INDOT contract B-43329-A bid tabulation
BRIDGE DECK REPLACEMENT. Let by Indiana DOT on January 15, 2025, Jay, Wells, Fort Wayne. 5 bids received; low bid $1,933,270 by R L McCoy Inc.
- Owner
- Indiana DOT
- Letting
- 15 JAN 2025
- Pay items
- 87
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R L McCoy Inc | $1,933,270 | Low |
| 2 | Milestone Contractors LP | $1,996,398 | +3.0% |
| 3 | Beaty Construction Inc | $2,317,803 | +20% |
| 4 | His Constructors Inc | $2,442,364 | +26% |
| 5 | Duncan Robertson Inc | $2,478,842 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R L McCoy Inc | 2. Milestone Contractors LP | 3. Beaty Construction Inc | 4. His Constructors Inc | 5. Duncan Robertson Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $16,000 | $30,000 | $18,750 | $25,123 | $12,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $96,000 | $99,820 | $115,890 | $142,218 | $122,500 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $19,000 | $19,964 | $23,175 | $28,842 | $24,500 |
| 0012 | Debris, remove, structure no. 1 (201-90788) | LS | 1 | $2,500.00 | $10,000 | $5,200.00 | $3,668.97 | $24,500 |
| 0013 | Pavement removal (202-02240) | SYS | 444 | $60.00 | $46.00 | $52.13 | $123.51 | $50.00 |
| 0014 | Paved side ditch, remove (202-02272) | LFT | 80 | $30.00 | $33.00 | $30.00 | $45.95 | $15.00 |
| 0015 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $215,000 | $250,000 | $393,718 | $134,628 | $400,000 |
| 0016 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $70,000 | $53,182 | $125,000 | $60,424 | $200,000 |
| 0017 | Pipe, remove (202-96133) | LFT | 130 | $25.00 | $4.00 | $25.00 | $80.19 | $10.00 |
| 0018 | Excavation, common (203-02000) | CYS | 735 | $78.00 | $92.00 | $65.00 | $100.61 | $80.00 |
| 0019 | Linear grading (203-08607) | LFT | 510 | $5.00 | $5.00 | $15.00 | $33.12 | $10.00 |
| 0020 | Stormwater management budget (205-12108) | DOL | 12,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0021 | Stormwater management implementation (205-12616) | LS | 1 | $6,000.00 | $7,500.00 | $14,450 | $132,776 | $25,000 |
| 0022 | Excavation, foundation, unclassified (206-51230) | CYS | 40 | $95.00 | $85.00 | $120.00 | $90.34 | $200.00 |
| 0023 | Cofferdam (206-51235) | LS | 1 | $50,000 | $75,000 | $35,000 | $55,235 | $25,000 |
| 0024 | Subgrade treatment, type IC (207-09935) | SYS | 1,589 | $41.00 | $40.00 | $52.25 | $39.78 | $50.00 |
| 0025 | Aggregate for end bent backfill (211-06467) | CYS | 34 | $130.00 | $82.00 | $160.00 | $217.89 | $100.00 |
| 0026 | Flowable backfill, non- removable (213-09269) | CYS | 11 | $560.00 | $267.00 | $475.00 | $368.39 | $400.00 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 2,119 | $5.00 | $5.00 | $5.50 | $5.88 | $6.00 |
| 0028 | Subbase for PCCP (302-06464) | CYS | 114 | $160.00 | $117.00 | $130.00 | $164.60 | $100.00 |
| 0029 | Compacted aggregate, no. 53 (303-01180) | TON | 257 | $60.00 | $36.00 | $80.00 | $78.56 | $55.00 |
| 0030 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 242 | $16.00 | $14.00 | $6.65 | $29.32 | $15.00 |
| 0031 | Milling, transition (306-08043) | SYS | 1,834 | $5.50 | $5.00 | $9.00 | $11.78 | $5.00 |
| 0032 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 103 | $135.00 | $135.00 | $135.00 | $194.70 | $148.00 |
| 0033 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 190 | $135.00 | $135.00 | $135.00 | $194.70 | $148.00 |
| 0034 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 40 | $193.00 | $193.00 | $193.00 | $278.35 | $212.00 |
| 0035 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 284 | $103.00 | $103.00 | $103.00 | $148.55 | $113.00 |
| 0036 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 561 | $96.50 | $96.50 | $96.50 | $139.17 | $106.00 |
| 0037 | Joint adhesive, surface (401-10258) | LFT | 2,207 | $0.75 | $0.75 | $0.75 | $1.08 | $0.82 |
| 0038 | Joint adhesive, intermediate (401-10259) | LFT | 1,440 | $0.75 | $0.75 | $0.75 | $1.08 | $0.82 |
| 0039 | Liquid asphalt sealant , rpe (401-11785) | LFT | 2,207 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0040 | Asphalt for tack coat (406-05520) | TON | 3 | $1.00 | $1.00 | $1.00 | $144.22 | $1.10 |
| 0041 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 1 | $2,000.00 | $600.00 | $3,500.00 | $1,802.76 | $1,925.00 |
| 0042 | Guardrail, remove (601-02241) | LFT | 961 | $5.00 | $5.00 | $7.75 | $7.21 | $8.50 |
| 0043 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 75 | $19.00 | $19.00 | $30.00 | $27.40 | $33.00 |
| 0044 | Guardrail transition, MGS without curb (601-12292) | EACH | 8 | $3,150.00 | $3,150.00 | $3,015.00 | $4,542.95 | $3,315.00 |
| 0045 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,000.00 | $3,000.00 | $3,200.00 | $4,326.62 | $3,520.00 |
| 0046 | Barrier delineator (602-06729) | EACH | 20 | $27.00 | $11.33 | $20.00 | $34.45 | $30.00 |
| 0047 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 798 | $12.00 | $10.14 | $12.25 | $22.21 | $10.00 |
| 0048 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 452 | $190.00 | $200.00 | $230.00 | $312.93 | $235.00 |
| 0049 | Monument, type D (615-06515) | EACH | 1 | $110.00 | $110.00 | $262.00 | $158.65 | $288.00 |
| 0050 | Grout for riprap (616-02281) | CYS | 13 | $525.00 | $469.00 | $630.00 | $723.63 | $1,000.00 |
| 0051 | Riprap, revetment (616-06405) | TON | 203 | $210.00 | $56.00 | $123.00 | $152.80 | $100.00 |
| 0052 | Geotextile for riprap, type 1A (616-12246) | SYS | 367 | $4.00 | $5.00 | $4.00 | $20.42 | $4.00 |
| 0053 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $500.00 | $525.00 | $525.00 | $757.16 | $577.00 |
| 0054 | Mulched seeding, type R (621-06559) | SYS | 1,294 | $2.40 | $3.95 | $3.95 | $6.71 | $4.35 |
| 0055 | Water (621-06567) | KGAL | 2 | $1.00 | $5.00 | $5.00 | $7.21 | $5.50 |
| 0056 | Sodding (621-06574) | SYS | 79 | $45.00 | $34.75 | $34.75 | $50.12 | $38.00 |
| 0057 | Articulated concrete block (621-09815) | SYS | 97 | $950.00 | $681.00 | $585.00 | $597.47 | $500.00 |
| 0058 | Field office, type C (628-09403) | MOS | 12 | $3,400.00 | $3,457.00 | $4,850.00 | $3,425.24 | $2,750.00 |
| 0059 | Field drilled hole in concrete (702-51863) | EACH | 272 | $25.00 | $16.00 | $32.65 | $36.05 | $15.00 |
| 0060 | Reinforcing bars, epoxy coated (703-06029) | LBS | 108,960 | $1.25 | $1.75 | $1.55 | $1.62 | $1.75 |
| 0061 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 58 | $52.00 | $50.00 | $52.75 | $100.78 | $65.00 |
| 0062 | Concrete, C, superstructure (704-51002) | CYS | 234.30 | $1,475.00 | $1,400.00 | $1,500.00 | $1,840.13 | $1,500.00 |
| 0063 | Railing, concrete type FC (706-11600) | CYS | 26.30 | $900.00 | $1,200.00 | $1,175.00 | $1,297.99 | $1,400.00 |
| 0064 | Railing, concrete type FC , modified (706-11600) | CYS | 15.40 | $1,200.00 | $1,200.00 | $1,300.00 | $1,730.65 | $1,400.00 |
| 0065 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 8 | $2,250.00 | $2,250.00 | $2,070.00 | $3,244.97 | $2,000.00 |
| 0066 | Structural member, concrete, I-beam, 28 in. X 12 in. (707-05982) | LFT | 45 | $1,125.00 | $900.00 | $1,075.00 | $1,260.16 | $1,250.00 |
| 0067 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $500.00 | $3,000.00 | $1.00 | $3,605.51 | $3,000.00 |
| 0068 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $500.00 | $3,000.00 | $1.00 | $5,128.71 | $2,000.00 |
| 0069 | Patching concrete structures (710-09158) | SFT | 25 | $235.00 | $216.00 | $320.00 | $261.04 | $340.00 |
| 0070 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 130 | $25.00 | $18.00 | $15.00 | $37.49 | $18.00 |
| 0071 | Hydrodemolition (722-01066) | SYS | 282 | $130.00 | $150.00 | $140.00 | $104.47 | $275.00 |
| 0072 | Bridge deck overlay budget (722-12380) | DOL | 6,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0073 | Bridge deck, remove existing concrete surface (722-12464) | SYS | 282 | $12.00 | $15.00 | $31.00 | $27.45 | $15.00 |
| 0074 | Longitudinal grooving (722-12732) | SYS | 1,439 | $9.00 | $3.00 | $8.75 | $7.02 | $8.00 |
| 0075 | Bearing assembly, elastomeric (726-92406) | EACH | 2 | $1,400.00 | $1,750.00 | $1,820.00 | $2,970.87 | $3,000.00 |
| 0076 | Road closure sign assembly (801-04308) | EACH | 16 | $175.00 | $250.00 | $250.00 | $380.74 | $192.00 |
| 0077 | Detour route marker assembly (801-06625) | EACH | 88 | $75.00 | $145.00 | $145.00 | $235.08 | $82.00 |
| 0078 | Construction sign, type A (801-06640) | EACH | 28 | $175.00 | $155.00 | $155.00 | $311.52 | $192.00 |
| 0079 | Maintaining traffic (801-06775) | LS | 1 | $8,000.00 | $5,000.00 | $65,000 | $5,076.57 | $75,000 |
| 0080 | Barricade, type III-A (801-07118) | LFT | 206 | $16.00 | $14.00 | $14.00 | $22.58 | $17.50 |
| 0081 | Barricade, type III-B (801-07119) | LFT | 286 | $16.00 | $14.00 | $14.00 | $22.58 | $17.50 |
| 0082 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $400.00 | $400.00 | $411.00 | $576.89 | $452.00 |
| 0083 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 260 | $1.00 | $1.00 | $1.00 | $3.43 | $1.10 |
| 0084 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 2,073 | $1.00 | $1.00 | $1.00 | $0.81 | $1.10 |
| 0085 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 13 | $45.00 | $31.00 | $50.00 | $118.26 | $20.00 |
| 0086 | Bridge deck overlay, latex modified (722-51842) | SYS | 343 | $200.00 | ||||
| 0087 | Bridge deck overlay, silica fume modified (722-01061) | SYS | 343 | $120.00 | $128.25 | $136.25 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 15, 2025. Compiled by Mirage Metrics.