IDOT contract 78943 bid tabulation
Section (5,6,7)RS-3. Let by Illinois DOT on June 13, 2025, Franklin, District 09. 2 bids received; low bid $5,779,645 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 123
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $5,779,645 | Low |
| 2 | Samron Midwest Contracting, Inc. | $6,258,583 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | Remove exist riprap (X2810844) | SY | 232 | $14.96 | $18.00 |
| 2 | Surf rem var DP (SPL) (X4400102) | SY | 3,207 | $5.43 | $5.50 |
| 3 | Temp pavt removal (X4400110) | SY | 431 | $25.97 | $25.00 |
| 4 | Gutter remov SPL (X4402720) | LF | 980 | $10.15 | $14.00 |
| 5 | Abandon fill SS (X5509900) | LF | 154 | $103.29 | $40.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $49,024 | $115,000 |
| 7 | Construction layout (Z0013798) | LS | 1 | $29,483 | $82,500 |
| 8 | RR prot liability ins (Z0048665) | LS | 1 | $6,050.00 | $7,600.00 |
| 9 | Temp pavement (Z0062456) | SY | 431 | $76.28 | $165.00 |
| 10 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 |
| 11 | Earth excavation (20200100) | CY | 1,300 | $37.18 | $40.00 |
| 12 | Furnished excavation (20400800) | CY | 45 | $74.64 | $45.00 |
| 13 | Trench backfill (20800150) | CY | 1,373 | $63.37 | $70.00 |
| 14 | Seeding CL 1 (25000100) | ACRE | 1 | $3,570.00 | $5,500.00 |
| 15 | Seeding CL 7 (25000350) | ACRE | 1 | $3,060.00 | $1,100.00 |
| 16 | Nitrogen fert nutr (25000400) | LB | 90 | $3.06 | $1.75 |
| 17 | Phosphorus fert nutr (25000500) | LB | 90 | $3.06 | $1.75 |
| 18 | Potassium fert nutr (25000600) | LB | 90 | $3.06 | $1.75 |
| 19 | Agr ground limestone (25000700) | TON | 2 | $204.00 | $375.00 |
| 20 | Erosion contr blanket (25100630) | SY | 4,390 | $2.14 | $1.90 |
| 21 | Temp eros contr seed (28000250) | LB | 100 | $2.10 | $15.00 |
| 22 | Temp ditch checks (28000305) | LF | 74 | $21.00 | $8.00 |
| 23 | Inlet & pipe protect (28000500) | EACH | 43 | $154.39 | $100.00 |
| 24 | Stone riprap CL A3 (28100105) | SY | 66 | $38.72 | $50.00 |
| 25 | Agg subgrade impr 12 (30300112) | SY | 3,350 | $26.93 | $26.00 |
| 26 | Agg base cse A 4 (35100300) | SY | 172 | $27.55 | $40.00 |
| 27 | PCC bse cse 7 1/2 (35300210) | SY | 1,447 | $52.68 | $52.00 |
| 28 | PCC base cse W 7.5 (35400250) | SY | 509 | $58.66 | $50.00 |
| 29 | Aggregate-temp access (40201000) | TON | 134 | $52.53 | $55.00 |
| 30 | Bit matls tack CT (40600290) | LB | 110,997 | $0.01 | $0.01 |
| 31 | Long joint sealant (40600370) | LF | 55,504 | $2.61 | $3.00 |
| 32 | Matl transfer device (40600405) | TON | 23,059 | $2.71 | $1.50 |
| 33 | HMA surf rem butt JT (40600982) | SY | 3,042 | $15.35 | $10.00 |
| 34 | PCC surf rem butt JT (40600985) | SY | 161 | $20.35 | $10.00 |
| 35 | Temporary ramp (40600990) | SY | 526 | $34.01 | $15.00 |
| 36 | HMA BC IL-9.5FG N70 (40602970) | TON | 10,469 | $91.91 | $101.00 |
| 37 | HMA SC IL-9.5 D N70 (40604062) | TON | 12,590 | $99.95 | $99.00 |
| 38 | Incidental HMA surf (40800050) | TON | 498.10 | $179.31 | $285.00 |
| 39 | PCC driveway pavt 6 (42300200) | SY | 261 | $270.30 | $240.00 |
| 40 | PCC driveway pavt 7 (42300300) | SY | 256 | $95.26 | $135.00 |
| 41 | PCC driveway pavt 8 (42300400) | SY | 246 | $103.20 | $105.00 |
| 42 | PC conc sidewalk 5 (42400200) | SF | 6,736 | $8.17 | $10.00 |
| 43 | Detectable warnings (42400800) | SF | 71 | $37.18 | $25.00 |
| 44 | Pavement rem (44000100) | SY | 929 | $31.91 | $15.00 |
| 45 | HMA surf rem 1 1/2 (44000155) | SY | 145,617 | $1.52 | $1.75 |
| 46 | HMA surf rem 2 3/4 (44000160) | SY | 12,229 | $2.97 | $3.00 |
| 47 | Drive pavement rem (44000200) | SY | 714 | $11.49 | $22.00 |
| 48 | Comb curb gutter rem (44000500) | LF | 198 | $6.27 | $10.00 |
| 49 | Sidewalk rem (44000600) | SF | 783 | $3.97 | $3.75 |
| 50 | Paved ditch removal (44004000) | LF | 88 | $11.27 | $45.00 |
| 51 | CL C patch T1 13 (44201385) | SY | 15 | $260.00 | $290.00 |
| 52 | CL C patch T2 13 (44201389) | SY | 320 | $252.00 | $285.00 |
| 53 | CL C patch T3 13 (44201394) | SY | 134 | $248.00 | $280.00 |
| 54 | CL C patch T4 13 (44201396) | SY | 34 | $239.00 | $275.00 |
| 55 | CL C patch T2 15 (44201415) | SY | 8 | $255.00 | $215.00 |
| 56 | Tie bars 3/4 (44213204) | EACH | 912 | $14.96 | $10.00 |
| 57 | Agg wedge SHLD type B (48102100) | TON | 2,022.80 | $43.69 | $53.00 |
| 58 | HMA shoulders (48203100) | TON | 3,596 | $86.84 | $115.00 |
| 59 | Conc headwall removal (50104400) | EACH | 2 | $584.89 | $450.00 |
| 60 | Pipe culvert remov (50105220) | LF | 648 | $13.16 | $10.00 |
| 61 | P cul CL A 1 24 (542A0229) | LF | 126 | $119.05 | $148.00 |
| 62 | PRC flar end sec 24 (54213669) | EACH | 3 | $2,124.27 | $2,950.00 |
| 63 | PRC flar end sec 36 (54213681) | EACH | 1 | $2,934.19 | $3,500.00 |
| 64 | Concrete collar (54248510) | CY | 2.40 | $1,343.30 | $260.00 |
| 65 | Storm sew CL A 1 12 (550A0050) | LF | 47 | $110.89 | $98.00 |
| 66 | Storm sew CL A 1 18 (550A0090) | LF | 4 | $256.31 | $350.00 |
| 67 | Storm sew CL A 1 24 (550A0120) | LF | 135 | $114.57 | $135.00 |
| 68 | Storm sew CL A 1 36 (550A0160) | LF | 76 | $170.82 | $190.00 |
| 69 | Storm sew CL A 2 12 (550A0340) | LF | 130 | $110.25 | $100.00 |
| 70 | Storm sew CL A 2 18 (550A0380) | LF | 93 | $155.68 | $125.00 |
| 71 | Storm sew CL A 2 24 (550A0410) | LF | 1,109 | $148.98 | $135.00 |
| 72 | Storm sew CL A 2 36 (550A0450) | LF | 1,030 | $190.00 | $184.00 |
| 73 | Storm sewer rem 6 (55100200) | LF | 1 | $8.29 | $15.00 |
| 74 | Storm sewer rem 10 (55100400) | LF | 14 | $9.52 | $10.00 |
| 75 | Storm sewer rem 12 (55100500) | LF | 49 | $11.93 | $12.00 |
| 76 | Storm sewer rem 15 (55100700) | LF | 10 | $13.50 | $13.00 |
| 77 | Storm sewer rem 18 (55100900) | LF | 553 | $16.92 | $11.00 |
| 78 | Storm sewer rem 27 (55101300) | LF | 390 | $17.99 | $15.00 |
| 79 | Storm sewer rem 36 (55101600) | LF | 18 | $32.50 | $20.00 |
| 80 | Man TA 4 dia T3F&G (60218500) | EACH | 12 | $4,356.74 | $5,000.00 |
| 81 | Man TA 4 dia T8G (60219000) | EACH | 1 | $3,955.03 | $4,650.00 |
| 82 | Man TA 5 dia T1F CL (60221100) | EACH | 3 | $5,064.24 | $6,850.00 |
| 83 | Man TA 5 dia T3F&G (60221200) | EACH | 13 | $5,310.06 | $6,850.00 |
| 84 | Man TA 5 dia T8G (60221700) | EACH | 3 | $4,908.35 | $6,500.00 |
| 85 | Man TA 5D M in 604106 (60222805) | EACH | 1 | $6,281.36 | $7,725.00 |
| 86 | Man TA 6 dia T3F&G (60223810) | EACH | 5 | $6,761.03 | $9,450.00 |
| 87 | Man TA 7 dia T3F&G (60224447) | EACH | 1 | $11,720 | $13,000 |
| 88 | Inlets TA T3F&G (60235700) | EACH | 1 | $2,599.27 | $3,425.00 |
| 89 | Inlets TA T8G (60236200) | EACH | 1 | $2,197.56 | $3,050.00 |
| 90 | Inlets adjust (60260100) | EACH | 1 | $4,093.32 | $450.00 |
| 91 | Remov manholes (60500040) | EACH | 3 | $495.85 | $1,000.00 |
| 92 | Remov inlets (60500060) | EACH | 6 | $495.85 | $750.00 |
| 93 | Fill manholes (60500105) | EACH | 1 | $4,606.19 | $1,175.00 |
| 94 | Comb CC&G TY B-6.24 (60605000) | LF | 2,894 | $52.60 | $50.00 |
| 95 | Shoulder rum strip 8 (64200108) | LF | 95,557 | $0.21 | $0.17 |
| 96 | Non SPL waste disposl (66900200) | CY | 713 | $73.19 | $85.00 |
| 97 | Soil disposal analy (66900530) | EACH | 5 | $1,530.00 | $1,750.00 |
| 98 | Reg sub P-const plan (66901001) | LS | 1 | $2,040.00 | $2,100.00 |
| 99 | Reg sub F con report (66901003) | LS | 1 | $2,040.00 | $2,100.00 |
| 100 | Reg sub mon (66901006) | CAL DAY | 25 | $1,116.90 | $1,100.00 |
| 101 | Engr field office A (67000400) | CAL MO | 12 | $1,800.00 | $1,550.00 |
| 102 | Mobilization (67100100) | LS | 1 | $302,001 | $373,500 |
| 103 | Traf cont-prot 701306 (70100460) | LS | 1 | $129,462 | $65,000 |
| 104 | Traf cont-prot 701336 (70100600) | LS | 1 | $22,744 | $35,000 |
| 105 | TR cont surveillance (70103815) | CAL DAY | 20 | $0.01 | $0.01 |
| 106 | Changeable message SN (70107025) | CAL DAY | 28 | $78.59 | $95.00 |
| 107 | Short term pavt mking (70300100) | LF | 11,959 | $2.02 | $2.00 |
| 108 | SHRT TRM pavt MK rem (70300150) | SF | 24,981 | $0.01 | $0.01 |
| 109 | Temp PVT MK LTR & sym paint (70300211) | SF | 321 | $0.01 | $0.01 |
| 110 | Temp PVT MK line 4 - paint (70300221) | LF | 158,309 | $0.01 | $0.01 |
| 111 | Temp PVT MK line 6 - paint (70300241) | LF | 139 | $0.01 | $0.01 |
| 112 | Temp PVT MK line 12 - paint (70300261) | LF | 336 | $0.01 | $0.01 |
| 113 | Temp PVT MK line 24 - paint (70300281) | LF | 99 | $0.01 | $0.01 |
| 114 | Sign panel T1 (72000100) | SF | 12 | $31.73 | $55.00 |
| 115 | Wood sin support (73000100) | LF | 31 | $4.34 | $40.00 |
| 116 | THPL PVT MK LTR & sym (78000100) | SF | 321 | $15.49 | $15.00 |
| 117 | THPL PVT MK line 4 (78000200) | LF | 158,309 | $0.55 | $0.55 |
| 118 | THPL PVT MK line 6 (78000400) | LF | 139 | $5.16 | $5.10 |
| 119 | THPL PVT MK line 12 (78000600) | LF | 336 | $10.33 | $10.50 |
| 120 | THPL PVT MK line 24 (78000650) | LF | 99 | $15.49 | $15.00 |
| 121 | Raised refl pavt MKR (78100100) | EACH | 763 | $39.39 | $38.75 |
| 122 | Raised ref PVT MK rem (78300200) | EACH | 704 | $8.65 | $13.00 |
| 123 | PVT MKG rem grinding (78300201) | SF | 1,772 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.