INDOT contract B-44329-A bid tabulation
SCOUR PROTECTION. Let by Indiana DOT on April 9, 2025, Johnson, Seymour. 5 bids received; low bid $512,778 by Force Construction Co Inc.
- Owner
- Indiana DOT
- Letting
- 09 APR 2025
- Pay items
- 31
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Force Construction Co Inc | $512,778 | Low |
| 2 | His Constructors Inc | $697,775 | +36% |
| 3 | Yarberry Companies Inc | $860,869 | +68% |
| 4 | 5 Star Company Inc | $979,369 | +91% |
| 5 | Morphey Construction Inc. | $1,534,267 | +199% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Force Construction Co Inc | 2. His Constructors Inc | 3. Yarberry Companies Inc | 4. 5 Star Company Inc | 5. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $5,008.00 | $8,724.37 | $20,000 | $12,500 | $50,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Mobilization and demobilization (110-01001) | LS | 1 | $25,000 | $32,711 | $41,000 | $194,500 | $76,650 |
| 0008 | Clearing and grubbing (201-01015) | LS | 1 | $11,620 | $15,686 | $60,000 | $22,000 | $30,660 |
| 0009 | Clearing right-of-way (201-52370) | LS | 1 | $11,620 | $27,346 | $60,000 | $33,650 | $30,660 |
| 0010 | Debris, remove, structure no. 1 (201-90788) | LS | 1 | $11,620 | $3,352.31 | $30,000 | $40,000 | $50,000 |
| 0011 | Stormwater management budget (205-12108) | DOL | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Stormwater management implementation (205-12616) | LS | 1 | $9,708.00 | $70,340 | $6,000.00 | $5,000.00 | $30,000 |
| 0013 | Cofferdam , structure no. 1 (206-51235) | LS | 1 | $104,280 | $213,802 | $185,000 | $112,000 | $500,000 |
| 0014 | Compacted aggregate, no. 53 (301-12234) | CYS | 10 | $258.00 | $124.66 | $250.00 | $650.00 | $100.00 |
| 0015 | Riprap, class 1 (616-05688) | TON | 168 | $134.00 | $117.59 | $400.00 | $235.00 | $210.00 |
| 0016 | Riprap, revetment (616-06405) | TON | 160 | $109.00 | $60.60 | $400.00 | $185.00 | $170.00 |
| 0017 | Geotextile for riprap, type 1A (616-12246) | SYS | 391 | $5.40 | $15.70 | $20.00 | $6.00 | $5.00 |
| 0018 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,162.00 | $763.38 | $800.00 | $1,250.00 | $700.00 |
| 0019 | Mulched seeding, type R (621-06559) | SYS | 49 | $58.00 | $37.03 | $15.00 | $68.00 | $440.00 |
| 0020 | Seed mixture, floodplain (621-12612) | LBS | 7 | $349.00 | $741.57 | $1,200.00 | $400.00 | $2,000.00 |
| 0021 | Plant, deciduous shrub, 18 in. to 24 in. (622-05639) | EACH | 16 | $151.00 | $114.51 | $95.00 | $155.00 | $105.00 |
| 0023 | Temporary causeway , structure no. 1 (713-04331) | LS | 1 | $121,960 | $222,457 | $185,000 | $287,000 | $500,000 |
| 0024 | Temporary bridge (713-04858) | LS | 1 | $27,110 | $14,834 | $40,000 | $110,000 | $75,000 |
| 0025 | Road closure sign assembly (801-04308) | EACH | 8 | $320.00 | $463.48 | $220.00 | $190.00 | $175.00 |
| 0026 | Detour route marker assembly (801-06625) | EACH | 19 | $180.00 | $224.65 | $100.00 | $105.00 | $75.00 |
| 0027 | Construction sign, type A (801-06640) | EACH | 19 | $168.00 | $286.81 | $220.00 | $165.00 | $175.00 |
| 0028 | Construction sign, type B (801-06645) | EACH | 4 | $99.00 | $100.33 | $100.00 | $150.00 | $75.00 |
| 0029 | Maintaining traffic (801-06775) | LS | 1 | $93,000 | $1,786.31 | $40,000 | $36,590 | $56,000 |
| 0030 | Barricade, type III-A (801-07118) | LFT | 48 | $17.00 | $18.54 | $21.00 | $19.00 | $18.00 |
| 0031 | Barricade, type III-B (801-07119) | LFT | 96 | $17.00 | $20.72 | $21.00 | $19.00 | $18.00 |
| 0032 | Plant, deciduous tree, single stem, 1.25 in. or under (622-05648) | EACH | 75 | $151.00 | $114.51 | $195.00 | $178.00 | $105.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 9, 2025. Compiled by Mirage Metrics.