INDOT contract B-44619-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on October 7, 2026, Jay, Greenfield. 6 bids received; low bid $1,669,080 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 86
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $1,669,080 | Low |
| 2 | Milestone Contractors LP | $1,727,799 | +4.0% |
| 3 | Jutte Excavating II, Inc. | $1,743,345 | +4.0% |
| 4 | E & B Paving LLC | $1,859,536 | +11% |
| 5 | Beaty Construction Inc | $1,961,960 | +18% |
| 6 | Pontem Contractors Inc | $2,095,256 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Milestone Contractors LP | 3. Jutte Excavating II, Inc. | 4. E & B Paving LLC | 5. Beaty Construction Inc | 6. Pontem Contractors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $10,000 | $28,000 | $10,000 | $18,500 | $18,508 | $18,585 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $2,000.00 | $2,000.00 | $200.00 | $1,200.00 | $3,650.00 | $490.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $82,500 | $86,390 | $122,500 | $92,975 | $95,000 | $103,150 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $47,500 | $51,834 | $30,000 | $55,786 | $32,500 | $40,000 |
| 0012 | Pavement removal (202-02240) | SYS | 1,384 | $45.00 | $36.00 | $10.00 | $25.00 | $20.00 | $31.50 |
| 0013 | Paved side ditch, remove (202-02272) | LFT | 35 | $10.00 | $46.00 | $30.00 | $12.00 | $20.00 | $60.00 |
| 0014 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $105,000 | $62,000 | $150,000 | $114,800 | $250,800 | $182,519 |
| 0015 | Excavation, common (203-02000) | CYS | 1,435 | $30.00 | $55.00 | $20.10 | $55.00 | $50.00 | $92.00 |
| 0016 | Excavation, waterway (203-51223) | CYS | 490 | $55.00 | $60.00 | $20.00 | $70.00 | $37.00 | $90.00 |
| 0017 | Pump around (205-11626) | EACH | 1 | $5,000.00 | $14,000 | $5,000.00 | $22,500 | $25,000 | $75,000 |
| 0018 | Stormwater management budget (205-12108) | DOL | 23,250 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $20,000 | $2,300.00 | $20,000 | $42,000 | $6,200.00 | $3,588.00 |
| 0020 | SWQCP preparation (205-12618) | LS | 1 | $2,250.00 | $1,500.00 | $20,000 | $2,000.00 | $3,400.00 | $48,625 |
| 0021 | Excavation, foundation, unclassified (206-51230) | CYS | 160 | $55.00 | $56.00 | $77.50 | $82.00 | $43.00 | $69.00 |
| 0022 | Subgrade treatment, type IC (207-09935) | SYS | 2,179 | $40.00 | $36.00 | $17.67 | $51.00 | $40.00 | $42.00 |
| 0023 | Aggregate for end bent backfill (211-06467) | CYS | 39 | $120.00 | $142.00 | $60.00 | $195.00 | $235.00 | $98.00 |
| 0024 | Geotextile for pavement, type 2A (214-12238) | SYS | 2,340 | $3.00 | $4.50 | $5.00 | $2.50 | $4.00 | $4.00 |
| 0025 | Geotextile for pavement, type 2B (214-12239) | SYS | 2,338 | $6.00 | $4.50 | $5.00 | $4.00 | $2.50 | $4.50 |
| 0026 | Compacted aggregate, no. 8 (301-12233) | CYS | 375 | $60.00 | $72.00 | $40.00 | $65.00 | $95.00 | $57.50 |
| 0027 | Compacted aggregate, no. 53 (301-12234) | CYS | 190 | $55.00 | $76.00 | $47.38 | $60.00 | $95.00 | $101.00 |
| 0028 | Subbase for PCCP (302-06464) | CYS | 40 | $150.00 | $276.00 | $50.00 | $178.00 | $150.00 | $217.00 |
| 0029 | Compacted aggregate, no. 53 (303-01180) | TON | 271 | $60.00 | $60.00 | $31.18 | $52.00 | $65.00 | $57.00 |
| 0030 | Milling, transition (306-08043) | SYS | 480 | $12.00 | $15.00 | $20.00 | $19.00 | $22.00 | $14.00 |
| 0031 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 197 | $158.00 | $144.00 | $144.00 | $225.00 | $145.00 | $151.50 |
| 0032 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 268 | $134.00 | $122.00 | $122.00 | $185.00 | $125.00 | $128.50 |
| 0033 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 662 | $119.00 | $108.00 | $108.00 | $140.00 | $110.00 | $113.50 |
| 0034 | Joint adhesive (401-11526) | LFT | 3,804 | $0.27 | $0.25 | $0.25 | $0.25 | $0.25 | $0.50 |
| 0035 | Asphalt for tack coat (406-05520) | TON | 1.10 | $1,200.00 | $1,100.00 | $1,100.00 | $0.01 | $1,100.00 | $1,155.00 |
| 0036 | Guardrail, remove (601-02241) | LFT | 793 | $3.30 | $3.00 | $3.00 | $3.00 | $0.01 | $3.50 |
| 0037 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 175 | $22.00 | $20.00 | $20.00 | $20.00 | $31.00 | $21.00 |
| 0038 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,300.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,700.00 | $3,150.00 |
| 0039 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,190.00 | $2,900.00 | $2,900.00 | $2,900.00 | $3,350.00 | $3,045.00 |
| 0040 | Barrier delineator (602-06729) | EACH | 6 | $33.00 | $18.00 | $30.00 | $29.00 | $30.00 | $145.00 |
| 0041 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 1,992 | $3.00 | $7.04 | $1.68 | $3.50 | $5.00 | $4.00 |
| 0042 | Paved side ditch, type H (607-06370) | LFT | 291 | $150.00 | $172.00 | $100.00 | $195.00 | $210.00 | $91.00 |
| 0043 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 157 | $225.00 | $170.00 | $181.00 | $210.00 | $205.00 | $256.00 |
| 0044 | Right-of-way marker (615-06490) | EACH | 7 | $165.00 | $150.00 | $150.00 | $150.00 | $215.00 | $157.50 |
| 0045 | Monument, type B (615-06505) | EACH | 2 | $1,092.00 | $993.00 | $993.00 | $993.00 | $2,000.00 | $1,043.00 |
| 0046 | Riprap, revetment (616-06405) | TON | 551 | $50.00 | $53.00 | $40.00 | $64.00 | $85.00 | $80.00 |
| 0047 | Geotextile for riprap, type 1A (616-12246) | SYS | 93 | $4.00 | $10.00 | $5.00 | $15.00 | $7.00 | $15.50 |
| 0048 | Geotextile for riprap, type 2A (616-12248) | SYS | 809 | $4.00 | $4.50 | $5.00 | $4.15 | $5.00 | $4.50 |
| 0049 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,320.00 | $725.00 | $725.00 | $1,200.00 | $750.00 | $762.00 |
| 0050 | Mulched seeding, type R (621-06559) | SYS | 5,210 | $2.20 | $1.60 | $1.60 | $2.00 | $1.75 | $2.00 |
| 0051 | Sodding (621-06574) | SYS | 140 | $33.00 | $14.25 | $14.25 | $30.00 | $15.00 | $40.00 |
| 0052 | Sign, 'DO not spray' (621-52448) | EACH | 2 | $143.00 | $125.00 | $125.00 | $250.00 | $125.00 | $131.50 |
| 0053 | Field office, type C (628-09403) | MOS | 10 | $2,750.00 | $3,300.00 | $3,000.00 | $4,000.00 | $3,100.00 | $4,075.00 |
| 0054 | Topsoil processing and distribution (629-000149) | SYS | 5,210 | $3.00 | $11.00 | $5.00 | $2.80 | $3.30 | $17.50 |
| 0055 | Topsoil amendment budget (629-000150) | DOL | 10,420 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0056 | Test pile, indicator, production (701-09558) | LFT | 90 | $90.00 | $128.00 | $103.00 | $107.00 | $145.00 | $105.00 |
| 0057 | Test pile, indicator, restrike (701-09560) | EACH | 2 | $2,000.00 | $2,000.00 | $1,000.00 | $7,000.00 | $2,000.00 | $1,518.00 |
| 0058 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 12 | $300.00 | $210.00 | $200.00 | $150.00 | $130.00 | $125.00 |
| 0059 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 350 | $90.00 | $114.00 | $103.00 | $180.00 | $145.00 | $111.00 |
| 0060 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 4 | $4,000.00 | $2,300.00 | $2,000.00 | $2,500.00 | $2,400.00 | $2,257.00 |
| 0061 | Concrete, C, substructure (702-92857) | CYS | 37.40 | $1,100.00 | $1,480.00 | $1,548.66 | $1,100.00 | $1,950.00 | $938.00 |
| 0062 | Reinforcing bars, epoxy coated (703-06029) | LBS | 46,042 | $1.40 | $2.10 | $2.00 | $2.00 | $1.70 | $1.59 |
| 0063 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 36 | $55.00 | $44.00 | $50.00 | $40.00 | $55.00 | $55.50 |
| 0064 | Concrete, C, superstructure (704-51002) | CYS | 115.30 | $1,225.00 | $1,225.00 | $1,600.00 | $1,350.00 | $1,175.00 | $1,350.00 |
| 0065 | Railing, concrete type FC (706-11600) | CYS | 16.40 | $1,500.00 | $1,059.00 | $2,331.70 | $830.00 | $1,200.00 | $871.50 |
| 0066 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,000.00 | $3,000.00 | $2,800.00 | $2,000.00 | $4,800.00 | $2,100.00 |
| 0067 | Structural member, concrete, bulb-T beam, 42 in. X 49 in. (707-08158) | LFT | 338 | $750.00 | $720.00 | $895.85 | $645.00 | $800.00 | $813.00 |
| 0068 | Surface seal (709-51821) | LS | 1 | $1,800.00 | $500.00 | $15,000 | $1.00 | $1.00 | $2,625.00 |
| 0069 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 54 | $95.00 | $58.00 | $40.00 | $130.00 | $76.00 | $108.00 |
| 0070 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 118 | $20.00 | $26.00 | $15.00 | $11.00 | $12.50 | $17.00 |
| 0071 | Pipe, roadway drain casting extension (715-10238) | EACH | 4 | $1,250.00 | $2,000.00 | $1,500.00 | $750.00 | $1,500.00 | $1,206.00 |
| 0072 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $600.00 | $600.00 | $400.00 | $650.00 | $775.00 | $934.00 |
| 0073 | Longitudinal grooving (722-12732) | SYS | 449 | $10.00 | $9.60 | $14.00 | $9.00 | $7.00 | $15.50 |
| 0074 | Road closure sign assembly (801-04308) | EACH | 5 | $262.00 | $238.00 | $262.00 | $238.00 | $240.00 | $275.50 |
| 0075 | Detour route marker assembly (801-06625) | EACH | 59 | $153.00 | $139.00 | $136.00 | $139.00 | $140.00 | $143.00 |
| 0076 | Construction sign, type A (801-06640) | EACH | 29 | $212.00 | $193.00 | $183.00 | $193.00 | $195.00 | $192.50 |
| 0077 | Maintaining traffic (801-06775) | LS | 1 | $25,000 | $9,840.49 | $36,632 | $4,500.00 | $45,000 | $25,555 |
| 0078 | Barricade, type III-A (801-07118) | LFT | 96 | $16.00 | $14.64 | $13.00 | $14.64 | $15.00 | $14.00 |
| 0079 | Barricade, type III-B (801-07119) | LFT | 96 | $16.00 | $14.64 | $15.00 | $14.64 | $15.00 | $16.00 |
| 0080 | Portable changeable message sign (801-11642) | EACH | 4 | $3,320.00 | $3,019.00 | $2,995.00 | $3,019.00 | $3,100.00 | $3,145.00 |
| 0081 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 38 | $47.00 | $43.00 | $43.00 | $43.00 | $30.00 | $45.50 |
| 0082 | Sign, sheet, and supports, remove (802-07059) | EACH | 1 | $116.00 | $106.00 | $106.00 | $106.00 | $105.00 | $111.50 |
| 0083 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 8 | $191.00 | $174.00 | $175.00 | $174.00 | $71.00 | $183.00 |
| 0084 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,580 | $1.00 | $0.88 | $2.00 | $0.88 | $0.90 | $2.50 |
| 0085 | Grooving for pavement markings (808-12032) | LFT | 1,495 | $1.10 | $1.02 | $2.99 | $1.02 | $1.00 | $3.50 |
| 0086 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 198 | $1.10 | $1.01 | $2.00 | $1.01 | $1.00 | $2.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.