25 |
| 52 | Temp PVT MK L4 T4 tape (70307120) | LF | 5,455 | $2.15 | $1.95 | $1.32 | $2.50 | $1.25 | $2.00 |
| 53 | THPL PVT MK LTR & sym (78000100) | SF | 1,330 | $4.00 | $4.00 | $6.00 | $4.00 | $4.00 | $4.00 |
| 54 | THPL PVT MK line 4 (78000200) | LF | 27,860 | $0.99 | $1.00 | $0.92 | $0.99 | $0.99 | $0.99 |
| 55 | THPL PVT MK line 6 (78000400) | LF | 7,370 | $1.53 | $1.50 | $1.50 | $1.53 | $1.53 | $1.53 |
| 56 | THPL PVT MK line 8 (78000500) | LF | 280 | $2.05 | $2.05 | $1.75 | $2.05 | $2.05 | $2.05 |
| 57 | THPL PVT MK line 12 (78000600) | LF | 1,645 | $3.07 | $3.05 | $3.00 | $3.07 | $3.07 | $3.07 |
| 58 | THPL PVT MK line 24 (78000650) | LF | 745 | $6.14 | $6.15 | $6.00 | $6.14 | $6.14 | $6.14 |
| 59 | Raised refl pavt MKR (78100100) | EACH | 1,129 | $29.50 | $29.50 | $50.00 | $29.50 | $29.50 | $29.50 |
| 60 | Raised ref PVT MK rem (78300200) | EACH | 1,129 | $9.00 | $12.50 | $0.01 | $13.50 | $0.01 | $15.85 |
| 61 | Undrgrd C galvs 2 (81028200) | LF | 71 | $53.69 | $54.00 | $56.00 | $70.00 | $70.00 | $55.50 |
| 62 | HD handhole (81400200) | EACH | 5 | $4,285.45 | $4,300.00 | $4,500.00 | $5,000.00 | $5,000.00 | $4,430.28 |
| 63 | Main EX TR sig instal (85000200) | EACH | 2 | $525.00 | $525.00 | $550.00 | $2,500.00 | $2,500.00 | $542.74 |
| 64 | Drill EX HD handhole (87900205) | EACH | 3 | $938.93 | $940.00 | $1,000.00 | $2,000.00 | $2,000.00 | $970.66 |
| 65 | Remov EX handhole (89502380) | EACH | 5 | $717.95 | $720.00 | $750.00 | $3,000.00 | $3,000.00 | $742.21 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.