IDOT contract 78B74 bid tabulation
. Let by Illinois DOT on November 7, 2025, Williamson, District 09. 4 bids received; low bid $118,588 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 11
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $118,588 | Low |
| 2 | Samron Midwest Contracting, Inc. | $124,033 | +5.0% |
| 3 | Kinney Contractors, Inc. | $136,284 | +15% |
| 4 | G. M. Sipes Construction, Inc. | $155,683 | +31% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. | 3. Kinney Contractors, Inc. | 4. G. M. Sipes Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | CL C patch T2 10 (44201353) | SY | 176 | $275.00 | $305.00 | $273.00 | $450.00 |
| 2 | CL C patch T3 10 (44201357) | SY | 44 | $272.00 | $300.00 | $271.00 | $450.00 |
| 3 | CL C patch T4 10 (44201359) | SY | 101 | $269.00 | $295.00 | $269.00 | $425.00 |
| 4 | Tie bars 3/4 (44213204) | EACH | 18 | $7.21 | $6.00 | $21.00 | $0.01 |
| 5 | Mobilization (67100100) | LS | 1 | $8,439.69 | $7,000.00 | $7,000.00 | $7,500.00 |
| 6 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $0.01 | $33,000 | $0.01 |
| 7 | Traf cont-prot 701336 (70100600) | LS | 1 | $16,751 | $18,000 | $1.00 | $0.01 |
| 8 | Changeable message SN (70107025) | CAL DAY | 28 | $41.25 | $80.00 | $165.00 | $75.00 |
| 9 | Short term pavt mking (70300100) | LF | 444 | $0.01 | $0.01 | $2.50 | $0.01 |
| 10 | SHRT TRM pavt MK rem (70300150) | SF | 148 | $0.01 | $0.01 | $10.00 | $0.01 |
| 11 | Paint PVT MK line 4 (78001110) | LF | 444 | $10.29 | $0.01 | $3.50 | $9.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.