Rock Falls, section 19-00137-00-BR. Let by Illinois DOT on November 7, 2025, Whiteside, District 02. 3 bids received; low bid $1,699,166 by Martin & Company Excavating.

Owner
Illinois DOT
Letting
07 NOV 2025
Pay items
75
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martin & Company Excavating$1,699,166Low
2Civil Constructors, Inc. d/b/a/ Helm Civil$1,859,068+9.0%
3Brandt Construction Co.$2,671,051+57%
IDOT contract 85779: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martin & Company Excavating2. Civil Constructors, Inc. d/b/a/ Helm Civil3. Brandt Construction Co.
1Park bench rem & rel (X0320090)EACH1$2,500.00$1,900.00$5,100.00
2Fold down bollards (X0350805)EACH1$2,600.00$2,700.00$7,000.00
3Swing gate removal (X2300024)EACH2$670.00$480.00$800.00
4Seeding CL 1B mod (X2500930)ACRE0.44$4,400.00$3,800.00$4,200.00
5Woodland seeding SPL (X2510001)SF11,812$0.20$0.14$0.15
6Eros cont blanket SPL (X2511630)SY3,159$2.50$1.85$2.00
7Stone boulders SPL (X2600040)EACH4$700.00$520.00$585.00
8Perimeter eros bar SP (X2800400)LF1,857$21.00$18.40$20.00
9Stone riprap CL A4 SP (X2810108)SY251$66.00$85.00$75.00
10Bar splicers special (X5080525)EACH76$50.00$56.00$75.00
11Inlets SPL (X6024240)EACH2$2,500.00$3,100.00$5,900.00
12Traf cont & prot SPL (X7010216)LS1$10,000$7,950.00$9,000.00
13Construction layout (Z0013798)LS1$7,500.00$14,000$24,000
14Trainees (Z0076600)HR500$0.80$0.80$0.80
15Trainees TPG (Z0076604)HR500$15.00$15.00$15.00
16Tree remov 6-15 (20100110)UNIT177$55.00$50.00$55.00
17Tree remov over 15 (20100210)UNIT265$65.00$60.00$95.00
18Earth excavation (20200100)CY1,823$28.00$21.00$40.00
19Rem & disp uns matl (20201200)CY121$28.00$33.00$55.00
20Trench backfill (20800150)CY34$48.00$36.00$77.00
21Topsoil exc & plac (21101505)CY359$17.00$29.00$55.00
22Temp eros contr seed (28000250)LB65$20.00$18.80$20.00
23Temp ditch checks (28000305)LF28$30.00$23.40$25.00
24Inlet & pipe protect (28000500)EACH8$125.00$270.00$300.00
25Agg subgrade improve (30300011)TON2,077$19.00$30.00$47.00
26Agg base cse B (35101400)TON356$19.00$41.00$65.00
27Bit matls PR CT (40600275)LB6,707$1.00$0.60$1.00
28Bit matls tack CT (40600290)LB556$1.00$0.60$1.00
29Long joint sealant (40600370)LF577$18.00$15.00$17.00
30HMA BC IL-19.0 N50 (40603080)TON415$120.00$82.00$150.00
31HMA SC IL-9.5FG C N50 (40604000)TON87$170.00$127.00$195.00
32P HMA SC IL-9.5 C N50 (40604150)TON316$125.00$104.00$155.00
33PCC PVT 6 (42000100)SY290$135.00$78.00$99.00
34Protective coat (42001300)SY892$0.05$1.00$10.00
35Detectable warnings (42400800)SF56$65.00$41.00$42.00
36Pavement rem (44000100)SY2,873$9.00$3.30$15.00
37Drive pavement rem (44000200)SY138$10.00$4.20$20.00
38Comb curb gutter rem (44000500)LF1,205$5.50$8.00$18.00
39Rem exist struct (50100100)EACH1$90,000$152,000$290,000
40Pipe culvert remov (50105220)LF157$12.00$17.00$25.00
41Structure excavation (50200100)CY436$45.00$40.00$50.00
42Conc struct (50300225)CY74.80$1,350.00$1,350.00$2,895.00
43Conc sup-STR (50300255)CY252.60$1,100.00$1,350.00$1,525.00
44BR deck grooving (50300260)SY375$20.00$16.00$22.00
45Concrete encasement (50300280)CY44.90$875.00$1,450.00$485.00
46Protective coat (50300300)SY421$2.00$3.00$12.00
47Reinf bars, epoxy CTD (50800205)LB80,150$2.05$2.20$2.90
48Steel railing TY IL-OH (50900211)LF204$600.00$593.00$655.00
49Fur M S pile 12X0.250 (51200957)LF581$91.00$72.00$69.00
50Driving piles (51202305)LF581$1.00$0.10$1.00
51Test pile met shells (51203200)EACH2$8,500.00$8,800.00$15,000
52Name plates (51500100)EACH1$1,350.00$1,000.00$1,375.00
53Mech ST earth ret WL (52200500)SF615$160.00$150.00$360.00
54Drainage system for structures (52318802)LS1$57,400$70,000$70,000
55P cul CL C 1 12 (542C0217)LF36$66.00$89.00$122.00
56P cul CL C 1 18 (542C0223)LF52$74.00$93.00$145.00
57P cul CL C 2 18 (542C1063)LF64$76.00$81.00$145.00
58PRC flar end sec 12 (54213657)EACH2$1,700.00$1,900.00$1,900.00
59PRC flar end sec 18 (54213663)EACH4$1,900.00$2,100.00$2,250.00
60Storm sew CL A 2 12 (550A0340)LF28$66.00$83.00$147.00
61Granular backfill STR (58600101)CY234$48.00$85.00$120.00
62Geocomposite wall DR (59100100)SY102$11.00$41.00$30.00
63Conc HDWL for P drain (60100060)EACH4$375.00$430.00$685.00
64P undr for struct 4 (60146304)LF165$42.00$43.00$55.00
65Man TA 5 dia T1F OL (60221000)EACH1$4,400.00$4,100.00$7,400.00
66Man adjust (60255500)EACH2$2,100.00$1,600.00$1,050.00
67Inlets adjust (60260100)EACH1$950.00$1,900.00$1,400.00
68Valve box adj (60266600)EACH3$1,100.00$1,000.00$1,000.00
69Remov inlets (60500060)EACH2$750.00$500.00$1,400.00
70Comb CC&G TB6.18 (60604400)LF1,282$32.00$43.00$50.00
71Corrugated med (60624600)SF76$33.00$31.00$75.00
72Mobilization (67100100)LS1$95,000$111,544$160,000
73Remov sin pan assy TA (72400100)EACH2$125.00$150.00$300.00
74Terminal marker - DA (72501000)EACH4$55.00$50.00$55.00
75Paint PVT MK line 4 (78001110)LF170$4.00$3.00$32.00
IDOT contract 85779: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy