IDOT contract 80B76 bid tabulation
Section 2025-2038-I,PP,DR. Let by Illinois DOT on April 24, 2026, Will, District 01. 2 bids received; low bid $1,101,862 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 71
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,101,862 | Low |
| 2 | MYS, Incorporated | $1,474,413 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. MYS, Incorporated |
|---|---|---|---|---|---|
| 1 | Reloc exist tanks (X0321835) | EACH | 1 | $7,500.00 | $5,003.39 |
| 2 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $12,000 | $3,164.39 |
| 3 | TR C-prot expressways (X7011015) | LS | 1 | $18,000 | $18,057 |
| 4 | Temp info signing (X7200061) | SF | 100 | $30.00 | $27.72 |
| 5 | Rem & rein sign panel (X7200075) | SF | 8 | $1,000.00 | $138.62 |
| 6 | Conc step remov (Z0012455) | EACH | 1 | $400.00 | $6,105.11 |
| 7 | STR rep con DP = < 5 (Z0012754) | SF | 20 | $500.00 | $415.86 |
| 8 | F&I static scale comp (Z0025710) | LS | 1 | $233,200 | $371,503 |
| 9 | Earth excavation (20200100) | CY | 130 | $35.00 | $109.15 |
| 10 | Rem & disp uns matl (20201200) | CY | 5 | $150.00 | $332.87 |
| 11 | Furnished excavation (20400800) | CY | 1,480 | $28.00 | $92.19 |
| 12 | Trench backfill (20800150) | CY | 23 | $60.00 | $144.17 |
| 13 | Topsoil exc & plac (21101505) | CY | 400 | $25.00 | $55.45 |
| 14 | Topsoil F & P 4 (21101615) | SY | 4,005 | $6.50 | $8.00 |
| 15 | Seeding CL 2A (25000210) | ACRE | 0.50 | $2,321.00 | $2,441.94 |
| 16 | Seeding CL 4A (25000312) | ACRE | 0.50 | $1,331.00 | $2,333.27 |
| 17 | Seeding CL 5 (25000320) | ACRE | 0.50 | $2,662.00 | $6,729.20 |
| 18 | Nitrogen fert nutr (25000400) | LB | 30 | $3.30 | $3.88 |
| 19 | Phosphorus fert nutr (25000500) | LB | 30 | $3.30 | $3.88 |
| 20 | Potassium fert nutr (25000600) | LB | 30 | $3.30 | $3.88 |
| 21 | Mowing (25000750) | ACRE | 1 | $110.00 | $859.45 |
| 22 | Erosion contr blanket (25100630) | SY | 3,973 | $2.20 | $2.16 |
| 23 | Temp eros contr seed (28000250) | LB | 247 | $5.50 | $6.65 |
| 24 | Perimeter eros bar (28000400) | LF | 42 | $27.50 | $19.96 |
| 25 | Agg subgrade impr 12 (30300112) | SY | 196 | $30.00 | $83.46 |
| 26 | Welded wire reinf (42000060) | SY | 100 | $25.00 | $15.45 |
| 27 | PC conc sidewalk 5 (42400200) | SF | 690 | $14.00 | $19.91 |
| 28 | Detectable warnings (42400800) | SF | 10 | $100.00 | $49.45 |
| 29 | Comb curb gutter rem (44000500) | LF | 20 | $30.00 | $30.05 |
| 30 | Sidewalk rem (44000600) | SF | 442 | $5.00 | $3.58 |
| 31 | Median removal (44003100) | SF | 698 | $6.00 | $11.54 |
| 32 | Paved SHLD removal (44004250) | SY | 739 | $16.00 | $38.21 |
| 33 | CL B patch T2 13 (44201007) | SY | 223 | $300.00 | $425.59 |
| 34 | CL B patch T3 13 (44201011) | SY | 20 | $300.00 | $364.61 |
| 35 | CL B patch T4 13 (44201013) | SY | 80 | $300.00 | $356.45 |
| 36 | Dowel bars 1 1/2 (44201299) | EACH | 650 | $20.00 | $67.54 |
| 37 | Saw cuts (44213200) | LF | 1,114 | $6.00 | $5.54 |
| 38 | Tie bars 3/4 (44213204) | EACH | 287 | $20.00 | $51.46 |
| 39 | HMA shoulders 8 (48203029) | SY | 224 | $67.00 | $94.26 |
| 40 | Rem exist sup-STR (50101500) | EACH | 1 | $31,000 | $51,747 |
| 41 | Conc rem (50102400) | CY | 15 | $1,550.00 | $560.68 |
| 42 | Conc headwall removal (50104400) | EACH | 3 | $500.00 | $907.04 |
| 43 | Pipe culvert remov (50105220) | LF | 61 | $20.00 | $44.36 |
| 44 | Conc struct (50300225) | CY | 11.20 | $2,200.00 | $4,990.34 |
| 45 | Protective coat (50300300) | SY | 75 | $1.00 | $2.74 |
| 46 | Conc supstr app slab (50301350) | CY | 3.80 | $1,000.00 | $869.77 |
| 47 | F & E struct steel (50500405) | LB | 4,780 | $10.00 | $0.02 |
| 48 | Reinf bars, epoxy CTD (50800205) | LB | 1,560 | $3.00 | $7.69 |
| 49 | PRC flar end sec 24 (54213669) | EACH | 1 | $2,200.00 | $2,661.52 |
| 50 | Storm sew CL A 2 12 (550A0340) | LF | 154 | $89.00 | $177.43 |
| 51 | Storm sew CL A 2 18 (550A0380) | LF | 97 | $98.00 | $188.52 |
| 52 | Storm sew CL A 2 24 (550A0410) | LF | 163 | $114.00 | $243.97 |
| 53 | Man TA 5 dia T1F CL (60221100) | EACH | 1 | $5,220.00 | $6,653.79 |
| 54 | Man TA 6 dia T1F CL (60223800) | EACH | 1 | $6,230.00 | $9,426.20 |
| 55 | Inlets TA T24F&G (60237470) | EACH | 3 | $2,440.00 | $2,772.41 |
| 56 | Comb CC&G TY B-6.24 (60605000) | LF | 490 | $50.00 | $50.25 |
| 57 | Conc med TSM6.12 (60622800) | SF | 688 | $30.00 | $37.54 |
| 58 | Non SPL waste disposl (66900200) | CY | 700 | $80.00 | $144.46 |
| 59 | Soil disposal analy (66900530) | EACH | 2 | $3,850.00 | $1,607.99 |
| 60 | Reg sub P-const plan (66901001) | LS | 1 | $2,750.00 | $3,437.79 |
| 61 | Reg sub F con report (66901003) | LS | 1 | $2,750.00 | $1,330.75 |
| 62 | Reg sub mon (66901006) | CAL DAY | 10 | $1,000.00 | $804.00 |
| 63 | Mobilization (67100100) | LS | 1 | $61,200 | $85,929 |
| 64 | SHRT TRM pavt MK rem (70300150) | SF | 400 | $4.00 | $3.33 |
| 65 | Temp PVT MK L8 T4 tape (70307140) | LF | 600 | $5.00 | $2.66 |
| 66 | Teles STL sin support (72800100) | LF | 15 | $30.00 | $19.96 |
| 67 | Base tel STL sin supp (73100100) | EACH | 1 | $300.00 | $250.00 |
| 68 | Mod ureth PM LTR-sym (78009000) | SF | 21 | $71.50 | $5.54 |
| 69 | Mod ureth PM line 6 (78009006) | LF | 532 | $12.25 | $2.66 |
| 70 | Mod ureth PM line 12 (78009012) | LF | 54 | $49.50 | $4.93 |
| 71 | Mod ureth PM line 24 (78009024) | LF | 12 | $107.25 | $10.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.