INDOT contract B-42338-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on July 8, 2026, Grant, Greenfield. 5 bids received; low bid $738,823 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 81
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $738,823 | Low |
| 2 | E & B Paving LLC | $796,000 | +8.0% |
| 3 | Pontem Contractors Inc | $831,538 | +13% |
| 4 | American Contracting & Services Inc | $842,750 | +14% |
| 5 | Duncan Robertson Inc | $842,955 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. E & B Paving LLC | 3. Pontem Contractors Inc | 4. American Contracting & Services Inc | 5. Duncan Robertson Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,000 | $7,500.00 | $20,000 | $15,000 | $10,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 3 | $1,100.00 | $950.00 | $981.76 | $500.00 | $500.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $36,941 | $39,891 | $41,500 | $42,138 | $40,000 |
| 0012 | Pavement removal (202-02240) | SYS | 202 | $67.50 | $70.00 | $34.10 | $55.00 | $60.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $83,000 | $60,000 | $102,939 | $40,000 | $65,000 |
| 0014 | Sign, remove (202-74035) | EACH | 1 | $100.00 | $100.00 | $332.82 | $250.00 | $20.00 |
| 0015 | Pipe, remove (202-96133) | LFT | 108 | $12.00 | $10.00 | $25.01 | $15.00 | $15.00 |
| 0016 | Excavation, common (203-02000) | CYS | 70 | $97.00 | $250.00 | $90.75 | $250.00 | $75.00 |
| 0017 | Stormwater management budget (205-12108) | DOL | 12,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $1,600.00 | $7,500.00 | $4,815.58 | $20,000 | $18,000 |
| 0019 | Excavation, foundation, unclassified (206-51230) | CYS | 25 | $85.00 | $150.00 | $104.39 | $150.00 | $90.00 |
| 0020 | Cofferdam (206-51235) | LS | 1 | $25,000 | $30,000 | $51,513 | $20,000 | $16,000 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 91 | $90.00 | $200.00 | $41.23 | $110.00 | $125.00 |
| 0022 | Aggregate for end bent backfill (211-06467) | CYS | 8 | $215.00 | $300.00 | $139.19 | $200.00 | $300.00 |
| 0023 | Flowable backfill, non- removable (213-09269) | CYS | 5 | $460.00 | $500.00 | $279.61 | $1,000.00 | $650.00 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 280 | $8.00 | $5.00 | $7.92 | $15.00 | $5.00 |
| 0025 | Subbase for PCCP (302-06464) | CYS | 46 | $275.00 | $150.00 | $187.85 | $155.00 | $150.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 17 | $160.00 | $90.00 | $116.65 | $85.00 | $100.00 |
| 0027 | HMA patching, partial depth, type C (304-12626) | TON | 30 | $275.00 | $728.05 | $424.43 | $275.00 | $302.00 |
| 0028 | Milling, transition (306-08043) | SYS | 734 | $13.00 | $3.00 | $7.08 | $15.00 | $6.00 |
| 0029 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 81 | $130.00 | $331.28 | $139.10 | $130.00 | $143.00 |
| 0030 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 12 | $195.00 | $755.31 | $208.65 | $195.00 | $215.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 37 | $210.00 | $317.45 | $224.70 | $210.00 | $231.00 |
| 0032 | Joint adhesive (401-11526) | LFT | 780 | $0.75 | $0.86 | $0.80 | $0.75 | $0.82 |
| 0033 | Asphalt for tack coat (406-05521) | SYS | 1,060 | $0.43 | $0.60 | $0.46 | $0.43 | $0.47 |
| 0034 | Rcba crack filling, PCC sealer/healer (507-12941) | LFT | 30 | $20.00 | $90.97 | $97.34 | $50.00 | $40.00 |
| 0035 | Guardrail, remove (601-02241) | LFT | 450 | $3.50 | $5.00 | $3.75 | $3.50 | $5.00 |
| 0036 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 125 | $27.00 | $27.00 | $28.89 | $27.00 | $28.00 |
| 0037 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,500.00 | $3,500.00 | $3,745.00 | $3,500.00 | $4,180.00 |
| 0038 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,000.00 | $3,000.00 | $3,210.00 | $3,000.00 | $3,437.00 |
| 0039 | Barrier delineator (602-06729) | EACH | 8 | $40.00 | $22.50 | $75.66 | $100.00 | $25.00 |
| 0040 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 720 | $3.15 | $5.00 | $1.32 | $15.00 | $3.00 |
| 0041 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 176 | $195.00 | $250.00 | $253.54 | $250.00 | $225.00 |
| 0042 | Monument, type B (615-06505) | EACH | 2 | $1,800.00 | $1,800.00 | $1,926.00 | $1,800.00 | $1,320.00 |
| 0043 | Riprap, revetment (616-06405) | TON | 307 | $125.00 | $125.00 | $86.06 | $240.00 | $100.00 |
| 0044 | Geotextile for riprap, type 2A (616-12248) | SYS | 404 | $5.50 | $5.00 | $4.33 | $11.00 | $4.00 |
| 0045 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $425.00 | $425.00 | $454.75 | $500.00 | $467.00 |
| 0046 | Mulched seeding, type R (621-06559) | SYS | 1,400 | $2.20 | $2.20 | $2.35 | $3.00 | $2.40 |
| 0047 | Sodding (621-06574) | SYS | 46 | $48.75 | $48.75 | $116.85 | $50.00 | $53.00 |
| 0048 | Field office, type C (628-09403) | MOS | 12 | $3,325.00 | $3,250.00 | $3,179.64 | $4,800.00 | $2,500.00 |
| 0049 | Cored hole in concrete (702-03607) | EACH | 6 | $189.00 | $750.00 | $754.42 | $700.00 | $208.00 |
| 0050 | Field drilled hole in concrete (702-51863) | EACH | 440 | $14.00 | $15.00 | $18.93 | $30.00 | $15.00 |
| 0051 | Reinforcing bars, epoxy coated (703-06029) | LBS | 15,578 | $2.50 | $1.75 | $1.62 | $2.00 | $2.25 |
| 0052 | Inertial profiler, bridge encounter , STR. no. 1 (704-000080) | LS | 1 | $8,000.00 | $20,000 | $5,307.20 | $5,000.00 | $33,000 |
| 0053 | Corrective grinding, bridge encounter , STR. no. 1 (704-000082) | LS | 1 | $12,000 | $5,000.00 | $29,425 | $7,500.00 | $17,500 |
| 0054 | Railing, concrete type FC , modified (706-09960) | LFT | 145 | $180.00 | $87.00 | $93.09 | $87.00 | $140.00 |
| 0055 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $3,500.00 | $2,000.00 | $2,140.00 | $2,000.00 | $3,250.00 |
| 0056 | Surface seal , STR. no. 2 (709-51821) | LS | 1 | $4,000.00 | $5,000.00 | $3,864.58 | $4,500.00 | $9,000.00 |
| 0057 | Surface seal , STR. no.1 (709-51821) | LS | 1 | $1,200.00 | $5,000.00 | $2,772.30 | $2,000.00 | $5,000.00 |
| 0058 | Concrete surface coating , armorx (709-96826) | LS | 1 | $21,250 | $25,000 | $36,976 | $5,000.00 | $5,000.00 |
| 0059 | Patching concrete structures (710-09158) | SFT | 60 | $10.00 | $100.00 | $292.19 | $10.00 | $11.00 |
| 0060 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 114 | $38.00 | $10.00 | $19.60 | $50.00 | $15.00 |
| 0061 | Geotextile for underdrains, type 1A (718-12305) | SYS | 58 | $10.00 | $5.00 | $9.41 | $15.00 | $2.00 |
| 0062 | Hydrodemolition (722-01066) | SYS | 290 | $141.00 | $165.00 | $198.51 | $200.00 | $300.00 |
| 0063 | Bridge deck overlay budget (722-12380) | DOL | 6,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0064 | Bridge deck, remove concrete surface (722-12464) | SYS | 290 | $15.50 | $20.00 | $17.13 | $25.00 | $11.00 |
| 0065 | Longitudinal grooving (722-12732) | SYS | 466 | $8.00 | $10.00 | $22.98 | $15.00 | $9.00 |
| 0066 | Bridge deck patching, full depth (722-51401) | SFT | 79 | $60.00 | $0.01 | $71.91 | $140.00 | $100.00 |
| 0067 | Bridge deck overlay, latex modified (722-51842) | SYS | 290 | $160.00 | $250.00 | $173.00 | $225.00 | $300.00 |
| 0068 | Bridge deck patching, partial depth (722-51852) | SFT | 41 | $50.00 | $2.50 | $2.68 | $50.00 | $50.00 |
| 0069 | Warranted polymer overlay, bridge deck (738-12855) | SYS | 453 | $49.00 | $54.06 | $57.84 | $100.00 | $62.00 |
| 0070 | Road closure sign assembly (801-04308) | EACH | 9 | $300.00 | $300.00 | $265.36 | $175.00 | $330.00 |
| 0071 | Detour route marker assembly (801-06625) | EACH | 32 | $100.00 | $100.00 | $158.36 | $75.00 | $110.00 |
| 0072 | Construction sign, type A (801-06640) | EACH | 28 | $180.00 | $180.00 | $231.12 | $175.00 | $198.00 |
| 0073 | Maintaining traffic (801-06775) | LS | 1 | $21,600 | $15,000 | $11,776 | $30,000 | $47,500 |
| 0074 | Barricade, type III-A (801-07118) | LFT | 192 | $17.00 | $17.00 | $16.66 | $13.00 | $18.50 |
| 0075 | Barricade, type III-B (801-07119) | LFT | 144 | $17.00 | $17.00 | $16.66 | $13.00 | $18.50 |
| 0076 | Reference post (802-04893) | EACH | 2 | $200.00 | $200.00 | $214.00 | $200.00 | $495.00 |
| 0077 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 939 | $1.25 | $1.25 | $1.24 | $3.00 | $1.37 |
| 0078 | Grooving for pavement markings (808-12032) | LFT | 540 | $1.00 | $1.00 | $1.33 | $3.00 | $1.10 |
| 0079 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 118 | $1.75 | $1.75 | $1.24 | $3.00 | $1.92 |
| 0080 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 4 | $40.00 | $50.00 | $80.65 | $250.00 | $50.00 |
| 0081 | Snowplowable raised pavement marker (808-75998) | EACH | 4 | $100.00 | $100.00 | $98.44 | $250.00 | $275.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.