INDOT contract B-44104-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on September 2, 2026, White, LaPorte. 4 bids received; low bid $2,964,420 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 92
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $2,964,420 | Low |
| 2 | Duncan Robertson Inc | $3,027,174 | +2.0% |
| 3 | Icc Group Inc | $3,950,000 | +33% |
| 4 | Rieth-Riley Construction Co., Inc. | $4,312,858 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Duncan Robertson Inc | 3. Icc Group Inc | 4. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $40,000 | $30,000 | $45,150 | $76,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $131,000 | $150,000 | $193,648 | $215,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $32,000 | $30,000 | $39,000 | $40,000 |
| 0012 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $67,300 | $125,000 | $332,855 | $224,000 |
| 0013 | Present structure, remove, structure no. 2 (202-51330) | LS | 1 | $77,300 | $125,000 | $300,246 | $263,000 |
| 0014 | Excavation, common (203-02000) | CYS | 385 | $104.00 | $15.00 | $65.00 | $138.00 |
| 0015 | Borrow (203-02070) | CYS | 456 | $11.50 | $1.00 | $75.00 | $20.00 |
| 0016 | Excavation, waterway (203-51223) | CYS | 551 | $80.00 | $15.00 | $45.00 | $48.50 |
| 0017 | Stormwater management budget (205-12108) | DOL | 26,600 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $2,110.00 | $30,000 | $41,902 | $22,500 |
| 0019 | Excavation, foundation, unclassified (206-51230) | CYS | 363 | $90.50 | $80.00 | $60.00 | $55.00 |
| 0020 | Cofferdam (206-51235) | LS | 1 | $79,375 | $100,000 | $390,000 | $437,000 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 1,702 | $42.78 | $60.00 | $50.00 | $44.00 |
| 0022 | Aggregate for end bent backfill (211-06467) | CYS | 54 | $250.00 | $150.00 | $105.00 | $135.00 |
| 0023 | Structure backfill, type 2 (211-09265) | CYS | 58 | $104.00 | $150.00 | $105.00 | $110.00 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,840 | $12.00 | $4.00 | $5.50 | $5.00 |
| 0025 | Compacted aggregate, no. 8 (301-12233) | CYS | 50 | $82.00 | $150.00 | $100.00 | $165.00 |
| 0026 | Subbase for PCCP (302-06464) | CYS | 84 | $224.00 | $180.00 | $115.00 | $230.00 |
| 0027 | Compacted aggregate, no. 53 (303-01180) | TON | 511 | $69.00 | $75.00 | $45.00 | $61.00 |
| 0028 | Widening with HMA, type B (304-07493) | TON | 92 | $210.00 | $164.00 | $149.00 | $149.00 |
| 0029 | Milling, transition (306-08043) | SYS | 679 | $18.00 | $10.00 | $11.00 | $30.00 |
| 0030 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 185 | $176.10 | $258.00 | $235.00 | $235.00 |
| 0031 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 185 | $166.00 | $189.00 | $172.00 | $172.00 |
| 0032 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 438 | $151.80 | $130.00 | $118.00 | $118.00 |
| 0033 | Joint adhesive (401-11526) | LFT | 3,452 | $1.00 | $0.27 | $0.25 | $0.25 |
| 0034 | Asphalt for tack coat (406-05521) | SYS | 3,707 | $0.30 | $0.27 | $0.25 | $0.25 |
| 0035 | Guardrail terminal system, W-beam, curved, modified (601-01704) | EACH | 4 | $2,000.00 | $2,200.00 | $2,000.00 | $2,000.00 |
| 0036 | Guardrail terminal system, W-beam, curved, type 8 (601-05585) | EACH | 1 | $2,298.00 | $2,528.00 | $2,298.00 | $2,298.00 |
| 0037 | Guardrail transition, type TGS-1 , modified (601-06374) | EACH | 8 | $1,150.00 | $1,265.00 | $1,150.00 | $1,150.00 |
| 0038 | Hand dig guardrail post holes (601-09238) | EACH | 6 | $105.00 | $115.00 | $105.00 | $105.00 |
| 0039 | Guardrail end treatment, type OS , SKT-350 (601-94689) | EACH | 3 | $2,800.00 | $3,700.00 | $2,800.00 | $2,800.00 |
| 0040 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 206.25 | $20.00 | $22.00 | $20.00 | $20.00 |
| 0041 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 327.40 | $190.00 | $300.00 | $230.00 | $180.00 |
| 0042 | Right-of-way marker (615-06490) | EACH | 17 | $135.00 | $148.00 | $135.00 | $135.00 |
| 0043 | Monument, type B (615-06505) | EACH | 4 | $881.00 | $969.00 | $881.00 | $881.00 |
| 0044 | Benchmark post (615-06530) | EACH | 2 | $1,180.00 | $250.00 | $2,000.00 | $1,800.00 |
| 0045 | Riprap, class 2 (616-05689) | TON | 781 | $145.00 | $110.00 | $140.00 | $140.00 |
| 0046 | Riprap, revetment (616-06405) | TON | 931 | $85.00 | $60.00 | $90.00 | $95.00 |
| 0047 | Riprap, uniform (616-06451) | TON | 14 | $200.00 | $60.00 | $250.00 | $235.00 |
| 0048 | Geotextile for riprap, type 1A (616-12246) | SYS | 2,043 | $1.55 | $3.00 | $4.00 | $4.00 |
| 0049 | Geotextile for riprap, type 2A (616-12248) | SYS | 284 | $3.00 | $3.00 | $6.00 | $7.50 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $425.00 | $470.00 | $425.00 | $637.50 |
| 0051 | Erosion control blanket (621-02770) | SYS | 1,771 | $3.05 | $3.35 | $3.04 | $3.04 |
| 0052 | Mulched seeding, type R (621-06559) | SYS | 1,771 | $2.10 | $2.30 | $2.10 | $2.10 |
| 0053 | Water (621-06567) | KGAL | 2 | $10.00 | $11.00 | $10.00 | $10.00 |
| 0054 | Sodding (621-06574) | SYS | 366 | $12.65 | $14.00 | $12.65 | $22.00 |
| 0055 | Permanent turf reinforcement mat (621-08161) | SYS | 63 | $24.00 | $26.00 | $23.50 | $23.50 |
| 0056 | Field office, type C (628-09403) | MOS | 15 | $4,000.00 | $2,500.00 | $2,406.67 | $3,650.00 |
| 0057 | Pile, steel pipe, 0.375 in., diameter 14 in. (701-08122) | LFT | 660 | $164.00 | $100.00 | $105.00 | $116.00 |
| 0058 | Test pile, dynamic, production (701-09557) | LFT | 313 | $63.00 | $80.00 | $105.00 | $90.00 |
| 0059 | Test pile, indicator, production (701-09558) | LFT | 162 | $88.00 | $90.00 | $120.00 | $118.00 |
| 0060 | Test pile, dynamic, restrike (701-09559) | EACH | 4 | $5,800.00 | $7,500.00 | $5,500.00 | $5,150.00 |
| 0061 | Test pile, indicator, restrike (701-09560) | EACH | 4 | $1,210.00 | $1,000.00 | $2,500.00 | $5,150.00 |
| 0062 | Conical pile tip, 14 in. (701-09679) | EACH | 26 | $600.00 | $600.00 | $400.00 | $500.00 |
| 0063 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 22 | $187.00 | $250.00 | $150.00 | $200.00 |
| 0064 | Reinforced concrete encasement for H piles (701-12709) | LFT | 252 | $235.00 | $275.00 | $310.00 | $350.00 |
| 0065 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 1,227 | $129.00 | $60.00 | $90.00 | $96.00 |
| 0066 | Concrete, A, substructure (702-51005) | CYS | 131.20 | $1,125.00 | $950.00 | $1,600.00 | $1,725.00 |
| 0067 | Concrete, B, footings (702-51015) | CYS | 8.40 | $1,680.00 | $950.00 | $1,600.00 | $1,300.00 |
| 0068 | Field drilled hole in concrete (702-51863) | EACH | 16 | $34.00 | $15.00 | $20.00 | $60.00 |
| 0069 | Threaded tie bar assembly , galvanized (703-01540) | EACH | 58 | $1.00 | $90.00 | $70.00 | $80.00 |
| 0070 | Reinforcing bars , galvanized (703-06028) | LBS | 114,121 | $2.18 | $3.00 | $2.00 | $2.55 |
| 0071 | Concrete, C, superstructure (704-51002) | CYS | 344.90 | $1,260.00 | $1,100.00 | $1,700.00 | $1,960.00 |
| 0072 | Railing, steel type TS-1 (706-06344) | LFT | 362.50 | $78.00 | $86.00 | $78.00 | $100.00 |
| 0073 | Structural member, concrete, box beam, 17 in. X 48 in. (707-11497) | LFT | 456 | $570.00 | $650.00 | $500.00 | $660.00 |
| 0074 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1.00 | $2,500.00 | $2,970.00 | $1.00 |
| 0075 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $1.00 | $2,500.00 | $2,970.00 | $1.00 |
| 0076 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 120 | $15.00 | $15.00 | $27.00 | $52.00 |
| 0077 | Pipe, type 4, circular, diameter 10 in. (715-05051) | LFT | 180 | $25.00 | $30.00 | $37.00 | $130.00 |
| 0078 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 385 | $97.00 | $85.00 | $75.00 | $195.00 |
| 0079 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 194 | $13.00 | $15.00 | $30.00 | $20.00 |
| 0080 | Pipe end section, diameter 15 in. (715-46005) | EACH | 10 | $900.00 | $600.00 | $2,000.00 | $1,650.00 |
| 0081 | Geotextile for underdrains, type 2A (718-12307) | SYS | 643 | $5.50 | $3.00 | $3.94 | $6.00 |
| 0082 | Longitudinal grooving (722-12732) | SYS | 996.80 | $3.40 | $8.50 | $8.00 | $12.00 |
| 0083 | Bearing assembly, elastomeric (726-92406) | EACH | 32 | $365.00 | $690.00 | $800.00 | $300.00 |
| 0084 | Road closure sign assembly (801-04308) | EACH | 9 | $244.00 | $268.00 | $244.00 | $244.00 |
| 0085 | Detour route marker assembly (801-06625) | EACH | 41 | $149.00 | $165.00 | $149.00 | $149.00 |
| 0086 | Construction sign, type A (801-06640) | EACH | 20 | $192.00 | $211.00 | $192.00 | $192.00 |
| 0087 | Maintaining traffic (801-06775) | LS | 1 | $4,139.62 | $40,000 | $3,500.00 | $65,000 |
| 0088 | Barricade, type III-A (801-07118) | LFT | 96 | $15.00 | $16.50 | $14.98 | $14.98 |
| 0089 | Barricade, type III-B (801-07119) | LFT | 120 | $15.00 | $16.50 | $14.98 | $14.98 |
| 0090 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 2,060 | $0.90 | $1.00 | $0.88 | $0.88 |
| 0091 | Grooving for pavement markings (808-12032) | LFT | 1,472 | $0.76 | $0.90 | $0.76 | $0.76 |
| 0092 | Dynamic pile load test (701-06011) | EACH | 4 | $7,800.00 | $7,500.00 | $5,000.00 | $5,700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.