IDOT contract 64T98 bid tabulation
Section (107BR-1)BDR. Let by Illinois DOT on June 13, 2025, Stephenson, District 02. 2 bids received; low bid $758,588 by Martin & Company Excavating.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 61
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martin & Company Excavating | $758,588 | Low |
| 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $918,613 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martin & Company Excavating | 2. Civil Constructors, Inc. d/b/a/ Helm Civil |
|---|---|---|---|---|---|
| 1 | LT WT cell conc fill (X0325318) | CY | 13 | $2,700.00 | $4,400.00 |
| 2 | Clearing special (X2010505) | LS | 1 | $3,500.00 | $11,800 |
| 3 | Remove exist riprap (X2810844) | SY | 16 | $200.00 | $390.00 |
| 4 | BR deck grooving long (X5030250) | SY | 355 | $36.00 | $20.00 |
| 5 | Grdrail refl TY C SPL (X7820007) | EACH | 8 | $25.00 | $22.00 |
| 6 | BR approach SHLD rem (Z0001495) | SY | 20 | $100.00 | $150.00 |
| 7 | Approach slab rem (Z0004552) | SY | 116 | $62.00 | $200.00 |
| 8 | BR DK LTX C oly 2 1/2 (Z0006014) | SY | 260 | $160.00 | $300.00 |
| 9 | BR deck scar 3/4 (Z0012130) | SY | 260 | $178.00 | $270.00 |
| 10 | Deck slab rep (FD-T1) (Z0016001) | SY | 3 | $750.00 | $2,200.00 |
| 11 | Deck slab rep (FD-T2) (Z0016002) | SY | 5 | $750.00 | $1,450.00 |
| 12 | Diamond grind BR sec (Z0029090) | SY | 422 | $35.00 | $30.00 |
| 13 | Exc & GR EX shoulder (20200600) | UNIT | 7 | $800.00 | $1,500.00 |
| 14 | Stone dump rip CL A5 (28100809) | TON | 296 | $225.00 | $180.00 |
| 15 | Filter fabric (28200200) | SY | 154 | $5.00 | $4.50 |
| 16 | Long joint sealant (40600370) | LF | 626 | $17.50 | $20.00 |
| 17 | HMA BC IL-19.0 N50 (40603080) | TON | 15 | $225.00 | $325.00 |
| 18 | HMA SC IL-9.5 C N50 (40604050) | TON | 47 | $225.00 | $325.00 |
| 19 | P bit matls tack CT (40800031) | LB | 478 | $1.00 | $1.00 |
| 20 | PVT con HMA BR app SL (42000070) | SY | 23 | $195.00 | $230.00 |
| 21 | Pavement rem (44000100) | SY | 104 | $20.00 | $150.00 |
| 22 | HMA surf rem 1 1/2 (44000155) | SY | 387 | $12.50 | $45.00 |
| 23 | Paved SHLD removal (44004250) | SY | 209 | $30.00 | $20.00 |
| 24 | Saw cuts (44213200) | LF | 632 | $7.50 | $1.60 |
| 25 | HMA shoulders 6 1/2 (48203023) | SY | 209 | $80.00 | $90.00 |
| 26 | Conc rem (50102400) | CY | 4 | $2,200.00 | $3,270.00 |
| 27 | Structure excavation (50200100) | CY | 75 | $48.00 | $80.00 |
| 28 | Conc struct (50300225) | CY | 27.40 | $1,175.00 | $1,550.00 |
| 29 | Protective coat (50300300) | SY | 430 | $3.00 | $1.00 |
| 30 | Conc supstr app slab (50301350) | CY | 96.80 | $750.00 | $800.00 |
| 31 | Reinf bars, epoxy CTD (50800205) | LB | 43,257 | $2.22 | $1.80 |
| 32 | Bar splicers (50800515) | EACH | 298 | $48.00 | $70.00 |
| 33 | Mechanical splicers (50800530) | EACH | 48 | $132.00 | $110.00 |
| 34 | Temp soil reten systm (52200020) | SF | 80 | $225.00 | $325.00 |
| 35 | Granular backfill STR (58600101) | CY | 77 | $38.00 | $120.00 |
| 36 | Epoxy crack injection (59000200) | LF | 50 | $175.00 | $80.00 |
| 37 | Geocomposite wall DR (59100100) | SY | 48 | $24.00 | $38.00 |
| 38 | P undr for struct 4 (60146304) | LF | 104 | $30.00 | $55.00 |
| 39 | SPBGR TY A 6FT posts (63000001) | LF | 287.50 | $37.00 | $32.11 |
| 40 | Traf bar term T6 (63100085) | EACH | 4 | $4,500.00 | $3,969.83 |
| 41 | TR bar TRM T1 SPL FLR (63100169) | EACH | 4 | $3,900.00 | $3,311.00 |
| 42 | Guardrail remov (63200310) | LF | 588 | $6.50 | $7.82 |
| 43 | Engr field office A (67000400) | CAL MO | 3 | $4,000.00 | $3,800.00 |
| 44 | Mobilization (67100100) | LS | 1 | $42,600 | $55,117 |
| 45 | Traf cont-prot 701321 (70100405) | EACH | 1 | $24,000 | $30,000 |
| 46 | Traf cont-prot 701201 (70100450) | LS | 1 | $125.00 | $100.00 |
| 47 | Traf cont-prot 701326 (70100500) | LS | 1 | $125.00 | $100.00 |
| 48 | TR cont surveillance (70103815) | CAL DAY | 6 | $600.00 | $450.00 |
| 49 | Temp BR traf signals (70106500) | EACH | 1 | $10,000 | $9,000.00 |
| 50 | Temp rumble strips (70106700) | EACH | 12 | $2.00 | $1.00 |
| 51 | Changeable message SN (70107025) | CAL DAY | 28 | $45.00 | $40.00 |
| 52 | SHRT TRM pavt MK rem (70300150) | SF | 782 | $1.40 | $1.20 |
| 53 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,196 | $1.45 | $1.25 |
| 54 | Temp PVT MK L24 T4 tape (70307210) | LF | 24 | $8.50 | $7.50 |
| 55 | Temp conc barrier (70400100) | LF | 418.11 | $35.00 | $29.00 |
| 56 | Rel temp conc barrier (70400200) | LF | 418.11 | $10.00 | $9.50 |
| 57 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $3,900.00 | $3,500.00 |
| 58 | Imp attn rel NRN TL3 (70600352) | EACH | 2 | $400.00 | $300.00 |
| 59 | Terminal marker - DA (72501000) | EACH | 4 | $45.00 | $35.00 |
| 60 | Paint PVT MK line 4 (78001110) | LF | 2,992 | $1.15 | $1.00 |
| 61 | PVT MKG rem WTR blast (78300202) | SF | 413 | $5.00 | $4.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.