INDOT contract B-43729-A bid tabulation
REPLACE STRUCTURES, DECK OVERLAY, INTERSECTION IMPROVEMENT. Let by Indiana DOT on January 14, 2026, Scott, Seymour. 4 bids received; low bid $5,784,018 by Force Construction Co Inc.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 169
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Force Construction Co Inc | $5,784,018 | Low |
| 2 | Beaty Construction Inc | $6,351,580 | +10% |
| 3 | E & B Paving LLC | $7,046,500 | +22% |
| 4 | Mac Construction & Excavating Inc | $7,093,000 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Force Construction Co Inc | 2. Beaty Construction Inc | 3. E & B Paving LLC | 4. Mac Construction & Excavating Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $67,610 | $42,600 | $146,062 | $125,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $245,000 | $315,000 | $344,599 | $335,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $41,490 | $120,000 | $144,000 | $303,000 |
| 0012 | Pavement removal (202-02240) | SYS | 321 | $39.00 | $34.99 | $87.00 | $41.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $175,920 | $175,000 | $306,230 | $270,000 |
| 0014 | Fence, chain link, remove (202-91840) | LFT | 150 | $21.00 | $6.50 | $18.50 | $22.00 |
| 0015 | Guardrail end treatment, remove (202-93741) | EACH | 6 | $303.00 | $295.00 | $295.00 | $450.00 |
| 0016 | Pipe, remove (202-96133) | LFT | 100 | $140.00 | $60.24 | $18.50 | $61.00 |
| 0017 | Excavation, common (203-02000) | CYS | 11,969 | $26.00 | $24.46 | $52.00 | $27.00 |
| 0018 | Borrow (203-02070) | CYS | 215 | $57.00 | $46.53 | $10.00 | $48.00 |
| 0019 | Linear grading (203-08607) | LFT | 402 | $7.20 | $16.29 | $6.00 | $17.00 |
| 0020 | Settlement plate (204-02290) | EACH | 2 | $2,331.00 | $4,309.31 | $9,200.00 | $1,650.00 |
| 0021 | Pump around (205-11626) | EACH | 5 | $7,210.00 | $18,158 | $6,800.00 | $15,000 |
| 0022 | Stormwater management budget (205-12108) | DOL | 64,461 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0023 | Stormwater management implementation (205-12616) | LS | 1 | $15,710 | $16,942 | $35,000 | $42,400 |
| 0024 | SWQCP preparation (205-12618) | LS | 1 | $4,627.00 | $2,650.00 | $3,400.00 | $3,500.00 |
| 0025 | Cofferdam (206-51235) | LS | 1 | $34,920 | $19,945 | $17,000 | $40,000 |
| 0026 | Subgrade treatment, type II (207-08264) | SYS | 1,005 | $9.90 | $23.39 | $45.00 | $28.00 |
| 0027 | Subgrade treatment, type IC (207-09935) | SYS | 1,114 | $32.00 | $45.72 | $47.00 | $41.00 |
| 0028 | Subgrade treatment, type ibc (207-12635) | SYS | 4,007 | $19.00 | $45.41 | $44.00 | $31.00 |
| 0029 | B borrow (211-02050) | CYS | 1,426 | $58.00 | $60.24 | $130.00 | $55.00 |
| 0030 | Structure backfill, type 1 (211-09264) | CYS | 82 | $70.00 | $175.22 | $52.00 | $63.00 |
| 0031 | Structure backfill, type 2 (211-09265) | CYS | 136 | $78.00 | $126.72 | $52.00 | $43.00 |
| 0032 | Structure backfill, type 3 (211-09266) | CYS | 2,367 | $57.00 | $59.01 | $90.00 | $63.00 |
| 0033 | Structure backfill, type 5 (211-09268) | CYS | 213 | $205.00 | $924.29 | $188.00 | $300.00 |
| 0034 | Geogrid, type IB (214-11796) | SYS | 714 | $3.40 | $5.37 | $1.27 | $16.00 |
| 0035 | Geotextile for pavement, type 2A (214-12238) | SYS | 3,282 | $3.70 | $6.82 | $2.19 | $3.80 |
| 0036 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,512 | $4.40 | $6.63 | $3.13 | $4.80 |
| 0037 | Chemical modification, soils, cement (215-12637) | SYS | 960 | $21.00 | $34.73 | $13.75 | $31.70 |
| 0038 | Compacted aggregate, no. 8 (301-12233) | CYS | 1,947 | $59.00 | $88.66 | $86.28 | $67.00 |
| 0039 | Compacted aggregate, no. 53 (301-12234) | CYS | 41 | $100.00 | $129.74 | $96.71 | $94.00 |
| 0040 | Subbase for PCCP (302-06464) | CYS | 99 | $123.00 | $196.01 | $220.13 | $142.00 |
| 0041 | Compacted aggregate, no. 53 (303-01180) | TON | 382 | $49.00 | $67.83 | $68.81 | $84.00 |
| 0042 | Widening with HMA, type B (304-07493) | TON | 26 | $255.00 | $140.00 | $330.00 | $405.00 |
| 0043 | Widening with HMA, type C (304-07494) | TON | 386 | $256.00 | $140.00 | $200.00 | $162.00 |
| 0044 | HMA patching, full depth, type C (304-12625) | TON | 28 | $180.00 | $175.00 | $550.00 | $750.00 |
| 0045 | HMA patching, partial depth, type C (304-12626) | TON | 33 | $180.00 | $175.00 | $600.00 | $650.00 |
| 0046 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,443 | $9.20 | $7.91 | $12.00 | $5.00 |
| 0047 | Milling, transition (306-08043) | SYS | 440 | $8.70 | $14.50 | $9.10 | $12.00 |
| 0048 | Milling, profile (306-11872) | SYS | 3,147 | $4.30 | $7.69 | $7.01 | $5.00 |
| 0049 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 208 | $144.00 | $140.00 | $220.00 | $214.00 |
| 0050 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 558 | $144.00 | $140.00 | $170.00 | $112.00 |
| 0051 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 136 | $144.00 | $140.00 | $250.00 | $237.00 |
| 0052 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 343 | $144.00 | $140.00 | $170.00 | $104.00 |
| 0053 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 1,527 | $144.00 | $140.00 | $105.00 | $95.00 |
| 0054 | Joint adhesive (401-11526) | LFT | 5,112 | $0.50 | $0.69 | $0.10 | $0.42 |
| 0055 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 4,013 | $6.20 | $5.25 | $9.50 | $2.64 |
| 0056 | Asphalt for tack coat (406-05520) | TON | 6 | $617.00 | $600.00 | $1.00 | $1.00 |
| 0057 | Terminal joint, type HMA (503-12477) | LFT | 70 | $413.00 | $398.28 | $340.00 | $390.00 |
| 0058 | Guardrail terminal system, W-beam, curved, type 6 (601-01839) | EACH | 1 | $2,365.00 | $2,300.00 | $2,300.00 | $3,150.00 |
| 0059 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 1 | $2,211.00 | $2,150.00 | $2,150.00 | $3,000.00 |
| 0060 | Guardrail, W-beam, shop curved, 6 FT 3 in. spacing (601-02103) | LFT | 50 | $37.00 | $36.00 | $36.00 | $36.00 |
| 0061 | Guardrail, remove (601-02241) | LFT | 1,947.50 | $4.40 | $4.25 | $4.25 | $6.00 |
| 0062 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 573.25 | $22.00 | $21.00 | $21.00 | $26.00 |
| 0063 | Guardrail height transition, MGS (601-12289) | EACH | 2 | $925.00 | $900.00 | $900.00 | $1,000.00 |
| 0064 | Guardrail transition, MGS with curb (601-12291) | EACH | 2 | $3,347.00 | $3,255.00 | $3,255.00 | $3,600.00 |
| 0065 | Guardrail transition, MGS without curb (601-12292) | EACH | 6 | $3,290.00 | $3,200.00 | $3,200.00 | $3,500.00 |
| 0066 | Guardrail, W-beam, structure top-mounted posts (601-12422) | EACH | 6 | $566.00 | $550.00 | $550.00 | $650.00 |
| 0067 | Guardrail end treatment, type OS (601-94689) | EACH | 8 | $2,365.00 | $3,182.59 | $2,300.00 | $3,150.00 |
| 0068 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 75 | $23.00 | $22.00 | $22.00 | $26.00 |
| 0069 | Barrier delineator (602-06729) | EACH | 22 | $39.00 | $57.08 | $25.00 | $25.00 |
| 0070 | Fence, chain link, 48 in. (603-06045) | LFT | 150 | $51.00 | $50.00 | $50.00 | $75.00 |
| 0071 | Curb, integral concrete, type B (605-06095) | LFT | 10 | $207.00 | $227.08 | $285.00 | $125.00 |
| 0072 | Curb and gutter, concrete, type B (605-06145) | LFT | 72 | $68.00 | $99.67 | $180.00 | $65.00 |
| 0073 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 387.90 | $217.00 | $221.88 | $318.00 | $320.00 |
| 0074 | HMA for approaches, type B (610-07487) | TON | 414 | $144.00 | $140.00 | $140.00 | $137.00 |
| 0075 | Mailbox assembly, triple (611-02825) | EACH | 1 | $463.00 | $450.00 | $450.00 | $600.00 |
| 0076 | Right-of-way marker (615-06490) | EACH | 13 | $180.00 | $175.00 | $175.00 | $275.00 |
| 0077 | Monument, type B (615-06505) | EACH | 4 | $1,234.00 | $1,200.00 | $1,200.00 | $1,150.00 |
| 0078 | Benchmark post (615-06530) | EACH | 1 | $154.00 | $1,850.00 | $1,850.00 | $800.00 |
| 0079 | Riprap, class 1 (616-05688) | TON | 155 | $91.00 | $105.03 | $110.00 | $165.00 |
| 0080 | Borrow, cohesive (616-06025) | CYS | 8 | $706.00 | $80.40 | $680.24 | $235.00 |
| 0081 | Riprap, revetment (616-06405) | TON | 379 | $81.00 | $83.82 | $110.00 | $68.00 |
| 0082 | Geomembrane (616-09395) | SYS | 70 | $119.00 | $122.93 | $172.00 | $11.00 |
| 0083 | Geotextile for riprap, type 1A (616-12246) | SYS | 763 | $3.20 | $4.11 | $1.32 | $1.30 |
| 0084 | Geotextile for riprap, type 2A (616-12248) | SYS | 1,518 | $4.10 | $4.47 | $2.07 | $1.50 |
| 0085 | Geotextile for riprap, type 2B (616-12249) | SYS | 706 | $4.70 | $3.97 | $8.50 | $2.30 |
| 0086 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $2,262.00 | $1,000.00 | $937.50 | $900.00 |
| 0087 | Seed mixture, type R (621-06553) | LBS | 79 | $4.60 | $60.00 | $4.69 | $4.50 |
| 0088 | Mulched seeding, type U (621-06560) | SYS | 1,113 | $0.50 | $3.75 | $0.50 | $0.48 |
| 0089 | Mulching material (621-06565) | TON | 2 | $524.00 | $300.00 | $531.25 | $510.00 |
| 0090 | Water (621-06567) | KGAL | 5 | $5.10 | $0.01 | $5.21 | $5.00 |
| 0091 | Sodding (621-06574) | SYS | 91 | $51.00 | $12.00 | $52.08 | $50.00 |
| 0092 | Sodding, nursery (621-06575) | SYS | 765 | $7.20 | $12.00 | $7.29 | $7.00 |
| 0093 | Articulated concrete block (621-09815) | SYS | 103 | $294.00 | $180.55 | $604.09 | $200.00 |
| 0094 | Computer system equipment (628-11976) | EACH | 4 | $617.00 | $1,350.00 | $750.00 | $1,000.00 |
| 0095 | Field office, type D (628-12683) | MOS | 30 | $4,113.00 | $5,659.42 | $3,320.38 | $3,250.00 |
| 0096 | Topsoil processing and distribution (629-000149) | SYS | 1,880 | $8.50 | $8.92 | $25.66 | $10.50 |
| 0097 | Topsoil amendment budget (629-000150) | DOL | 3,760 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0098 | Dynamic pile load test (701-06011) | EACH | 2 | $2,287.00 | $3,005.86 | $1,200.00 | $5,100.00 |
| 0099 | Test pile, dynamic, production (701-09557) | LFT | 107 | $104.00 | $49.64 | $55.00 | $120.00 |
| 0100 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $2,287.00 | $2,404.68 | $600.00 | $4,000.00 |
| 0101 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 348 | $92.00 | $135.74 | $180.00 | $120.00 |
| 0102 | Concrete, A, substructure (702-51005) | CYS | 1.60 | $5,511.00 | $3,130.45 | $7,000.00 | $5,000.00 |
| 0103 | Field drilled hole in concrete (702-51863) | EACH | 50 | $34.00 | $37.99 | $30.00 | $35.00 |
| 0104 | Reinforcing bars, epoxy coated (703-06029) | LBS | 95,809 | $1.60 | $1.80 | $1.50 | $1.80 |
| 0105 | Embedded galvanic anode (703-08247) | EACH | 130 | $37.00 | $39.00 | $39.00 | $48.00 |
| 0106 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 133 | $49.00 | $47.30 | $35.00 | $40.00 |
| 0107 | Concrete, C, superstructure (704-51002) | CYS | 235.80 | $1,152.00 | $1,447.65 | $1,450.00 | $1,650.00 |
| 0108 | Railing, concrete type FC (706-11600) | CYS | 34.50 | $624.00 | $858.96 | $607.00 | $790.00 |
| 0109 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,057.00 | $1,369.78 | $2,000.00 | $1,300.00 |
| 0110 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1.00 | $1.00 | $1.00 | $3,544.00 |
| 0111 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $3,191.00 | $3,102.87 | $3,102.87 | $3,103.00 |
| 0112 | Patching concrete structures (710-09158) | SFT | 351 | $70.00 | $182.00 | $182.00 | $140.00 |
| 0113 | Structural steel , galvanized (711-51038) | LS | 1 | $704,170 | $825,000 | $745,175 | $745,000 |
| 0114 | Waterproofing membrane, type 2 (714-000086) | SFT | 6,606 | $3.70 | $0.94 | $3.28 | $6.50 |
| 0115 | Structure, reinforced concrete, box sections, 8 FT X 5 FT (714-11178) | LFT | 60 | $823.00 | $1,437.44 | $2,211.29 | $1,000.00 |
| 0116 | Structure, coated reinforced concrete, box sections, 15 FT X 4 FT (714-11634) | LFT | 76 | $1,836.00 | $2,347.04 | $3,160.59 | $2,300.00 |
| 0117 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 235 | $34.00 | $10.79 | $12.00 | $27.00 |
| 0118 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 76 | $125.00 | $149.78 | $162.47 | $190.00 |
| 0119 | Pipe, type 3, circular, diameter 18 in. (715-05171) | LFT | 91 | $112.00 | $109.90 | $165.14 | $180.00 |
| 0120 | Pipe, type 1, deformed, min. area 29 SFT (715-05263) | LFT | 60 | $530.00 | $842.64 | $1,432.63 | $760.00 |
| 0121 | Concrete anchor, min. area 29.5 SFT (715-06939) | EACH | 2 | $9,610.00 | $2,780.89 | $11,655 | $16,000 |
| 0122 | Pipe end section, diameter 18 in. (715-46010) | EACH | 2 | $1,089.00 | $1,391.63 | $1,332.89 | $1,800.00 |
| 0123 | Pipe end section, diameter 24 in. (715-46020) | EACH | 2 | $1,305.00 | $1,636.53 | $1,572.61 | $1,900.00 |
| 0124 | Pipe installation, trenchless, 36 in. (716-07635) | LFT | 106 | $966.00 | $1,605.02 | $1,195.20 | $1,150.00 |
| 0125 | Geotextile for underdrains, type 2A (718-12307) | SYS | 749 | $3.50 | $1.09 | $1.05 | $3.10 |
| 0126 | Geotextile for underdrains, type 2B (718-12308) | SYS | 184 | $6.60 | $3.83 | $7.25 | $3.10 |
| 0127 | Aggregate for underdrains (718-52610) | CYS | 19 | $80.00 | $49.31 | $90.00 | $82.60 |
| 0128 | Bridge deck overlay, rigid (722-000134) | SYS | 582 | $126.00 | $124.57 | $130.00 | $129.00 |
| 0129 | Hydrodemolition (722-01066) | SYS | 582 | $108.00 | $149.33 | $115.00 | $115.00 |
| 0130 | Bridge deck overlay budget (722-12380) | DOL | 11,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0131 | Bridge deck, remove concrete surface (722-12464) | SYS | 582 | $10.00 | $19.85 | $11.00 | $40.00 |
| 0132 | Longitudinal grooving (722-12732) | SYS | 1,652 | $3.50 | $3.50 | $6.00 | $7.30 |
| 0133 | Bridge deck patching, full depth (722-51401) | SFT | 112 | $84.00 | $581.68 | $40.00 | $96.00 |
| 0134 | Bearing assembly, elastomeric (726-92406) | EACH | 5 | $1,791.00 | $2,324.95 | $2,500.00 | $3,500.00 |
| 0135 | Face panels, concrete (731-93945) | SFT | 3,208 | $47.00 | $49.92 | $49.50 | $65.00 |
| 0136 | Wall erection (731-93946) | SFT | 3,208 | $24.00 | $19.08 | $23.00 | $22.00 |
| 0137 | Leveling pad, concrete (731-93947) | LFT | 202 | $56.00 | $53.69 | $71.00 | $55.00 |
| 0138 | Construction sign, type D (801-03291) | EACH | 2 | $206.00 | $200.00 | $216.85 | $200.00 |
| 0139 | Road closure sign assembly (801-04308) | EACH | 13 | $308.00 | $300.00 | $325.27 | $300.00 |
| 0140 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 17,011 | $2.20 | $1.98 | $2.15 | $1.98 |
| 0141 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 96 | $12.00 | $12.00 | $13.01 | $12.00 |
| 0142 | Detour route marker assembly (801-06625) | EACH | 28 | $125.00 | $122.00 | $132.28 | $122.00 |
| 0143 | Construction sign, type A (801-06640) | EACH | 54 | $195.00 | $190.00 | $206.01 | $190.00 |
| 0144 | Construction sign, type B (801-06645) | EACH | 8 | $113.00 | $110.00 | $119.27 | $110.00 |
| 0145 | Maintaining traffic (801-06775) | LS | 1 | $517,650 | $125,000 | $169,721 | $862,223 |
| 0146 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 6 | $11,200 | $9,466.67 | $10,271 | $11,350 |
| 0147 | Barricade, type III-A (801-07118) | LFT | 48 | $16.00 | $16.00 | $17.35 | $16.00 |
| 0148 | Barricade, type III-B (801-07119) | LFT | 372 | $16.00 | $16.00 | $17.35 | $16.00 |
| 0149 | Temporary traffic barrier, type 2 (801-08401) | LFT | 2,435 | $52.00 | $51.50 | $38.03 | $37.00 |
| 0150 | Vehicles for advanced slowdown (801-11880) | DAY | 40 | $2,435.00 | $1,362.67 | $2,300.00 | $250.00 |
| 0151 | Portable signal (801-12081) | LS | 1 | $16,980 | $20,000 | $14,000 | $20,050 |
| 0152 | Driveway assistance device (801-12482) | EACH | 2 | $5,404.00 | $6,000.00 | $3,200.00 | $9,730.00 |
| 0153 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $817.00 | $795.00 | $861.98 | $795.00 |
| 0154 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 127 | $22.00 | $21.00 | $21.00 | $35.55 |
| 0155 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 23 | $17.00 | $17.00 | $17.00 | $34.55 |
| 0156 | Sign, sheet assembly, relocate (802-07058) | EACH | 4 | $308.00 | $300.00 | $300.00 | $285.00 |
| 0157 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 14 | $29.00 | $28.00 | $28.00 | $39.55 |
| 0158 | Solar powered flashing LED sign assembly (805-11965) | EACH | 1 | $5,244.00 | $5,100.00 | $5,100.00 | $4,600.00 |
| 0159 | Line, multi-component, solid, white, 8 in. (808-10037) | LFT | 60 | $2.30 | $2.19 | $2.37 | $2.19 |
| 0160 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 4,982 | $1.00 | $0.96 | $1.04 | $0.96 |
| 0161 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 4,790 | $1.00 | $0.97 | $1.05 | $0.97 |
| 0162 | Grooving for pavement markings (808-12032) | LFT | 8,595 | $0.55 | $0.55 | $0.60 | $0.55 |
| 0163 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 127 | $1.20 | $1.17 | $1.27 | $1.17 |
| 0164 | Transverse marking, thermoplastic, crosshatch line, yellow, 24 in. (808-75290) | LFT | 182 | $11.00 | $11.00 | $11.93 | $11.00 |
| 0165 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 72 | $14.00 | $14.00 | $15.18 | $14.00 |
| 0166 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 3 | $190.00 | $185.00 | $200.59 | $185.00 |
| 0167 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 21 | $36.00 | $35.00 | $37.95 | $35.00 |
| 0168 | Snowplowable raised pavement marker (808-75998) | EACH | 20 | $77.00 | $75.00 | $81.32 | $75.00 |
| 0169 | Law enforcement officer (801-12324) | HRS | 100 | $60.00 | $60.00 | $60.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.