INDOT contract B-44949-A bid tabulation
BRIDGE DECK OVERLAY AND PARTIAL SUPERSTRUCTURE REPLACEMENT. Let by Indiana DOT on August 6, 2025, Greene, Vincennes. 6 bids received; low bid $666,269 by CLR Inc.
- Owner
- Indiana DOT
- Letting
- 06 AUG 2025
- Pay items
- 73
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | CLR Inc | $666,269 | Low |
| 2 | E & B Paving LLC | $778,000 | +17% |
| 3 | Ragle, Inc. | $816,819 | +23% |
| 4 | Force Construction Co Inc | $846,917 | +27% |
| 5 | Pontem Contractors Inc | $892,063 | +34% |
| 6 | Milestone Contractors LP | $970,285 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. CLR Inc | 2. E & B Paving LLC | 3. Ragle, Inc. | 4. Force Construction Co Inc | 5. Pontem Contractors Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $30,000 | $26,528 | $10,000 | $13,520 | $10,395 | $10,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $33,450 | $38,900 | $40,500 | $42,000 | $43,825 | $45,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $2,650.00 | $7,780.00 | $8,000.00 | $2,623.00 | $17,420 | $10,001 |
| 0011 | Pavement removal (202-02240) | SYS | 258.60 | $46.00 | $100.00 | $40.00 | $31.00 | $35.97 | $20.00 |
| 0012 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $26,000 | $32,636 | $75,000 | $22,300 | $102,061 | $50,000 |
| 0013 | Linear grading (203-08607) | LFT | 662.50 | $6.00 | $12.00 | $15.00 | $5.30 | $2.81 | $10.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 10,555.50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $850.00 | $5,500.00 | $7,500.00 | $6,835.00 | $5,292.81 | $20,000 |
| 0016 | Cofferdam (206-51235) | LS | 1 | $4,000.00 | $20,028 | $75,000 | $32,860 | $60,001 | $50,000 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 53 | $115.00 | $100.00 | $68.25 | $108.00 | $41.38 | $75.00 |
| 0018 | Geotextile for pavement, type 2B (214-12239) | SYS | 310 | $7.00 | $7.50 | $9.00 | $7.70 | $5.85 | $6.00 |
| 0019 | Subbase for PCCP (302-06464) | CYS | 64 | $200.00 | $230.00 | $155.00 | $118.00 | $174.35 | $220.00 |
| 0020 | Compacted aggregate, no. 53 (303-01180) | TON | 421 | $40.00 | $106.00 | $46.50 | $46.00 | $50.67 | $50.00 |
| 0021 | HMA patching, full depth, type B (304-12623) | TON | 26 | $304.00 | $270.00 | $270.00 | $407.00 | $425.94 | $385.00 |
| 0022 | HMA patching, partial depth, type B (304-12624) | TON | 53 | $318.00 | $270.00 | $270.00 | $336.00 | $485.49 | $385.00 |
| 0023 | Milling, transition (306-08043) | SYS | 772 | $13.00 | $11.97 | $2.65 | $8.70 | $9.53 | $11.00 |
| 0024 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 65 | $290.00 | $200.00 | $200.00 | $208.00 | $210.00 | $270.00 |
| 0025 | Joint adhesive, surface (401-10258) | LFT | 1,086 | $1.50 | $1.50 | $1.50 | $1.60 | $1.58 | $1.50 |
| 0026 | HMA wedge and level, type B (402-07451) | TON | 115 | $200.00 | $200.00 | $200.00 | $208.00 | $210.00 | $220.00 |
| 0027 | Asphalt for tack coat (406-05520) | TON | 1 | $700.00 | $700.00 | $700.00 | $728.00 | $735.00 | $770.00 |
| 0028 | Guardrail, remove (601-02241) | LFT | 689 | $6.50 | $5.75 | $5.75 | $6.00 | $6.04 | $5.00 |
| 0029 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 300 | $25.50 | $23.00 | $23.00 | $24.00 | $24.15 | $23.00 |
| 0030 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,350.00 | $3,000.00 | $3,000.00 | $3,120.00 | $3,150.00 | $3,000.00 |
| 0031 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,550.00 | $3,200.00 | $3,200.00 | $3,328.00 | $3,360.00 | $3,200.00 |
| 0032 | Barrier delineator (602-06729) | EACH | 4 | $100.00 | $55.00 | $15.00 | $50.00 | $134.73 | $30.00 |
| 0033 | Reinforced concrete bridge approach, 12 in. , modified (609-06259) | SYS | 265.20 | $230.00 | $232.45 | $220.00 | $200.00 | $235.66 | $210.00 |
| 0034 | Right-of-way marker (615-06490) | EACH | 15 | $160.00 | $205.00 | $205.00 | $213.00 | $215.25 | $200.00 |
| 0035 | Monument, type D (615-06515) | EACH | 2 | $130.00 | $171.00 | $171.00 | $178.00 | $179.55 | $171.00 |
| 0036 | Riprap, class 1 (616-05688) | TON | 324 | $115.00 | $102.00 | $195.00 | $118.00 | $244.28 | $190.00 |
| 0037 | Riprap, revetment (616-06405) | TON | 66 | $62.00 | $132.00 | $100.00 | $53.00 | $51.76 | $125.00 |
| 0038 | Geotextile for riprap, type 1A (616-12246) | SYS | 519 | $5.00 | $4.50 | $5.35 | $6.70 | $7.49 | $4.00 |
| 0039 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $175.00 | $100.00 | $100.00 | $208.00 | $210.00 | $200.00 |
| 0040 | Erosion control blanket (621-02770) | SYS | 60 | $8.00 | $6.00 | $6.00 | $42.00 | $42.00 | $40.00 |
| 0041 | Mulched seeding, type R (621-06559) | SYS | 60 | $8.00 | $90.00 | $90.00 | $42.00 | $42.00 | $40.00 |
| 0042 | Sodding (621-06574) | SYS | 27 | $12.00 | $145.00 | $150.00 | $156.00 | $214.32 | $155.00 |
| 0043 | Computer system equipment (628-11976) | EACH | 2 | $100.00 | $525.24 | $750.00 | $918.00 | $1,084.42 | $1,400.00 |
| 0044 | Field office, type D (628-12683) | MOS | 10 | $1,200.00 | $3,600.00 | $3,200.00 | $4,161.00 | $3,332.15 | $4,000.00 |
| 0045 | Field drilled hole in concrete (702-51863) | EACH | 176 | $19.00 | $45.00 | $52.50 | $45.00 | $18.02 | $85.00 |
| 0046 | Reinforcing bars, epoxy coated (703-06029) | LBS | 23,112 | $2.00 | $2.00 | $1.60 | $1.70 | $1.56 | $2.00 |
| 0047 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 12 | $25.00 | $100.00 | $86.50 | $65.00 | $57.73 | $130.00 |
| 0048 | Inertial profiler, bridge encounter (704-000080) | LS | 1 | $9,500.00 | $4,000.00 | $5,500.00 | $9,361.00 | $11,493 | $14,000 |
| 0049 | Corrective grinding, bridge encounter (704-000082) | LS | 1 | $16,000 | $8,500.00 | $9,500.00 | $15,600 | $31,548 | $30,000 |
| 0050 | Concrete, C, superstructure (704-51002) | CYS | 14.80 | $3,800.00 | $3,500.00 | $2,400.00 | $2,899.00 | $2,461.94 | $6,400.00 |
| 0051 | Railing, concrete type FC (706-11600) | CYS | 5.60 | $1,530.00 | $2,574.00 | $2,574.00 | $2,678.00 | $2,702.70 | $5,500.00 |
| 0052 | Concrete bridge railing transition, type TFC , modified (706-11620) | EACH | 4 | $2,500.00 | $1,395.00 | $1,395.00 | $1,451.00 | $1,464.75 | $4,800.00 |
| 0053 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1,400.00 | $1.00 | $1.00 | $2,394.00 | $2,417.15 | $5,682.00 |
| 0054 | Patching concrete structures (710-09158) | SFT | 20 | $88.00 | $192.00 | $125.00 | $193.00 | $224.54 | $250.00 |
| 0055 | Hydrodemolition (722-01066) | SYS | 143.70 | $184.00 | $160.00 | $300.00 | $252.00 | $281.84 | $360.00 |
| 0056 | Bridge deck overlay budget (722-12380) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0057 | Bridge deck, remove concrete surface (722-12464) | SYS | 143.70 | $9.50 | $34.00 | $40.00 | $14.00 | $14.87 | $20.00 |
| 0058 | Longitudinal grooving (722-12732) | SYS | 408.90 | $10.50 | $20.00 | $10.00 | $8.30 | $14.83 | $30.00 |
| 0059 | Bridge deck patching, full depth (722-51401) | SFT | 13 | $30.00 | $85.00 | $180.00 | $151.00 | $72.43 | $375.00 |
| 0060 | Overlay dam (722-51874) | SFT | 90.10 | $25.00 | $52.00 | $30.00 | $36.00 | $53.45 | $70.00 |
| 0061 | Road closure sign assembly (801-04308) | EACH | 9 | $315.00 | $295.00 | $315.00 | $328.00 | $330.75 | $315.00 |
| 0062 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 1,851 | $0.95 | $3.25 | $2.00 | $3.20 | $2.10 | $2.00 |
| 0063 | Detour route marker assembly (801-06625) | EACH | 34 | $140.00 | $98.00 | $128.00 | $133.00 | $134.40 | $128.00 |
| 0064 | Construction sign, type A (801-06640) | EACH | 12 | $155.00 | $165.00 | $140.00 | $146.00 | $147.00 | $140.00 |
| 0065 | Maintaining traffic (801-06775) | LS | 1 | $13,692 | $18,156 | $20,500 | $145,001 | $9,717.29 | $2,500.00 |
| 0066 | Barricade, type III-A (801-07118) | LFT | 96 | $16.50 | $12.00 | $16.55 | $17.00 | $17.38 | $17.00 |
| 0067 | Barricade, type III-B (801-07119) | LFT | 154 | $16.50 | $12.00 | $16.55 | $17.00 | $17.38 | $17.00 |
| 0068 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,234 | $1.00 | $1.25 | $1.25 | $1.30 | $1.31 | $1.50 |
| 0069 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 154 | $1.00 | $3.35 | $1.25 | $1.30 | $1.31 | $1.50 |
| 0070 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 2 | $145.00 | $120.74 | $59.02 | $104.00 | $37.62 | $250.00 |
| 0071 | Snowplowable raised pavement marker (808-75998) | EACH | 6 | $70.00 | $495.00 | $95.00 | $99.00 | $99.75 | $100.00 |
| 0072 | Bridge deck overlay, latex modified (722-51842) | SYS | 143.70 | $304.00 | $283.00 | $255.15 | |||
| 0073 | Bridge deck overlay, silica fume modified (722-01061) | SYS | 143.70 | $280.00 | $250.00 | $360.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 6, 2025. Compiled by Mirage Metrics.