IDOT contract 93833 bid tabulation
Project Number: Aara-086 / /, section 05-00164-03-FP. Let by Illinois DOT on August 1, 2025, Sangamon, District 06. 2 bids received; low bid $6,690,296 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 101
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $6,690,296 | Low |
| 2 | Truman L. Flatt & Sons Co., Inc. | $7,722,589 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. | 2. Truman L. Flatt & Sons Co., Inc. |
|---|---|---|---|---|---|
| 1 | Storm sew CL B 1 8 (XX009453) | LF | 211 | $67.67 | $70.80 |
| 2 | Solar-power FB as CMP (X0326899) | EACH | 1 | $2,524.50 | $4,410.00 |
| 3 | Manhole special (X6020084) | EACH | 1 | $15,180 | $11,135 |
| 4 | Conc med TSB6.24 SPL (X6060300) | SF | 6,624 | $15.44 | $25.50 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $65,183 | $4,946.82 |
| 6 | Rem EX sign compl (X7240207) | EACH | 4 | $322.19 | $118.75 |
| 7 | Construction layout (Z0013798) | LS | 1 | $76,381 | $97,650 |
| 8 | Trainees (Z0076600) | HR | 3,000 | $0.80 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 3,000 | $15.00 | $15.00 |
| 10 | Tree remov acres (20100500) | ACRE | 0.50 | $26,182 | $25,179 |
| 11 | Earth excavation (20200100) | CY | 8,055 | $12.02 | $19.48 |
| 12 | Furnished excavation (20400800) | CY | 52,135 | $8.02 | $20.22 |
| 13 | Trench backfill (20800150) | CY | 318.30 | $147.91 | $76.06 |
| 14 | Topsoil exc & plac (21101505) | CY | 20,215 | $8.94 | $17.08 |
| 15 | Seeding CL 2 (25000200) | ACRE | 9.25 | $2,040.00 | $6,037.42 |
| 16 | Seeding CL 3 (25000300) | ACRE | 0.25 | $5,100.00 | $6,037.40 |
| 17 | Nitrogen fert nutr (25000400) | LB | 939 | $2.04 | $1.84 |
| 18 | Phosphorus fert nutr (25000500) | LB | 939 | $2.04 | $3.00 |
| 19 | Potassium fert nutr (25000600) | LB | 939 | $2.04 | $3.35 |
| 20 | Agr ground limestone (25000700) | TON | 21.80 | $102.00 | $315.00 |
| 21 | Mulch method 2 (25100115) | ACRE | 9.50 | $1,020.00 | $4,024.94 |
| 22 | Erosion contr blanket (25100630) | SY | 15,318 | $1.53 | $1.89 |
| 23 | Sodding salt tolerant (25200110) | SY | 6,743 | $19.38 | $12.76 |
| 24 | Supple watering (25200200) | UNIT | 337 | $204.00 | $0.01 |
| 25 | Temp eros contr seed (28000250) | LB | 931.25 | $5.10 | $4.99 |
| 26 | Temp ditch checks (28000305) | LF | 1,410 | $11.61 | $9.56 |
| 27 | Perimeter eros bar (28000400) | LF | 11,729 | $2.24 | $5.10 |
| 28 | Inlet & pipe protect (28000500) | EACH | 8 | $381.29 | $231.16 |
| 29 | Stone riprap CL B4 (28100127) | SY | 1,444 | $61.59 | $88.59 |
| 30 | Stone dump rip CL A1 (28100701) | SY | 1,444 | $29.21 | $28.17 |
| 31 | Filter fabric (28200200) | SY | 1,444 | $5.56 | $5.45 |
| 32 | Process mod soil 12 (30200650) | SY | 38,842 | $4.60 | $3.84 |
| 33 | Lime (30201500) | TON | 1,036 | $163.20 | $168.00 |
| 34 | Sub gran mat B 3 (31101191) | SY | 38,842 | $6.95 | $6.99 |
| 35 | Agg surf cse A 8 (40200700) | SY | 925 | $18.37 | $28.14 |
| 36 | Bit matls tack CT (40600290) | LB | 13,998 | $0.97 | $0.70 |
| 37 | Long joint sealant (40600370) | LF | 24,021 | $2.93 | $3.89 |
| 38 | Matl transfer device (40600405) | TON | 16,041 | $0.01 | $4.40 |
| 39 | P HMA SC IL-9.5 D N50 (40604160) | TON | 31 | $126.04 | $157.60 |
| 40 | HMA pavt FD 9 1/4 (40701866) | SY | 30,967 | $62.14 | $64.09 |
| 41 | Protective coat (42001300) | SY | 6,766 | $0.01 | $0.01 |
| 42 | PCC driveway pavt 8 (42300400) | SY | 269 | $123.19 | $104.69 |
| 43 | HMA surf rem 2 (44000157) | SY | 293 | $16.67 | $10.91 |
| 44 | Comb curb gutter rem (44000500) | LF | 48 | $18.71 | $22.53 |
| 45 | P cul CL A 1 36 (542A0241) | LF | 418 | $188.91 | $206.30 |
| 46 | P cul CL A 2 60 (542A1105) | LF | 179 | $425.12 | $383.23 |
| 47 | P cul CL C 1 18 (542C0223) | LF | 152 | $110.45 | $141.23 |
| 48 | P cul CL C 1 24 (542C0229) | LF | 46 | $117.12 | $115.01 |
| 49 | PRC flar end sec 12 (54213657) | EACH | 91 | $1,533.15 | $1,250.24 |
| 50 | PRC flar end sec 36 (54213681) | EACH | 6 | $3,514.61 | $2,788.80 |
| 51 | Cip RC end sec 60 (54215460) | EACH | 2 | $21,314 | $29,190 |
| 52 | Metal FL end sec 18" (54262718) | EACH | 6 | $428.48 | $394.64 |
| 53 | Metal FL end sec 24" (54262724) | EACH | 2 | $768.58 | $645.16 |
| 54 | Storm sew CL A 1 12 (550A0050) | LF | 2,035 | $106.48 | $93.88 |
| 55 | Conc HDWL for P drain (60100060) | EACH | 6 | $1,148.09 | $447.18 |
| 56 | Pipe drains 6 (60100915) | LF | 120 | $42.97 | $43.82 |
| 57 | Pipe drains 8 (60100925) | LF | 120 | $45.71 | $47.18 |
| 58 | Pipe drains 12 (60100945) | LF | 120 | $62.19 | $69.12 |
| 59 | Pipe underdr T 1 4 (60108104) | LF | 11,196 | $10.29 | $15.04 |
| 60 | Man TA 4 dia T3F&G (60218500) | EACH | 5 | $5,378.08 | $4,426.52 |
| 61 | Man TA 4 dia T11F&G (60219300) | EACH | 1 | $6,290.52 | $4,273.76 |
| 62 | Inlets TA T3F&G (60235700) | EACH | 98 | $2,017.96 | $2,197.87 |
| 63 | Inlets TA T11F&G (60236800) | EACH | 4 | $2,472.72 | $2,179.23 |
| 64 | Inlets TB T3F&G (60240220) | EACH | 2 | $3,576.72 | $2,862.15 |
| 65 | Comb CC&G TB6.18 (60604400) | LF | 48 | $113.86 | $103.56 |
| 66 | Comb CC&G TY B-6.24 (60605000) | LF | 20,766.50 | $44.00 | $42.84 |
| 67 | Conc median surf 4 (60618300) | SF | 592 | $15.94 | $8.99 |
| 68 | Conc thrust blocks (61000050) | EACH | 6 | $934.97 | $561.60 |
| 69 | Explor trench 52 (61100500) | LF | 1,120 | $3.62 | $12.65 |
| 70 | Misc concrete (61100605) | CY | 3 | $1,716.84 | $1,516.03 |
| 71 | Storm sew prot A 6 (61101007) | LF | 400 | $55.08 | $50.67 |
| 72 | Storm sew prot A 8 (61101009) | LF | 400 | $58.34 | $50.19 |
| 73 | Storm sew prot A 15 (61101017) | LF | 550 | $73.28 | $55.88 |
| 74 | Storm sew prot A 18 (61101020) | LF | 200 | $92.98 | $53.68 |
| 75 | Perm surv MKRS T1 (66700205) | EACH | 5 | $910.91 | $776.83 |
| 76 | Mobilization (67100100) | LS | 1 | $282,029 | $291,707 |
| 77 | TR cont & prot 701601 (70102630) | LS | 1 | $0.01 | $13,373 |
| 78 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 | $4,299.18 |
| 79 | Sign panel T1 (72000100) | SF | 118.90 | $42.33 | $37.86 |
| 80 | Sign panel T2 (72000200) | SF | 10 | $22.44 | $57.94 |
| 81 | Teles STL sin support (72800100) | LF | 36 | $15.81 | $26.22 |
| 82 | Wood sin support (73000100) | LF | 272 | $28.51 | $19.98 |
| 83 | Base tel STL sin supp (73100100) | EACH | 3 | $331.50 | $562.31 |
| 84 | PT PVT MK LTRS & symb (78001100) | SF | 162 | $3.06 | $3.15 |
| 85 | Paint PVT MK line 5 (78001120) | LF | 31,210 | $0.26 | $0.26 |
| 86 | Paint PVT MK line 6 (78001130) | LF | 1,581 | $0.37 | $0.38 |
| 87 | Paint PVT MK line 12 (78001150) | LF | 296 | $0.77 | $0.79 |
| 88 | Paint PVT MK line 24 (78001180) | LF | 175 | $4.08 | $4.20 |
| 89 | Raised refl pavt MKR (78100100) | EACH | 246 | $37.18 | $38.27 |
| 90 | Raised ref PVT MK rem (78300200) | EACH | 59 | $10.79 | $18.76 |
| 91 | PVT MKG rem WTR blast (78300202) | SF | 3,973 | $1.53 | $1.58 |
| 92 | Undrgrd C IM 2 (81028550) | LF | 148 | $78.03 | $80.33 |
| 93 | UD 2#8 #8G xlpuse 3/4 (81603000) | LF | 316 | $37.03 | $38.12 |
| 94 | EC C XLP use 1C 10 (81702110) | LF | 451 | $5.81 | $5.99 |
| 95 | Lum LED rdwy E (82110005) | EACH | 3 | $948.60 | $976.50 |
| 96 | Lum LED rdwy H (82110008) | EACH | 4 | $948.60 | $976.50 |
| 97 | LT cont pedm 240V 60 (82500330) | EACH | 1 | $26,010 | $26,775 |
| 98 | LT P A 40MH 15MA (83008600) | EACH | 2 | $8,262.00 | $8,505.00 |
| 99 | LT P A 45MH 12MA (83009500) | EACH | 3 | $8,017.20 | $8,253.00 |
| 100 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 3 | $2,019.60 | $2,079.00 |
| 101 | Bkwy dev cou SS SCRN (83800650) | EACH | 20 | $211.14 | $217.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.