IDOT contract 78831 bid tabulation
Section X1-4(HB-3). Let by Illinois DOT on June 13, 2025, Williamson, District 09. 2 bids received; low bid $4,956,078 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 96
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $4,956,078 | Low |
| 2 | Samron Midwest Contracting, Inc. | $5,323,444 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | Mowing (X2503100) | UNIT | 10 | $155.26 | $153.00 |
| 2 | Rem conc end sec (X5010523) | EACH | 2 | $3,594.72 | $900.00 |
| 3 | Bar terminators (X5080530) | EACH | 514 | $23.82 | $82.00 |
| 4 | Conc gutter SPL (X6062400) | LF | 338 | $72.56 | $81.00 |
| 5 | Wov W fence remov (X6650202) | LF | 380 | $10.50 | $7.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $281,423 | $109,000 |
| 7 | Construction layout (Z0013798) | LS | 1 | $47,775 | $43,000 |
| 8 | Trainees (Z0076600) | HR | 1,500 | $0.80 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 1,500 | $15.00 | $15.00 |
| 10 | Tree remov 6-15 (20100110) | UNIT | 3,510 | $26.21 | $23.00 |
| 11 | Tree remov over 15 (20100210) | UNIT | 1,584 | $31.68 | $26.00 |
| 12 | Earth excavation (20200100) | CY | 1,605 | $14.03 | $28.00 |
| 13 | Borrow excavation (20400100) | CY | 21,235 | $20.07 | $30.00 |
| 14 | Seeding CL 2 (25000200) | ACRE | 4 | $2,073.75 | $2,200.00 |
| 15 | Seeding CL 7 (25000350) | ACRE | 4 | $708.75 | $761.00 |
| 16 | Nitrogen fert nutr (25000400) | LB | 360 | $1.73 | $2.00 |
| 17 | Phosphorus fert nutr (25000500) | LB | 360 | $1.73 | $2.00 |
| 18 | Potassium fert nutr (25000600) | LB | 360 | $1.73 | $2.00 |
| 19 | Agr ground limestone (25000700) | TON | 8 | $367.50 | $395.00 |
| 20 | Mulch method 2 (25100115) | ACRE | 8 | $1,391.25 | $1,500.00 |
| 21 | Erosion contr blanket (25100630) | SY | 18,462 | $1.84 | $2.00 |
| 22 | Temp eros contr seed (28000250) | LB | 800 | $4.21 | $3.00 |
| 23 | Temp ditch checks (28000305) | LF | 213 | $16.34 | $16.00 |
| 24 | Inlet & pipe protect (28000500) | EACH | 3 | $243.89 | $142.00 |
| 25 | Agg subgrade impr 12 (30300112) | SY | 1,734 | $24.55 | $30.00 |
| 26 | Sub gran mat A 4 (31100300) | SY | 100 | $39.73 | $20.00 |
| 27 | Sub gran mat B (31101000) | TON | 151 | $38.30 | $38.00 |
| 28 | Bit matls tack CT (40600290) | LB | 7,816 | $0.01 | $1.00 |
| 29 | HMA pavt FD 8 (40701841) | SY | 1,634 | $74.76 | $74.00 |
| 30 | Welded wire reinf (42000060) | SY | 112 | $20.27 | $22.00 |
| 31 | PVT con PCC BR app SL (42000080) | SY | 112 | $317.40 | $224.00 |
| 32 | Protective coat (42001300) | SY | 184 | $4.98 | $3.50 |
| 33 | Pavement rem (44000100) | SY | 1,658 | $4.25 | $8.00 |
| 34 | Gutter rem (44000400) | LF | 323 | $13.87 | $13.00 |
| 35 | Welded wire reinf (44200050) | SY | 192 | $21.29 | $17.00 |
| 36 | CL C patch T1 10 (44201349) | SY | 78 | $185.00 | $220.00 |
| 37 | CL C patch T2 10 (44201353) | SY | 388 | $179.00 | $215.00 |
| 38 | CL C patch T3 10 (44201357) | SY | 40 | $178.88 | $215.00 |
| 39 | CL C patch T4 10 (44201359) | SY | 88 | $175.00 | $215.00 |
| 40 | CL C patch T2 13 (44201389) | SY | 14 | $179.00 | $225.00 |
| 41 | CL C patch T3 13 (44201394) | SY | 22 | $175.00 | $225.00 |
| 42 | CL C patch T4 13 (44201396) | SY | 42 | $175.00 | $225.00 |
| 43 | Tie bars 3/4 (44213204) | EACH | 210 | $16.43 | $17.00 |
| 44 | Aggregate SHLDS B 6 (48101500) | SY | 44 | $60.83 | $31.00 |
| 45 | HMA shoulders 8 (48203029) | SY | 1,076 | $64.64 | $70.00 |
| 46 | PCC shoulders 10 (48300500) | SY | 68 | $181.02 | $170.00 |
| 47 | Rem exist struct (50100100) | EACH | 1 | $254,599 | $218,000 |
| 48 | Protective shield (50157300) | SY | 425 | $118.85 | $135.00 |
| 49 | Structure excavation (50200100) | CY | 183 | $48.97 | $32.00 |
| 50 | Conc struct (50300225) | CY | 124 | $1,670.93 | $1,500.00 |
| 51 | Conc sup-STR (50300255) | CY | 319.50 | $1,551.36 | $1,550.00 |
| 52 | BR deck grooving (50300260) | SY | 1,030 | $7.59 | $11.00 |
| 53 | Protective coat (50300300) | SY | 1,240 | $2.18 | $2.00 |
| 54 | Conc supstr app slab (50301350) | CY | 89.50 | $624.16 | $508.00 |
| 55 | F & E struct steel (50500105) | LS | 1 | $1,147,236 | $1,088,000 |
| 56 | Stud shear connectors (50500505) | EACH | 2,610 | $4.86 | $5.00 |
| 57 | Reinf bars, epoxy CTD (50800205) | LB | 126,990 | $2.68 | $2.00 |
| 58 | Mechanical splicers (50800530) | EACH | 36 | $269.15 | $154.00 |
| 59 | Slope wall 4 (51100100) | SY | 348 | $225.53 | $250.00 |
| 60 | Fur STL pile HP12X63 (51201610) | LF | 1,648 | $97.06 | $96.00 |
| 61 | Driving piles (51202305) | LF | 1,648 | $0.01 | $0.01 |
| 62 | Test pile ST HP12X63 (51203610) | EACH | 2 | $14,039 | $3,800.00 |
| 63 | Pile shoes (51204650) | EACH | 28 | $137.50 | $150.00 |
| 64 | Name plates (51500100) | EACH | 1 | $880.00 | $1,000.00 |
| 65 | Anchor bolts 1 (52100520) | EACH | 36 | $91.18 | $96.00 |
| 66 | P cul CL A 1 72 (542A0277) | LF | 51 | $512.83 | $510.00 |
| 67 | End sections 72 (54213507) | EACH | 2 | $12,219 | $18,000 |
| 68 | Concrete collar (54248510) | CY | 3.10 | $1,554.90 | $700.00 |
| 69 | Metal FL end sec 12" (54262712) | EACH | 4 | $731.97 | $900.00 |
| 70 | Granular backfill STR (58600101) | CY | 150 | $91.02 | $78.00 |
| 71 | Geocomposite wall DR (59100100) | SY | 76 | $30.42 | $35.00 |
| 72 | Conc HDWL for P drain (60100060) | EACH | 4 | $448.49 | $1,100.00 |
| 73 | Pipe drains 12 (60100945) | LF | 355 | $40.91 | $58.00 |
| 74 | P undr for struct 4 (60146304) | LF | 137 | $37.78 | $32.00 |
| 75 | Conc thrust blocks (61000050) | EACH | 4 | $519.48 | $900.00 |
| 76 | TY G inlet box 610001 (61000335) | EACH | 4 | $5,999.15 | $3,100.00 |
| 77 | SPBGR TY A 6FT posts (63000001) | LF | 2,150 | $37.80 | $40.00 |
| 78 | LSG over cul 25' span (63000370) | LF | 100 | $68.25 | $55.00 |
| 79 | Traf bar term T6 (63100085) | EACH | 4 | $6,562.50 | $5,800.00 |
| 80 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,832.50 | $4,300.00 |
| 81 | Guardrail remov (63200310) | LF | 2,714 | $6.77 | $8.00 |
| 82 | Wov W fence 4 (66500105) | LF | 344 | $18.90 | $31.00 |
| 83 | Engr field office A (67000400) | CAL MO | 15 | $2,000.00 | $1,815.00 |
| 84 | Mobilization (67100100) | LS | 1 | $136,704 | $320,000 |
| 85 | Traf cont-prot 701401 (70100800) | LS | 1 | $0.01 | $255,267 |
| 86 | Traf cont-prot 701446 (70100815) | LS | 1 | $0.01 | $4,200.00 |
| 87 | TR cont & prot 701501 (70102620) | LS | 1 | $0.01 | $11,000 |
| 88 | Changeable message SN (70107025) | CAL DAY | 439 | $62.86 | $0.01 |
| 89 | Night work zone light (70200100) | LS | 1 | $22,763 | $14,000 |
| 90 | Temp conc barrier (70400100) | LF | 1,800 | $26.85 | $36.00 |
| 91 | Pin temp conc barrier (70400125) | EACH | 72 | $42.61 | $68.00 |
| 92 | Imp attn temp FRN TL3 (70600260) | EACH | 4 | $9,275.33 | $19,000 |
| 93 | Terminal marker - DA (72501000) | EACH | 4 | $52.50 | $50.00 |
| 94 | Paint PVT MK line 6 (78001130) | LF | 3,400 | $1.84 | $2.00 |
| 95 | Grdrail ref type A (78200005) | EACH | 36 | $11.55 | $13.00 |
| 96 | Barr wall ref type B (78200010) | EACH | 16 | $29.23 | $43.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.