IDOT contract 80B50 bid tabulation
Section 2025-2069-RS. Let by Illinois DOT on January 16, 2026, Lake, District 01. 5 bids received; low bid $1,797,808 by Builders Paving, LLC.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 82
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Builders Paving, LLC | $1,797,808 | Low |
| 2 | Peter Baker & Son Co. | $1,855,847 | +3.0% |
| 3 | Everlast Blacktop Inc. | $2,093,204 | +16% |
| 4 | A Lamp Concrete Contractors, Inc. | $2,239,665 | +25% |
| 5 | Curran Contracting Company | $2,377,927 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Builders Paving, LLC | 2. Peter Baker & Son Co. | 3. Everlast Blacktop Inc. | 4. A Lamp Concrete Contractors, Inc. | 5. Curran Contracting Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $16,000 | $3,500.00 | $10,000 | $9,500.00 | $50,000 |
| 2 | Rem & rein bric paver (X0327611) | SF | 143 | $25.00 | $15.00 | $20.00 | $30.00 | $15.00 |
| 3 | Ped signal post 10 FT (X1400367) | EACH | 1 | $1,339.86 | $1,699.66 | $1,600.00 | $2,390.50 | $1,339.86 |
| 4 | Ped signal post 5 FT (X1400378) | EACH | 10 | $1,095.44 | $1,237.90 | $1,250.00 | $2,145.50 | $1,095.44 |
| 5 | CC&G RMVL repl < = 10 (X4400501) | LF | 110 | $85.00 | $75.00 | $96.00 | $95.25 | $63.00 |
| 6 | CC&G RMVL repl > 10FT (X4400503) | LF | 1,257 | $57.50 | $60.00 | $57.00 | $62.75 | $63.00 |
| 7 | SS cleaned 12 (X5537800) | LF | 400 | $2.00 | $1.00 | $8.00 | $1.00 | $5.00 |
| 8 | FR & lids adjust SPL (X6030310) | EACH | 51 | $1,025.00 | $1,150.00 | $1,250.00 | $650.00 | $1,250.00 |
| 9 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,000.00 | $500.00 | $3,500.00 | $2,000.00 | $3,250.00 |
| 10 | Temp info signing (X7200061) | SF | 154 | $20.00 | $20.00 | $22.00 | $25.00 | $20.00 |
| 11 | Main EX FL beacon ins (X8500110) | EACH | 1 | $302.06 | $1,599.31 | $350.00 | $1,200.00 | $302.06 |
| 12 | Accessible ped signal (X8760200) | EACH | 32 | $1,105.06 | $1,308.83 | $1,250.00 | $1,772.38 | $1,105.06 |
| 13 | Conc FDN TY A 12D (X8780012) | LF | 44 | $312.22 | $304.55 | $350.00 | $585.00 | $312.22 |
| 14 | Drainage STR cleaned (Z0018500) | EACH | 20 | $325.00 | $325.00 | $500.00 | $325.00 | $350.00 |
| 15 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 4 | $576.00 | $886.55 | $750.00 | $420.00 | $576.00 |
| 16 | Earth excavation (20200100) | CY | 25 | $60.00 | $75.00 | $15.00 | $60.00 | $65.00 |
| 17 | Topsoil F & P 4 (21101615) | SY | 175 | $12.00 | $0.10 | $8.00 | $9.25 | $0.10 |
| 18 | Sodding salt tolerant (25200110) | SY | 175 | $40.00 | $75.00 | $40.00 | $16.50 | $75.00 |
| 19 | Supple watering (25200200) | UNIT | 5 | $40.00 | $0.10 | $1.00 | $1.00 | $0.10 |
| 20 | Bit matls tack CT (40600290) | LB | 27,868 | $0.01 | $0.01 | $0.01 | $0.01 | $1.30 |
| 21 | Long joint sealant (40600370) | LF | 17,091 | $2.69 | $3.38 | $2.65 | $2.39 | $3.15 |
| 22 | Mix CR JTS flangewys (40600400) | TON | 62 | $550.00 | $150.00 | $496.00 | $150.00 | $450.00 |
| 23 | HMA surf rem butt JT (40600982) | SY | 390 | $5.00 | $1.00 | $34.00 | $15.25 | $25.00 |
| 24 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,704 | $100.00 | $108.00 | $125.41 | $130.00 | $135.00 |
| 25 | P HMA SC IL-9.5 E N70 (40604172) | TON | 4,085 | $95.00 | $102.00 | $109.00 | $140.00 | $115.00 |
| 26 | Protective coat (42001300) | SY | 825 | $0.01 | $1.00 | $4.00 | $0.01 | $0.01 |
| 27 | PC conc sidewalk 5 (42400200) | SF | 5,406 | $18.85 | $12.50 | $15.00 | $9.50 | $12.00 |
| 28 | Detectable warnings (42400800) | SF | 415 | $28.50 | $45.00 | $70.00 | $35.00 | $40.00 |
| 29 | HMA surf rem 1 1/2 (44000155) | SY | 19 | $265.00 | $10.00 | $421.00 | $60.00 | $35.00 |
| 30 | HMA surf rem 2 1/2 (44000159) | SY | 41,676 | $3.50 | $4.88 | $2.81 | $3.50 | $5.00 |
| 31 | Sidewalk rem (44000600) | SF | 5,362 | $2.15 | $2.50 | $2.00 | $2.00 | $6.00 |
| 32 | CL D patch T1 11 (44201773) | SY | 100 | $60.00 | $75.00 | $200.00 | $105.00 | $300.00 |
| 33 | CL D patch T2 11 (44201777) | SY | 1,000 | $50.00 | $75.00 | $109.00 | $95.00 | $120.00 |
| 34 | CL D patch T3 11 (44201781) | SY | 500 | $40.00 | $75.00 | $115.00 | $91.00 | $100.00 |
| 35 | CL D patch T4 11 (44201783) | SY | 400 | $30.00 | $75.00 | $115.00 | $91.00 | $80.00 |
| 36 | CB reconst (60252800) | EACH | 1 | $1,250.00 | $3,100.00 | $1,400.00 | $3,000.00 | $1,450.00 |
| 37 | Man reconst (60257900) | EACH | 1 | $1,450.00 | $3,100.00 | $2,000.00 | $3,000.00 | $1,650.00 |
| 38 | Inlets adjust (60260100) | EACH | 5 | $400.00 | $515.00 | $950.00 | $585.00 | $450.00 |
| 39 | Valve box adj (60266600) | EACH | 4 | $385.00 | $575.00 | $950.00 | $575.00 | $385.00 |
| 40 | FR & grates adjust (60300105) | EACH | 9 | $400.00 | $515.00 | $950.00 | $585.00 | $450.00 |
| 41 | FR & lids adjust (60300305) | EACH | 3 | $550.00 | $515.00 | $950.00 | $600.00 | $550.00 |
| 42 | Comb CC&G TB6.18 (60604400) | LF | 807 | $46.00 | $60.00 | $48.00 | $59.50 | $50.00 |
| 43 | Pipe culv cleaned 12 (60920012) | LF | 200 | $3.00 | $4.00 | $11.00 | $1.00 | $5.00 |
| 44 | Pipe culv cleaned 18 (60920018) | LF | 200 | $3.00 | $6.00 | $12.00 | $1.50 | $5.00 |
| 45 | Pipe culv cleaned 24 (60920024) | LF | 200 | $10.00 | $8.00 | $18.00 | $2.00 | $10.00 |
| 46 | Non SPL waste disposl (66900200) | CY | 25 | $125.00 | $120.00 | $200.00 | $55.00 | $135.00 |
| 47 | Soil disposal analy (66900530) | EACH | 1 | $1,450.00 | $1,875.00 | $2,000.00 | $1,875.00 | $1,500.00 |
| 48 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $3,400.00 | $4,000.00 | $3,400.00 | $4,200.00 |
| 49 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $500.00 | $3,000.00 | $500.00 | $500.00 |
| 50 | Reg sub mon (66901006) | CAL DAY | 15 | $680.00 | $715.00 | $1,300.00 | $715.00 | $750.00 |
| 51 | Mobilization (67100100) | LS | 1 | $104,577 | $111,312 | $75,407 | $134,000 | $315,000 |
| 52 | TR cont & prot 701606 (70102625) | LS | 1 | $110,000 | $44,320 | $10.00 | $222,000 | $30,000 |
| 53 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $1.00 | $132,634 | $1.00 | $30,000 |
| 54 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 55 | TR cont & prot 701701 (70102635) | LS | 1 | $57,999 | $1.00 | $10.00 | $1.00 | $1.00 |
| 56 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 57 | Short term pavt mking (70300100) | LF | 12,308 | $0.01 | $0.70 | $0.80 | $0.01 | $0.50 |
| 58 | SHRT TRM pavt MK rem (70300150) | SF | 3,077 | $0.01 | $0.01 | $0.60 | $0.01 | $0.50 |
| 59 | Temp PVT MK LTR & sym paint (70300211) | SF | 849 | $0.01 | $1.25 | $1.90 | $0.01 | $1.25 |
| 60 | Temp PVT MK line 4 - paint (70300221) | LF | 18,095 | $0.01 | $0.28 | $0.40 | $0.01 | $0.28 |
| 61 | Temp PVT MK line 6 - paint (70300241) | LF | 4,725 | $0.01 | $0.42 | $0.75 | $0.01 | $0.42 |
| 62 | Temp PVT MK line 12 - paint (70300261) | LF | 1,540 | $0.01 | $1.00 | $1.25 | $0.01 | $1.00 |
| 63 | Temp PVT MK line 24 - paint (70300281) | LF | 658 | $0.01 | $2.00 | $2.40 | $0.01 | $2.00 |
| 64 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,077 | $0.01 | $1.20 | $1.40 | $0.01 | $1.20 |
| 65 | THPL PVT MK LTR & sym (78000100) | SF | 849 | $6.50 | $6.50 | $7.00 | $5.75 | $6.50 |
| 66 | THPL PVT MK line 4 (78000200) | LF | 18,095 | $0.83 | $0.83 | $1.10 | $0.85 | $0.83 |
| 67 | THPL PVT MK line 6 (78000400) | LF | 4,725 | $1.15 | $1.15 | $2.00 | $0.95 | $1.15 |
| 68 | THPL PVT MK line 12 (78000600) | LF | 1,540 | $2.75 | $2.75 | $3.00 | $3.32 | $2.75 |
| 69 | THPL PVT MK line 24 (78000650) | LF | 658 | $5.50 | $5.50 | $7.00 | $5.75 | $5.50 |
| 70 | Raised refl pavt MKR (78100100) | EACH | 721 | $33.50 | $33.50 | $38.00 | $36.00 | $33.50 |
| 71 | Raised ref PVT MK rem (78300200) | EACH | 721 | $5.00 | $12.00 | $40.00 | $20.00 | $25.00 |
| 72 | Undrgrd C galvs 2 (81028200) | LF | 185 | $93.79 | $48.18 | $99.00 | $40.34 | $93.79 |
| 73 | Main EX TR sig instal (85000200) | EACH | 4 | $2,041.31 | $5,731.04 | $2,300.00 | $1,200.00 | $2,041.31 |
| 74 | Elcbl C signal 14 2C (87301215) | LF | 1,656 | $6.07 | $2.70 | $6.60 | $3.43 | $6.07 |
| 75 | Elcbl C signal 14 3C (87301225) | LF | 71 | $6.25 | $4.17 | $6.60 | $3.61 | $6.25 |
| 76 | Elcbl C egrdc 6 1C (87301900) | LF | 244 | $6.79 | $5.65 | $7.00 | $4.09 | $6.79 |
| 77 | Drill EX handhole (87900200) | EACH | 10 | $465.11 | $709.66 | $500.00 | $1,050.00 | $465.11 |
| 78 | Ped SH LED 1F BM CDT (88102717) | EACH | 1 | $648.84 | $1,012.06 | $700.00 | $910.00 | $648.84 |
| 79 | Det loop T1 (88600100) | LF | 2,366 | $25.94 | $38.92 | $27.00 | $55.00 | $25.94 |
| 80 | Rem elcbl FR con (89502300) | LF | 203 | $5.56 | $2.27 | $6.00 | $1.60 | $5.56 |
| 81 | Remov EX TS equip (89502375) | EACH | 4 | $180.28 | $369.83 | $200.00 | $2,000.00 | $180.28 |
| 82 | Rebuild EX handhole (89502376) | EACH | 2 | $3,259.03 | $2,712.42 | $3,550.00 | $4,000.00 | $3,259.03 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.