IDOT contract 62X34 bid tabulation

Section 2024-1000-RS,SW. Let by Illinois DOT on June 13, 2025, Will, District 01. 5 bids received; low bid $1,353,712 by Iroquois Paving Corporation.

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
83
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Iroquois Paving Corporation$1,353,712Low
2Gallagher Asphalt Corporation$1,494,778+10%
3D. Construction, Inc.$1,499,697+11%
4Austin Tyler Construction, Inc.$1,636,840+21%
5P. T. Ferro Construction Co.$1,648,804+22%
IDOT contract 62X34: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Iroquois Paving Corporation2. Gallagher Asphalt Corporation3. D. Construction, Inc.4. Austin Tyler Construction, Inc.5. P. T. Ferro Construction Co.
1Tree care (K0026700)EACH20$152.05$150.00$165.00$150.00$800.00
2Weed control teasel (K0029624)GAL1$5,050.00$5,000.00$2,750.00$2,500.00$10,000
3Constructn layout SPL (X0320050)LS1$3,550.00$5,000.00$5,000.00$2,800.00$10,000
4Weed cont basal TRTMT (X0325222)GAL30$610.00$600.00$1,485.00$1,350.00$325.00
5Ped signal post 10 FT (X1400367)EACH3$1,910.00$2,000.00$2,310.00$2,100.00$2,100.00
6Grading & shap SHLDRS (X2020110)UNIT222$11.00$94.00$11.00$89.00$0.01
7CC&G RMVL repl < = 10 (X4400501)LF15$90.00$100.00$82.50$88.00$200.00
8CC&G RMVL repl > 10FT (X4400503)LF335$80.00$60.00$74.80$57.00$65.00
9SS cleaned 12 (X5537800)LF30$15.25$47.00$30.00$15.00$15.00
10Engrs FLD ofc TY A D1 (X6700407)CAL MO12$0.01$500.00$4,500.00$3,000.00$1.00
11Temp info signing (X7200061)SF105$32.00$16.20$25.00$30.00$20.00
12Rebld EX DBL handhole (X8140238)EACH2$2,400.00$2,500.00$4,950.00$4,500.00$4,500.00
13Accessible ped signal (X8760200)EACH12$1,850.00$1,900.00$2,090.00$1,900.00$1,900.00
14Conc FDN TY A 12D (X8780012)LF12$500.00$530.00$440.00$400.00$400.00
15Drainage STR cleaned (Z0018500)EACH2$1,525.00$1,080.00$600.00$1,000.00$1,000.00
16RE-optimize TR sig sys 1 (Z0033044)EACH1$1,295.00$1,375.00$1,650.00$1,500.00$1,500.00
17RR prot liability ins (Z0048665)LS1$5,500.00$5,000.00$4,000.00$6,000.00$7,500.00
18Tree prun 1-10 (20101300)EACH5$105.00$240.00$110.00$220.00$100.00
19Tree prun over 10 (20101350)EACH10$155.00$240.00$165.00$330.00$150.00
20Earth excavation (20200100)CY25$80.00$100.00$66.00$88.00$100.00
21Topsoil F & P 4 (21101615)SY124$15.50$16.00$36.30$33.00$20.00
22Nitrogen fert nutr (25000400)LB1.50$2.50$105.00$5.50$5.00$150.00
23Phosphorus fert nutr (25000500)LB1.50$2.50$105.00$5.50$5.00$150.00
24Potassium fert nutr (25000600)LB1.50$2.50$105.00$5.50$5.00$150.00
25Interseed CL 2A (25003210)ACRE1$1,825.00$1,900.00$4,356.00$3,960.00$3,500.00
26Sodding salt tolerant (25200110)SY124$32.00$16.00$69.30$63.00$50.00
27Supple watering (25200200)UNIT1.20$1,025.00$1,000.00$5.50$5.00$250.00
28Bit matls tack CT (40600290)LB27,449$0.01$0.01$0.01$0.01$0.01
29Long joint sealant (40600370)LF13,256$3.00$2.95$3.12$3.60$4.00
30Mix CR JTS flangewys (40600400)TON61$0.01$50.00$0.01$150.00$0.01
31HMA surf rem butt JT (40600982)SY261$0.01$1.00$0.01$15.00$0.01
32HMA BC IL-9.5 N70 (40602985)TON4,526$81.50$84.50$69.00$77.00$80.00
33HMA SC IL-9.5 D N70 (40604062)TON3,960$84.00$85.50$72.00$79.00$80.00
34Protective coat (42001300)SY207$3.05$2.10$3.30$5.00$3.00
35PC conc sidewalk 5 (42400200)SF1,865$13.50$13.90$12.65$10.00$13.00
36Detectable warnings (42400800)SF275$32.00$28.00$33.00$26.00$20.00
37HMA surf rem 3 3/4 (44000164)SY40,403$4.00$3.15$3.10$4.00$5.00
38Sidewalk rem (44000600)SF1,865$2.05$3.25$1.65$5.00$2.75
39CL D patch T2 12 (44201789)SY120$35.00$95.00$117.00$109.00$125.00
40CL D patch T3 12 (44201794)SY320$35.00$85.00$117.00$108.00$115.00
41CL D patch T4 12 (44201796)SY620$35.00$73.00$117.00$103.00$100.00
42Agg wedge SHLD type B (48102100)TON755$42.00$50.00$30.00$42.00$35.00
43Man adjust (60255500)EACH2$500.00$900.00$1,000.00$750.00$1,000.00
44FR & lids adjust (60300305)EACH2$500.00$900.00$800.00$750.00$1,000.00
45Non SPL waste disposl (66900200)CY25$150.00$108.00$100.00$280.00$100.00
46Soil disposal analy (66900530)EACH1$2,100.00$2,100.00$1,650.00$1,980.00$1,980.00
47Reg sub P-const plan (66901001)LS1$2,800.00$2,900.00$2,250.00$2,700.00$2,700.00
48Reg sub F con report (66901003)LS1$2,400.00$2,400.00$2,250.00$2,300.00$2,300.00
49Reg sub mon (66901006)CAL DAY5$1,025.00$1,050.00$1,000.00$1,000.00$1,000.00
50Mobilization (67100100)LS1$70,000$88,000$66,413$73,800$98,000
51Traf cont-prot 701306 (70100460)LS1$4,000.00$1,700.00$108,315$100.00$100.00
52TR cont & prot 701501 (70102620)LS1$1.00$56,295$0.01$4,500.00$46,800
53TR cont & prot 701701 (70102635)LS1$1.00$550.00$0.01$100.00$100.00
54TR cont & prot 701801 (70102640)LS1$1.00$2,250.00$0.01$1,300.00$100.00
55Short term pavt mking (70300100)LF11,300$0.01$0.01$0.01$1.90$0.01
56SHRT TRM pavt MK rem (70300150)SF4,475$0.01$0.01$0.01$4.40$0.01
57Temp PVT MK LTR & sym paint (70300211)SF132$0.01$0.01$0.01$2.00$1.35
58Temp PVT MK line 4 - paint (70300221)LF39,174$0.01$0.01$0.01$0.34$0.45
59Temp PVT MK line 6 - paint (70300241)LF720$0.01$0.01$0.01$0.35$0.70
60Temp PVT MK line 8 - paint (70300251)LF30$0.01$0.01$0.01$0.70$0.90
61Temp PVT MK line 12 - paint (70300261)LF129$0.01$0.01$0.01$1.05$1.35
62Temp PVT MK line 24 - paint (70300281)LF264$0.01$0.01$0.01$2.10$2.70
63Temp PVT MK L4 T4 tape (70307120)LF39,174$0.01$0.01$0.01$1.40$1.25
64THPL PVT MK LTR & sym (78000100)SF132$5.35$5.65$5.78$5.00$5.25
65THPL PVT MK line 4 (78000200)LF39,174$0.75$0.65$0.80$0.94$0.60
66THPL PVT MK line 6 (78000400)LF720$1.10$1.10$1.32$1.46$1.05
67THPL PVT MK line 8 (78000500)LF31$1.40$1.45$1.65$1.94$1.35
68THPL PVT MK line 12 (78000600)LF130$2.55$2.70$2.42$2.91$2.50
69THPL PVT MK line 24 (78000650)LF264$5.35$5.70$5.78$5.83$5.25
70Raised refl pavt MKR (78100100)EACH463$40.00$41.00$44.55$45.10$39.00
71Raised ref PVT MK rem (78300200)EACH463$0.01$1.00$8.00$13.50$0.01
72PVT MKG rem WTR blast (78300202)SF14,118$0.01$0.45$0.01$1.05$3.00
73Undrgrd C galvs 2 (81028200)LF53$95.50$100.00$71.50$65.00$65.00
74Main EX TR sig instal (85000200)EACH1$2,540.00$2,700.00$2,200.00$2,000.00$2,000.00
75Elcbl C signal 14 2C (87301215)LF824$3.35$3.50$3.30$3.00$3.00
76Elcbl C signal 14 3C (87301225)LF1,232$3.70$3.90$3.58$3.25$3.25
77Elcbl C egrdc 6 1C (87301900)LF68$3.80$4.00$3.30$3.00$3.00
78Drill EX handhole (87900200)EACH3$370.00$394.00$660.00$600.00$600.00
79Ped SH LED 1F BM CDT (88102717)EACH12$675.00$700.00$770.00$700.00$700.00
80Det loop T1 (88600100)LF1,442$30.00$29.50$33.00$30.00$30.00
81Rem elcbl FR con (89502300)LF1,107$2.70$3.00$1.10$1.00$1.00
82Remov EX TS equip (89502375)EACH1$370.00$394.00$3,850.00$3,500.00$3,500.00
83Rebuild EX handhole (89502376)EACH1$1,875.00$1,950.00$5,500.00$5,000.00$5,000.00
IDOT contract 62X34: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy