IDOT contract 66H59 bid tabulation
Section (38-9,38-8,38-7)RS,RA,BRR. Let by Illinois DOT on June 13, 2025, Iroquois, District 03. 1 bid received; low bid $30,611,903 by Iroquois Paving Corporation.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 176
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iroquois Paving Corporation | $30,611,903 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iroquois Paving Corporation |
|---|---|---|---|---|
| 1 | Fountain removal (XZ004531) | LS | 1 | $3,500.00 |
| 2 | Constructn layout SPL (X0320050) | LS | 1 | $175,000 |
| 3 | Poly mod P C mortar (X0322194) | SF | 2 | $4,500.00 |
| 4 | Rodent shields (X0322278) | EACH | 40 | $195.00 |
| 5 | Clean reseal RLF JNT (X0326766) | LF | 121 | $105.00 |
| 6 | Grad & shap ditch SPL (X2020114) | LF | 11,215 | $28.50 |
| 7 | HMA stab 6IN at SPBGR (X4062952) | SY | 1,653 | $135.00 |
| 8 | HMA surf rem var DP (X4401198) | SY | 2,813 | $12.50 |
| 9 | SHLDR rem SPL (X4404262) | SY | 273 | $85.00 |
| 10 | Long par dep rem 2 (X4405020) | LF | 6,435 | $16.50 |
| 11 | Slope wall crack seal (X5110308) | LF | 214 | $85.00 |
| 12 | Slope wall repair (X5110310) | SY | 27 | $675.00 |
| 13 | Slopewall slur pumpng (X5110312) | CY | 26 | $425.00 |
| 14 | Mastic repairs for culverts (X5420150) | LS | 1 | $5,000.00 |
| 15 | Pipe underdrn rem SPL (X6013700) | LF | 425 | $61.00 |
| 16 | Rem conc HDWL P DRNS (X6015000) | EACH | 40 | $375.00 |
| 17 | Delineator removal (X6350120) | EACH | 280 | $55.00 |
| 18 | Linear delin panels 4 (X6350204) | EACH | 55 | $130.00 |
| 19 | Linear delin panels 6 (X6350206) | EACH | 4 | $140.00 |
| 20 | Fence removal (X6640104) | LF | 2,319 | $14.00 |
| 21 | Temp rumble strips SP (X7010118) | EACH | 8 | $3,600.00 |
| 22 | Changeable MSG SN SPL (X7010239) | CAL WK | 192 | $650.00 |
| 23 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $8,500.00 |
| 24 | Real-time TR CTRL SU (X7011858) | WEEK | 48 | $625.00 |
| 25 | Alternate rte signing (X7200202) | LS | 1 | $32,000 |
| 26 | Reloc sign panel&post (X7240505) | EACH | 4 | $2,250.00 |
| 27 | Smart traf monit sys (X8570002) | CAL WK | 48 | $1,100.00 |
| 28 | Smart traf monit dev (X8570004) | CAL WK | 240 | $225.00 |
| 29 | STR rep con DP = < 5 (Z0012754) | SF | 132 | $425.00 |
| 30 | Debris removal (Z0015500) | LS | 1 | $10,000 |
| 31 | Deck slab rep (FD-T1) (Z0016001) | SY | 2 | $6,500.00 |
| 32 | Deck slab rep (FD-T2) (Z0016002) | SY | 2 | $5,500.00 |
| 33 | Deck slab rep (part) (Z0016200) | SY | 6 | $1,450.00 |
| 34 | Drill-grout #6 T-bar (Z0018911) | EACH | 73 | $15.00 |
| 35 | Drill-grout #8 T-bar (Z0018913) | EACH | 4,355 | $18.00 |
| 36 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 |
| 37 | Earth excavation (20200100) | CY | 140 | $125.00 |
| 38 | Furnished excavation (20400800) | CY | 490 | $135.00 |
| 39 | Seeding CL 2A (25000210) | ACRE | 0.75 | $2,400.00 |
| 40 | Seeding CL 4B (25000314) | ACRE | 3.25 | $3,400.00 |
| 41 | Nitrogen fert nutr (25000400) | LB | 361 | $9.00 |
| 42 | Phosphorus fert nutr (25000500) | LB | 361 | $9.00 |
| 43 | Potassium fert nutr (25000600) | LB | 361 | $9.00 |
| 44 | Mulch method 2 (25100115) | ACRE | 4 | $1,500.00 |
| 45 | Temp ditch checks (28000305) | LF | 2,300 | $15.00 |
| 46 | Inlet filters (28000510) | EACH | 13 | $365.00 |
| 47 | Stone riprap CL A4 (28100107) | SY | 429 | $235.00 |
| 48 | Stone dump rip CL A3 (28100805) | TON | 20 | $130.00 |
| 49 | Filter fabric (28200200) | SY | 459 | $6.50 |
| 50 | Sub gran mat A 4 (31100300) | SY | 1,084 | $18.50 |
| 51 | Bit matls tack CT (40600290) | LB | 301,533 | $1.25 |
| 52 | Long joint sealant (40600370) | LF | 7,120 | $4.25 |
| 53 | LNG JNT SLNT half WD (40600372) | LF | 693,366 | $2.75 |
| 54 | Mix CR JTS flangewys (40600400) | TON | 0.40 | $1,000.00 |
| 55 | Matl transfer device (40600405) | TON | 64,862 | $15.00 |
| 56 | HMA surf rem butt JT (40600982) | SY | 1,432 | $28.00 |
| 57 | P HMA BC IL-4.75 N50 (40603200) | TON | 15,868 | $140.00 |
| 58 | P HMA BC IL-9.5 N90 (40603209) | TON | 23,302 | $130.00 |
| 59 | P HMA BC IL19.0 N70 (40603235) | TON | 24,747 | $130.00 |
| 60 | HMA SC IL-9.5 D N70 (40604062) | TON | 290 | $195.00 |
| 61 | P HMA SC IL-9.5 D N70 (40604162) | TON | 16,391 | $130.00 |
| 62 | P SC SMA 12.5 E N80 (40605034) | TON | 25,692 | $170.00 |
| 63 | Welded wire reinf (42000060) | SY | 317 | $6.25 |
| 64 | PC conc sidewalk 5 (42400200) | SF | 7,389 | $15.00 |
| 65 | Detectable warnings (42400800) | SF | 60 | $32.00 |
| 66 | HMA surf rem 2 (44000157) | SY | 72,394 | $4.75 |
| 67 | HMA surf rem 3 1/4 (44000162) | SY | 2,139 | $6.25 |
| 68 | HMA surf rem 5 (44000169) | SY | 222,918 | $7.75 |
| 69 | HMA surf rem 8 (44000182) | SY | 72,332 | $12.50 |
| 70 | Curb rem (44000300) | LF | 80 | $22.00 |
| 71 | Comb curb gutter rem (44000500) | LF | 1,421 | $22.00 |
| 72 | Sidewalk rem (44000600) | SF | 7,389 | $4.25 |
| 73 | CL A patch T2 13 (44200610) | SY | 1,255 | $360.00 |
| 74 | CL A patch T3 13 (44200612) | SY | 80 | $360.00 |
| 75 | CL A patch T4 13 (44200614) | SY | 380 | $360.00 |
| 76 | CL B patch T2 8 (44200934) | SY | 31 | $340.00 |
| 77 | CL B patch T3 8 (44200942) | SY | 38 | $340.00 |
| 78 | CL B patch T4 8 (44200944) | SY | 279 | $340.00 |
| 79 | Patch reinforcement (44213000) | SY | 1,715 | $55.00 |
| 80 | Saw cuts (44213200) | LF | 7,149 | $8.00 |
| 81 | Agg wedge SHLD type B (48102100) | TON | 3,332 | $70.00 |
| 82 | HMA shoulders 8 (48203029) | SY | 273 | $115.00 |
| 83 | Conc rem (50102400) | CY | 10.40 | $8,500.00 |
| 84 | Conc headwall removal (50104400) | EACH | 3 | $1,200.00 |
| 85 | Slope wall remov (50104650) | SY | 245 | $75.00 |
| 86 | Pipe culvert remov (50105220) | LF | 200 | $65.00 |
| 87 | Protective shield (50157300) | SY | 803 | $0.01 |
| 88 | Conc struct (50300225) | CY | 7.60 | $2,800.00 |
| 89 | Conc sup-STR (50300255) | CY | 9.70 | $6,500.00 |
| 90 | Protective coat (50300300) | SY | 70 | $24.00 |
| 91 | Reinf bars, epoxy CTD (50800205) | LB | 4,730 | $2.25 |
| 92 | Bar splicers (50800515) | EACH | 22 | $45.00 |
| 93 | Slope wall 4 (51100100) | SY | 245 | $235.00 |
| 94 | Pref JT strip seal (52000110) | LF | 128 | $485.00 |
| 95 | PRC flar end sec 24 (54213669) | EACH | 1 | $2,800.00 |
| 96 | Storm sew CL A 1 24 (550A0120) | LF | 64 | $120.00 |
| 97 | Storm sew CL A 2 18 (550A0380) | LF | 68 | $140.00 |
| 98 | Water valves adjust (56109210) | EACH | 2 | $475.00 |
| 99 | Epoxy crack injection (59000200) | LF | 178 | $80.00 |
| 100 | Conc HDWL for P drain (60100060) | EACH | 17 | $475.00 |
| 101 | Shoulder rem & repl (60100070) | LF | 146 | $425.00 |
| 102 | Pipe drains CS 24 (60103900) | LF | 20 | $285.00 |
| 103 | Pipe underdrain 4 SP (60108100) | LF | 425 | $48.00 |
| 104 | Inlets TB T8G (60240301) | EACH | 1 | $2,650.00 |
| 105 | Inlets adjust (60260100) | EACH | 2 | $800.00 |
| 106 | Conc curb TB (60600605) | LF | 80 | $54.00 |
| 107 | Comb CC&G TY B-6.24 (60605000) | LF | 1,351 | $75.00 |
| 108 | Comb CC&G TM6.06 (60608600) | LF | 70 | $60.00 |
| 109 | Box cul to BE cleaned (60905305) | LF | 470 | $45.00 |
| 110 | Pipe culv cleaned 24 (60920024) | LF | 48 | $150.00 |
| 111 | SPBGR TY A 6FT posts (63000001) | LF | 3,862.50 | $68.00 |
| 112 | Traf bar term T2 (63100045) | EACH | 7 | $2,200.00 |
| 113 | Traf bar term T6 (63100085) | EACH | 10 | $5,600.00 |
| 114 | TR bar TRM T1 SPL tan (63100167) | EACH | 17 | $4,800.00 |
| 115 | Guardrail remov (63200310) | LF | 5,189 | $16.00 |
| 116 | Delineators (63500105) | EACH | 280 | $68.00 |
| 117 | Shoulder rum strip 16 (64200116) | LF | 159,178 | $0.50 |
| 118 | Imp atten NRD TL3 (64300450) | EACH | 4 | $17,500 |
| 119 | Wov W fence 4 (66500105) | LF | 2,319 | $68.00 |
| 120 | Non SPL waste disposl (66900200) | CY | 28 | $140.00 |
| 121 | Soil disposal analy (66900530) | EACH | 1 | $1,650.00 |
| 122 | Reg sub P-const plan (66901001) | LS | 1 | $2,650.00 |
| 123 | Reg sub F con report (66901003) | LS | 1 | $2,650.00 |
| 124 | Reg sub mon (66901006) | CAL DAY | 7 | $1,650.00 |
| 125 | Engr field office A (67000400) | CAL MO | 12 | $0.01 |
| 126 | Mobilization (67100100) | LS | 1 | $1,836,000 |
| 127 | Traf cont-prot 701321 (70100405) | EACH | 1 | $70,000 |
| 128 | Traf cont-prot 701411 (70100420) | EACH | 4 | $7,500.00 |
| 129 | Traf cont-prot 701326 (70100500) | LS | 1 | $10,000 |
| 130 | Traf cont-prot 701406 (70100700) | LS | 1 | $65,000 |
| 131 | Traf cont-prot 701401 (70100800) | LS | 1 | $361,000 |
| 132 | Traf cont-prot 701456 (70100825) | LS | 1 | $15,000 |
| 133 | TR cont surveillance (70103815) | CAL DAY | 30 | $0.01 |
| 134 | Temp BR traf signals (70106500) | EACH | 1 | $65,000 |
| 135 | Temp rumble strips (70106700) | EACH | 6 | $3,500.00 |
| 136 | Changeable message SN (70107025) | CAL DAY | 28 | $180.00 |
| 137 | Short term pavt mking (70300100) | LF | 67,040 | $2.25 |
| 138 | SHRT TRM pavt MK rem (70300150) | SF | 22,348 | $3.75 |
| 139 | Temp PVT MK line 6 - paint (70300241) | LF | 233,744 | $0.65 |
| 140 | Temp PVT MK L4 T4 tape (70307120) | LF | 79,915 | $1.75 |
| 141 | Temp conc barrier (70400100) | LF | 1,250 | $55.00 |
| 142 | Rel temp conc barrier (70400200) | LF | 1,250 | $15.00 |
| 143 | Imp attn temp FRN TL3 (70600260) | EACH | 2 | $12,500 |
| 144 | Imp attn rel FRN TL3 (70600332) | EACH | 2 | $3,800.00 |
| 145 | Sign panel T1 (72000100) | SF | 64 | $32.00 |
| 146 | Sign panel T2 (72000200) | SF | 32 | $42.00 |
| 147 | Sign panel T3 (72000300) | SF | 756 | $44.00 |
| 148 | Remov sin pan assy TA (72400100) | EACH | 16 | $95.00 |
| 149 | Remov sin pan assy TB (72400200) | EACH | 12 | $14.00 |
| 150 | Remov sign panel T1 (72400310) | SF | 64 | $28.00 |
| 151 | Remov sign panel T2 (72400320) | SF | 32 | $28.00 |
| 152 | Remov sign panel T3 (72400330) | SF | 756 | $22.00 |
| 153 | Terminal marker - DA (72501000) | EACH | 17 | $46.00 |
| 154 | STR STL sin sup BA (72700100) | LB | 4,158 | $9.75 |
| 155 | Teles STL sin support (72800100) | LF | 177 | $36.00 |
| 156 | Wood sin support (73000100) | LF | 57 | $56.00 |
| 157 | Base tel STL sin supp (73100100) | EACH | 17 | $58.00 |
| 158 | Conc foundation (73400100) | CY | 16 | $3,600.00 |
| 159 | Rem GR MT sin support (73700100) | EACH | 20 | $285.00 |
| 160 | Rem conc FDN-GR MT (73700200) | EACH | 20 | $1,050.00 |
| 161 | Pref PL PM TD STD LTR/sym (78004600) | SF | 49 | $58.00 |
| 162 | Pref PL PM TD STD L 8 (78004640) | LF | 3,763 | $15.00 |
| 163 | Pref PL PM TD STD L 9 (78004645) | LF | 20,520 | $18.00 |
| 164 | Epoxy PVT MK LTR-sym (78005100) | SF | 12 | $8.00 |
| 165 | Epoxy PVT MK line 4 (78005110) | LF | 12,961 | $0.90 |
| 166 | Epoxy PVT MK line 6 (78005130) | LF | 328,361 | $1.35 |
| 167 | Epoxy PVT MK line 12 (78005150) | LF | 762 | $2.50 |
| 168 | GRV RCSD PVT MRKG 7 (78011035) | LF | 163,396 | $0.40 |
| 169 | GRV RCSD PVT MRKG 9 (78011045) | LF | 3,763 | $0.75 |
| 170 | GRV RCSD PVT MRKG 10 (78011050) | LF | 20,422 | $0.90 |
| 171 | GRV RCSD PVT MRKG 13 (78011065) | LF | 381 | $1.05 |
| 172 | Raised refl pavt MKR (78100100) | EACH | 2,337 | $55.00 |
| 173 | Grdrail ref type A (78200005) | EACH | 71 | $28.50 |
| 174 | Barr wall ref type C (78200011) | EACH | 16 | $18.00 |
| 175 | Raised ref PVT MK rem (78300200) | EACH | 2,180 | $0.01 |
| 176 | PVT MKG rem WTR blast (78300202) | SF | 145,545 | $1.15 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.