INDOT contract B-43819-A bid tabulation

BRIDGE DECK OVERLAY AND THIN DECK OVERLAY. Let by Indiana DOT on December 10, 2025, Grant, Fort Wayne. 5 bids received; low bid $628,700 by E & B Paving LLC.

Owner
Indiana DOT
Letting
10 DEC 2025
Pay items
80
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E & B Paving LLC$628,700Low
2His Constructors Inc$637,030+1.0%
3Pioneer Associates Inc$667,204+6.0%
4Milestone Contractors LP$673,151+7.0%
5Rieth-Riley Construction Co., Inc.$814,416+30%
INDOT contract B-43819-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E & B Paving LLC2. His Constructors Inc3. Pioneer Associates Inc4. Milestone Contractors LP5. Rieth-Riley Construction Co., Inc.
0001Construction engineering (105-06845)LS1$10,992$5,224.34$8,500.00$19,975$1.00
0002Railroad flagging budget (107-12976)DOL35,000$1.00$1.00$1.00$1.00$1.00
0003Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00
0004Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00
0008Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00
0009Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00
0010Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00
0011Mobilization and demobilization (110-01001)LS1$31,435$46,383$68,950$33,657$49,505
0012Clearing right-of-way (201-52370)LS1$6,287.00$6,300.00$13,500$6,731.00$5,000.00
0013Pavement removal (202-02240)SYS106$90.00$80.00$65.00$108.50$150.00
0014Bridge railing, remove (202-62420)LFT31$70.00$80.00$45.00$90.75$110.00
0015Pipe, remove (202-96133)LFT20$50.00$100.00$55.00$213.50$75.00
0016Excavation, common (203-02000)CYS10$160.00$472.49$200.00$282.00$300.00
0017Borrow (203-02070)CYS5$105.00$262.52$125.00$328.75$300.00
0018Linear grading (203-08607)LFT328$6.00$3.30$8.00$12.00$8.00
0019Stormwater management budget (205-12108)DOL12,222.50$1.00$1.00$1.00$1.00$1.00
0020Stormwater management implementation (205-12616)LS1$7,500.00$7,174.65$1,700.00$4,000.00$30,000
0021Cofferdam (206-51235)LS1$20,000$20,000$27,400$25,000$121,520
0022Compacted aggregate, no. 53 (301-12234)CYS2$430.00$533.25$200.00$1,125.00$350.00
0023Dense graded subbase (302-07455)CYS9$350.00$188.60$275.00$368.50$250.00
0024Compacted aggregate, no. 53 (303-01180)TON93$55.00$58.58$65.00$139.75$70.00
0025Milling, transition (306-08043)SYS1,162$5.00$7.32$4.00$10.00$11.00
0026QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON83$230.00$261.22$230.00$230.00$230.00
0027QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON2$1,000.00$1,135.73$1,000.00$1,000.00$1,000.00
0028QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON6$750.00$851.79$750.00$750.00$750.00
0029Joint adhesive (401-11526)LFT885$1.50$1.70$1.50$1.50$1.50
0030HMA wedge and level, type C (402-07452)TON28$300.00$340.72$300.00$300.00$300.00
0031Asphalt for tack coat (406-05520)TON0.60$600.00$681.43$600.00$600.00$600.00
0032Joints in PCCP, filled (507-08271)LFT37$15.00$17.04$24.00$12.25$15.00
0033Joints in PCCP, saw and seal (507-08272)LFT168$15.00$26.74$18.00$14.00$20.00
0034Guardrail, remove (601-02241)LFT631$5.25$10.00$5.25$5.25$5.25
0035Impact attenuator, R1-W1, TL-3 (601-06238)EACH1$35,000$35,775$31,500$34,625$25,370
0036Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT13$35.00$39.75$35.00$35.00$35.00
0037Guardrail height transition, MGS (601-12289)EACH2$983.00$1,116.42$983.00$983.00$983.00
0038Guardrail transition, MGS with curb (601-12291)EACH2$3,385.00$3,844.43$5,900.00$3,385.00$3,385.00
0039Guardrail transition, MGS without curb , modified, 2 FT 6 1/2 in. (601-12292)EACH3$3,310.00$3,759.25$3,310.00$3,310.00$3,310.00
0040Guardrail end treatment, type OS (601-94689)EACH3$2,250.00$2,555.38$3,200.00$2,250.00$2,250.00
0041Curb, integral concrete, type B (605-06095)LFT19$200.00$175.46$55.00$110.50$250.00
0042Milled HMA corrugations, conventional (606-12399)LFT630$13.16$17.69$5.00$12.00$12.00
0043Reinforced concrete bridge approach, 12 in. (609-06259)SYS106$275.00$333.07$310.00$279.75$200.00
0044Riprap, class 1 (616-05688)TON282$195.00$211.25$155.00$189.50$269.00
0045Riprap, revetment (616-06405)TON39$115.00$147.68$145.00$136.00$305.00
0046Riprap, uniform (616-06451)TON72$65.00$67.64$85.00$166.25$133.00
0047Geotextile for riprap, type 1A (616-12246)SYS296$5.00$4.40$4.00$6.75$4.00
0048Clean drains (619-98427)EACH14$300.00$264.07$125.00$370.25$300.00
0049Mobilization and demobilization for seeding (621-01004)EACH1$400.00$454.29$400.00$750.00$400.00
0050Mulched seeding, type R (621-06559)SYS481$3.28$5.91$3.50$6.50$3.28
0051Water (621-06567)KGAL3$10.00$11.36$10.00$10.00$10.00
0052Sodding (621-06574)SYS30$56.50$64.17$56.00$75.00$56.50
0053Field drilled hole in concrete (702-51863)EACH20$75.00$102.25$65.00$30.75$100.00
0054Reinforcing bars, epoxy coated (703-06029)LBS7,271$1.50$1.70$2.25$3.00$4.00
0055Threaded tie bar assembly, epoxy coated (703-97936)EACH20$60.00$47.69$90.00$73.50$200.00
0056Concrete bridge railing transition, type TFC (706-11620)EACH2$5,000.00$7,382.22$5,700.00$5,250.00$9,000.00
0057Surface seal , bridge no. 1 (709-51821)LS1$5,000.00$1,421.04$2,500.00$3,625.00$1,251.22
0058Surface seal , bridge no. 2 (709-51821)LS1$5,000.00$2,271.00$3,500.00$3,875.00$1,999.60
0059Patching concrete structures (710-09158)SFT50$50.00$56.79$250.00$193.00$165.00
0060Pipe extension, circular, diameter 18 in. , CMP (715-05596)LFT20$250.00$121.57$110.00$190.75$250.00
0061Bridge deck overlay, rigid (722-000134)SYS368$160.00$119.55$180.00$159.00$175.00
0062Hydrodemolition (722-01066)SYS368$130.00$91.23$115.00$108.25$120.00
0063Bridge deck overlay budget (722-12380)DOL7,225$1.00$1.00$1.00$1.00$1.00
0064Bridge deck, remove concrete surface (722-12464)SYS368$15.00$46.18$20.00$16.00$15.00
0065Longitudinal grooving (722-12732)SYS368$13.00$9.27$9.00$8.16$15.00
0066Bridge deck patching, full depth (722-51401)SFT50$25.00$134.57$65.00$111.75$1.00
0067Bridge deck patching, partial depth (722-51852)SFT110$2.50$2.84$5.00$5.00$2.50
0068Warranted polymer overlay, bridge deck (738-12855)SYS405$49.66$56.40$48.00$48.00$60.00
0069Polymer overlay, other concrete surface (738-12856)SYS202$38.17$43.35$41.00$41.00$38.17
0070Construction sign, type C (801-03290)EACH4$200.00$227.15$200.00$300.00$300.00
0071Road closure sign assembly (801-04308)EACH10$300.00$340.72$300.00$175.00$175.00
0072Detour route marker assembly (801-06625)EACH113$125.00$141.97$125.00$75.00$75.00
0073Construction sign, type A (801-06640)EACH28$195.00$221.47$195.00$175.00$175.00
0074Construction sign, type B (801-06645)EACH6$105.00$119.25$105.00$50.00$50.00
0075Maintaining traffic (801-06775)LS1$30,000$2,319.15$23,500$26,881$25,000
0076Barricade, type III-A (801-07118)LFT184$15.55$17.66$16.00$14.00$14.00
0077Barricade, type III-B (801-07119)LFT176$15.55$17.66$16.00$14.00$14.00
0078Line, paint, broken, yellow, 6 in. (808-12764)LFT73$1.30$1.48$1.30$1.50$1.50
0079Line, paint, solid, white, 6 in. (808-75007)LFT986$1.00$1.14$1.00$1.00$1.00
0080Line, paint, solid, yellow, 6 in. (808-75047)LFT406$1.00$1.14$1.00$1.00$1.00
INDOT contract B-43819-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy