IDOT contract 85779 bid tabulation
Rock Falls, section 19-00137-00-BR. Let by Illinois DOT on November 7, 2025, Whiteside, District 02. 3 bids received; low bid $1,699,166 by Martin & Company Excavating.
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 75
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martin & Company Excavating | $1,699,166 | Low |
| 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,859,068 | +9.0% |
| 3 | Brandt Construction Co. | $2,671,051 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martin & Company Excavating | 2. Civil Constructors, Inc. d/b/a/ Helm Civil | 3. Brandt Construction Co. |
|---|---|---|---|---|---|---|
| 1 | Park bench rem & rel (X0320090) | EACH | 1 | $2,500.00 | $1,900.00 | $5,100.00 |
| 2 | Fold down bollards (X0350805) | EACH | 1 | $2,600.00 | $2,700.00 | $7,000.00 |
| 3 | Swing gate removal (X2300024) | EACH | 2 | $670.00 | $480.00 | $800.00 |
| 4 | Seeding CL 1B mod (X2500930) | ACRE | 0.44 | $4,400.00 | $3,800.00 | $4,200.00 |
| 5 | Woodland seeding SPL (X2510001) | SF | 11,812 | $0.20 | $0.14 | $0.15 |
| 6 | Eros cont blanket SPL (X2511630) | SY | 3,159 | $2.50 | $1.85 | $2.00 |
| 7 | Stone boulders SPL (X2600040) | EACH | 4 | $700.00 | $520.00 | $585.00 |
| 8 | Perimeter eros bar SP (X2800400) | LF | 1,857 | $21.00 | $18.40 | $20.00 |
| 9 | Stone riprap CL A4 SP (X2810108) | SY | 251 | $66.00 | $85.00 | $75.00 |
| 10 | Bar splicers special (X5080525) | EACH | 76 | $50.00 | $56.00 | $75.00 |
| 11 | Inlets SPL (X6024240) | EACH | 2 | $2,500.00 | $3,100.00 | $5,900.00 |
| 12 | Traf cont & prot SPL (X7010216) | LS | 1 | $10,000 | $7,950.00 | $9,000.00 |
| 13 | Construction layout (Z0013798) | LS | 1 | $7,500.00 | $14,000 | $24,000 |
| 14 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 15 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 16 | Tree remov 6-15 (20100110) | UNIT | 177 | $55.00 | $50.00 | $55.00 |
| 17 | Tree remov over 15 (20100210) | UNIT | 265 | $65.00 | $60.00 | $95.00 |
| 18 | Earth excavation (20200100) | CY | 1,823 | $28.00 | $21.00 | $40.00 |
| 19 | Rem & disp uns matl (20201200) | CY | 121 | $28.00 | $33.00 | $55.00 |
| 20 | Trench backfill (20800150) | CY | 34 | $48.00 | $36.00 | $77.00 |
| 21 | Topsoil exc & plac (21101505) | CY | 359 | $17.00 | $29.00 | $55.00 |
| 22 | Temp eros contr seed (28000250) | LB | 65 | $20.00 | $18.80 | $20.00 |
| 23 | Temp ditch checks (28000305) | LF | 28 | $30.00 | $23.40 | $25.00 |
| 24 | Inlet & pipe protect (28000500) | EACH | 8 | $125.00 | $270.00 | $300.00 |
| 25 | Agg subgrade improve (30300011) | TON | 2,077 | $19.00 | $30.00 | $47.00 |
| 26 | Agg base cse B (35101400) | TON | 356 | $19.00 | $41.00 | $65.00 |
| 27 | Bit matls PR CT (40600275) | LB | 6,707 | $1.00 | $0.60 | $1.00 |
| 28 | Bit matls tack CT (40600290) | LB | 556 | $1.00 | $0.60 | $1.00 |
| 29 | Long joint sealant (40600370) | LF | 577 | $18.00 | $15.00 | $17.00 |
| 30 | HMA BC IL-19.0 N50 (40603080) | TON | 415 | $120.00 | $82.00 | $150.00 |
| 31 | HMA SC IL-9.5FG C N50 (40604000) | TON | 87 | $170.00 | $127.00 | $195.00 |
| 32 | P HMA SC IL-9.5 C N50 (40604150) | TON | 316 | $125.00 | $104.00 | $155.00 |
| 33 | PCC PVT 6 (42000100) | SY | 290 | $135.00 | $78.00 | $99.00 |
| 34 | Protective coat (42001300) | SY | 892 | $0.05 | $1.00 | $10.00 |
| 35 | Detectable warnings (42400800) | SF | 56 | $65.00 | $41.00 | $42.00 |
| 36 | Pavement rem (44000100) | SY | 2,873 | $9.00 | $3.30 | $15.00 |
| 37 | Drive pavement rem (44000200) | SY | 138 | $10.00 | $4.20 | $20.00 |
| 38 | Comb curb gutter rem (44000500) | LF | 1,205 | $5.50 | $8.00 | $18.00 |
| 39 | Rem exist struct (50100100) | EACH | 1 | $90,000 | $152,000 | $290,000 |
| 40 | Pipe culvert remov (50105220) | LF | 157 | $12.00 | $17.00 | $25.00 |
| 41 | Structure excavation (50200100) | CY | 436 | $45.00 | $40.00 | $50.00 |
| 42 | Conc struct (50300225) | CY | 74.80 | $1,350.00 | $1,350.00 | $2,895.00 |
| 43 | Conc sup-STR (50300255) | CY | 252.60 | $1,100.00 | $1,350.00 | $1,525.00 |
| 44 | BR deck grooving (50300260) | SY | 375 | $20.00 | $16.00 | $22.00 |
| 45 | Concrete encasement (50300280) | CY | 44.90 | $875.00 | $1,450.00 | $485.00 |
| 46 | Protective coat (50300300) | SY | 421 | $2.00 | $3.00 | $12.00 |
| 47 | Reinf bars, epoxy CTD (50800205) | LB | 80,150 | $2.05 | $2.20 | $2.90 |
| 48 | Steel railing TY IL-OH (50900211) | LF | 204 | $600.00 | $593.00 | $655.00 |
| 49 | Fur M S pile 12X0.250 (51200957) | LF | 581 | $91.00 | $72.00 | $69.00 |
| 50 | Driving piles (51202305) | LF | 581 | $1.00 | $0.10 | $1.00 |
| 51 | Test pile met shells (51203200) | EACH | 2 | $8,500.00 | $8,800.00 | $15,000 |
| 52 | Name plates (51500100) | EACH | 1 | $1,350.00 | $1,000.00 | $1,375.00 |
| 53 | Mech ST earth ret WL (52200500) | SF | 615 | $160.00 | $150.00 | $360.00 |
| 54 | Drainage system for structures (52318802) | LS | 1 | $57,400 | $70,000 | $70,000 |
| 55 | P cul CL C 1 12 (542C0217) | LF | 36 | $66.00 | $89.00 | $122.00 |
| 56 | P cul CL C 1 18 (542C0223) | LF | 52 | $74.00 | $93.00 | $145.00 |
| 57 | P cul CL C 2 18 (542C1063) | LF | 64 | $76.00 | $81.00 | $145.00 |
| 58 | PRC flar end sec 12 (54213657) | EACH | 2 | $1,700.00 | $1,900.00 | $1,900.00 |
| 59 | PRC flar end sec 18 (54213663) | EACH | 4 | $1,900.00 | $2,100.00 | $2,250.00 |
| 60 | Storm sew CL A 2 12 (550A0340) | LF | 28 | $66.00 | $83.00 | $147.00 |
| 61 | Granular backfill STR (58600101) | CY | 234 | $48.00 | $85.00 | $120.00 |
| 62 | Geocomposite wall DR (59100100) | SY | 102 | $11.00 | $41.00 | $30.00 |
| 63 | Conc HDWL for P drain (60100060) | EACH | 4 | $375.00 | $430.00 | $685.00 |
| 64 | P undr for struct 4 (60146304) | LF | 165 | $42.00 | $43.00 | $55.00 |
| 65 | Man TA 5 dia T1F OL (60221000) | EACH | 1 | $4,400.00 | $4,100.00 | $7,400.00 |
| 66 | Man adjust (60255500) | EACH | 2 | $2,100.00 | $1,600.00 | $1,050.00 |
| 67 | Inlets adjust (60260100) | EACH | 1 | $950.00 | $1,900.00 | $1,400.00 |
| 68 | Valve box adj (60266600) | EACH | 3 | $1,100.00 | $1,000.00 | $1,000.00 |
| 69 | Remov inlets (60500060) | EACH | 2 | $750.00 | $500.00 | $1,400.00 |
| 70 | Comb CC&G TB6.18 (60604400) | LF | 1,282 | $32.00 | $43.00 | $50.00 |
| 71 | Corrugated med (60624600) | SF | 76 | $33.00 | $31.00 | $75.00 |
| 72 | Mobilization (67100100) | LS | 1 | $95,000 | $111,544 | $160,000 |
| 73 | Remov sin pan assy TA (72400100) | EACH | 2 | $125.00 | $150.00 | $300.00 |
| 74 | Terminal marker - DA (72501000) | EACH | 4 | $55.00 | $50.00 | $55.00 |
| 75 | Paint PVT MK line 4 (78001110) | LF | 170 | $4.00 | $3.00 | $32.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way